Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

2025 SAFE FOR TEAMS TRAINING EXAM|200Qs&As|LATEST UPDATE EXAM|ALREADY GRADED A+, Exams of Leadership and Team Management

2025 SAFE FOR TEAMS TRAINING EXAM|200Qs&As|LATEST UPDATE EXAM|ALREADY GRADED A+

Typology: Exams

2024/2025

Available from 04/13/2025

purity-kauri
purity-kauri 🇺🇸

1.1K documents

1 / 42

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
2025 SAFE FOR TEAMS TRAINING
EXAM|200Qs&As|LATEST UPDATE EXAM|ALREADY
GRADED A+
How does a team demonstrate progress?
By presenting status slides
By having the Product Owner verbally communicate to the stakeholders
By showing the actual working product
By showing screen shots of the product - ANSWER- By showing the actual working product
What is one responsibility of the Scrum Master?
To prioritize the Team's Backlog
To define the tasks and assign owners
To remove impediments in order to help protect the team
To facilitate the PI Planning session - ANSWER- To remove impediments in order to help
protect the team
Which two statements best describe elements of Continuous Delivery? (Choose two.)
Development and test environments should be separate from production
Automate testing Features and nonfunctional requirements
Maintain manual deployment
Maintain a staging environment that emulates production
Deploy to staging every third Iteration - ANSWER- Development and test environments
should be separate from production
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a

Partial preview of the text

Download 2025 SAFE FOR TEAMS TRAINING EXAM|200Qs&As|LATEST UPDATE EXAM|ALREADY GRADED A+ and more Exams Leadership and Team Management in PDF only on Docsity!

2025 SAFE FOR TEAMS TRAINING

EXAM|200Qs&As|LATEST UPDATE EXAM|ALREADY

GRADED A+

How does a team demonstrate progress? By presenting status slides By having the Product Owner verbally communicate to the stakeholders By showing the actual working product By showing screen shots of the product - ANSWER- By showing the actual working product What is one responsibility of the Scrum Master? To prioritize the Team's Backlog To define the tasks and assign owners To remove impediments in order to help protect the team To facilitate the PI Planning session - ANSWER- To remove impediments in order to help protect the team Which two statements best describe elements of Continuous Delivery? (Choose two.) Development and test environments should be separate from production Automate testing Features and nonfunctional requirements Maintain manual deployment Maintain a staging environment that emulates production Deploy to staging every third Iteration - ANSWER- Development and test environments should be separate from production

What type of information can be easily seen in a cumulative flow diagram? Time to complete a Feature Team capacity Work in process across the team The number of defects that escape to production - ANSWER- Work in process across the team Which process guides the final approval for a release in SAFe? Release Governance Lean Portfolio Management Product Management Continuous Delivery Pipeline - ANSWER- Release Governance The Release Train Engineer is a servant leader who displays which two actions or behaviors? (Choose two.)You have reached the max number of allowed ANSWERs Establishes Feature acceptance criteria Listens and supports teams in problem identification and decision- making Identifies market needs Leads by example Owns Vision and Roadmaps, Program Backlog, and ROI - ANSWER- Leads by example Listens and supports teams in problem identification and decision-making Product Management is responsible for "what gets built" as defined by the Vision, Roadmap, and what else? Program Backlog Key stakeholders

To guarantee no changes are made to the scope during an Iteration To facilitate the team's progress toward the Iteration goals Facilitate more than two teams - ANSWER- To facilitate the team's progress toward the Iteration goals To act as a servant leader and exhibit Lean-Agile Leadership What are three practices of Extreme Programming (XP)? (Choose three.)You have reached the max number of allowed ANSWERs Behavior-driven development Intentional architecture Test-driven development Deployment automation Pair programming Continuous Integration - ANSWER- Pair programming Continuous Integration Test-driven development The Scrum Master wants to establish a team's initial velocity. A team has two testers, three developers, one full-time Scrum Master, and a Product Owner split between two teams. What is their normalized velocity before calculating for time off? 40 32 48

52 - ANSWER- 40

An Agile Team has which two characteristics? (Choose two.) A stand-alone unit of individuals who do not require input from other teams to complete their tasks A group of dedicated individuals who are empowered, self-organizing, self-managing, and deliver value A small group of typically 5 - 11 dedicated individuals who have the skills necessary to define, build, test, and deploy increments of value A large group of individuals who all work together to create value for the client A group of dedicated individuals that work in phase-gate steps to complete their PI Objectives

  • ANSWER- A group of dedicated individuals who are empowered, self-organizing, self- managing, and deliver value A small group of typically 5 - 11 dedicated individuals who have the skills necessary to define, build, test, and deploy increments of value Which statement describes the balance between emergent design and intentional architecture when talking about building in quality? It is required for implementation speed and maturity It is required for speed of value delivery and Solution Intent It is required for speed of development and maintainability

Each team member can define, build, and test a component or Feature - ANSWER- Each team can deliver Features across multiple domains What is one of the six steps in the Problem Solving Workshop? Apply root solution analysis Brainstorm possible failures Identify the biggest root cause using the Pareto Analysis Choose a problem to solve—agreement not required - ANSWER- Identify the biggest root cause using the Pareto Analysis What is the role of the Product Owner? To ensure quality by testing the Solution To prioritize the Program Backlog Estimate the Stories in the Product Backlog To represent the Customer to the Agile Team - ANSWER- To represent the Customer to the Agile Team The daily stand-up timebox should not exceed how many minutes? 5 minutes 20 minutes 15 minutes 10 minutes - ANSWER- 15 minutes A User Story includes which three things? (Choose three.) Who Level of Risk Why

What Definition of Done How - ANSWER- Why Wha t Who What type of visibility should Product Owners provide during the Agile Release Train Sync? Visibility into program Epics and Features Visibility into analysis, approval, and Feature readiness for implementation Visibility into backlog items Visibility into scope and priority adjustments - ANSWER- Visibility into scope and priority adjustments ++ What information does a cumulative flow diagram provide? The cycle time system information which starts the implementation The self-assessment information for the teams The data for the team to identify current bottlenecks The derived predictability data for the team - ANSWER- The data for the team to identify current bottlenecks Which is an example of a part of an Iteration retrospective? Estimation of Stories Team discussion around opportunities for continuous improvement Program level analysis of a problem using root cause analysis techniques Gathering feedback from the stakeholders - ANSWER- Team discussion around opportunities

Communicate the status of the Iteration to all stakeholders Have an emergency Iteration Planning meeting Stop the current Iteration and plan a new Iteration with the new knowledge - ANSWER- Communicate the status of the Iteration to all stakeholders ++ What is a major benefit of reducing batch size? Increases visibility Decreases stress on the system Increases work in process Increases throughput - ANSWER- Increases throughput Which activity happens in the Inspect and Adapt workshop? A demo of the integrated system Refining the Program backlog Planning the next PI A retrospective of the Iteration - ANSWER- A demo of the integrated system A decrease in variability leads to an increase in what? Autonomy Options Predictability Innovation - ANSWER- Predictability What is one recommended way of splitting Features into Stories during a PI Planning event? Develop the user interface (UI) with sample business logic and database access and then add the

actual functionality behind the UI Implement the database structure first and then implement the business logic and user interface Develop the functionality first and then test it on a second pass Implement the simplest variant of the functionality first and then implement the rest as an enhancement - ANSWER- Implement the simplest variant of the functionality first and then implement the rest as an enhancement A team finishes developing all of their Stories in the first six days of the Iteration, tests them in the following two days, and fixes bugs in the days remaining. How is the team behaving? They are abusing the practice of hardening They are ignoring nonfunctional requirements within the Iteration They are waterfalling the Iteration They are applying the Agile development practice of "separation of concerns" - ANSWER- They are waterfalling the Iteration Which statement is true about Features and Stories? Features should be small enough to fit into an Iteration Features can be larger than an Iteration but Stories should be small enough to fit into an Iteration They are prioritized by the team They are estimated like User Stories - ANSWER- Features can be larger than an Iteration but Stories should be small enough to fit into an Iteration What is scrum? A methodology used to deliver usable and reliable solutions to the end user A process for continuously maintaining deployment readiness

They align the team to a common Vision of work in the Iteration They are used to track scope changes over time They are used to measure business value achieved for each Iteration - ANSWER- They align the team to a common Vision of work in the Iteration Which situation should use the Large Solution SAFe configuration? Organizations that need to have System Demos after each Iteration Organizations that operate in an environment that requires compliance for complex, high- assurance systems Organizations that need to scale Agile across the Enterprise Every large Enterprise that uses SAFe - ANSWER- Organizations that operate in an environment that requires compliance for complex, high-assurance systems Which two statements describe an Agile Release Train? (Choose two.) It is the primary value delivery construct in the Scaled Agile Framework It is used to describe large system behaviors that fulfill Customer needs It shows the deliverables for the currently committed PI and offers visibility into the next two PIs It identifies when too much work is in the system which results in multitasking and frequent context switching It is a long-lived, self-organizing, virtual organization of 5 - 12 Agile Teams that plan, commit, and execute together - ANSWER- It is the primary value delivery construct in the

Scaled Agile Framework It is a long-lived, self-organizing, virtual organization of 5 - 12 Agile Teams that plan, commit, and execute together What is one key benefit of a backlog refinement session? It allows the team to state the problem and think about what, where, when, and the impact It provides time to identify dependencies and issues that could impact the next Iteration It is the main way in SAFe for achieving relentless improvement It serves a variety of purposes, including a dedicated time for planning, retrospecting, exploring, and innovating - ANSWER- It provides time to identify dependencies and issues that could impact the next Iteration What best supports Innovation in the SAFe House of Lean? Visualizing work Optimizing the whole Built-in quality Fast learning cycles - ANSWER- Fast learning cycles Which statement describes the information within a Story? A Story provides just enough information for the intent to be understood by both business and technical people

Expedite Standard How can a technical exploration enabler be demo'ed?

  • show the acceptance tests written for the exploration
  • demonstrate working systems in the production environment
  • show the knowledge gained by the exploration
  • explain how the exploration is achieved its larger business objectives - ANSWER-: Enabler Stories - Must fit in Iterations like any Story. Although they may not require the user voice format, their acceptance criteria clarify the requirements and support testing. what does CALMR stand for? - ANSWER- CULTURE of shared responsibility AUTOMATION of Continuous Delivery Pipeline LEAN flow accelerates delivery MEASUREMENT of everything RECOVERY enables low risk releases Which statement describes one element of the CALMR approach to DevOps?
  • Establish a work environment of shared responsibility
  • decentralize decision making
  • build cross-functional Agile Release Trains around the flow of value to the customer
  • keep everything under version control - ANSWER- Establish a work environment of shared responsibility When should a component team be used?
  • to gain the fastest velocity with well-defined interfaces
  • to develop T-shaped skills together with continuous integration
  • to obtain high reuse and technical specialization with a focus on Non-functional Requirements
  • to create each replaceable component with minimized dependencies - ANSWER- to obtain high reuse and technical specialization with a focus on Non-functional Requirements Quality is the first and foremost a function of what in a Lean-Agile environment?
  • Empowered solution authority
  • deployment
  • culture
  • capacity allocation - ANSWER- What is the goal of the SAFe House of Lean model?
  • relentless improvement
  • value
  • innovation
  • flow - ANSWER- - value which activity is key to successfully implementing a Scaled Agile Framework?
  • replace the PI Planning process with the Inspect and Adapt workshop when possible
  • Use the innovation and Planning Iteration instead of the PI Planning process
  • Remove block such as Portfolio estimation
  • Team, Program, Large Solution, Portfolio
  • Epic, Capability, Feature, Story
  • Framework, Theme, Delivery, Iteration - ANSWER- - Team, Program, Large Solution, Portfolio What is an example of a Program event? - ANSWER- Scrum of Scrums Section 5.21 SAFe for teams Which practices are demonstrated during the Inspect and Adapt event?
  • forward focus, develop, cross-domain plan, and expedite execution
  • move forward, analyze future Stories, integrate, and iterate
  • reflect, problem solve, and identify improvement actions
  • new start, job sequence, funnel, and enable - ANSWER- - reflect, problem solve, and identify improvement actions why do Lean-Agile Leaders try to connect the silos of business, system engineering, hardware, ... ?
  • to enforce organizational boundaries between functions
  • to allow friction between the teams
  • to align around value
  • to optimize vertical communication - ANSWER- - to align around value Why is the modified Fibonacci sequence used when estimating?
  • it results in greater precision
  • it can be used to predict unit test coverage
  • it serves as a way to estimate large ranges
  • it reflect the uncertainty in estimating larger items - ANSWER- - it reflect the uncertainty in estimating larger items Which two views does the Iteration Review provide into the Program? (choose two)
  • how the team is responding to the stakeholders how the team is doing on the Program Increment
  • how the team is increasing empowerment
  • how the team is demonstrating transparency of decision-making
  • how the team did on the Iteration - ANSWER- - how the team did on the Iteration
  • how the team is doing on the Program Increment During Iteration Execution, a team's velocity tends to be most affected by what?
  • changing team size, team makeup, and technical context
  • productivity changes, team location, and innovation measures
  • changing financial planners, a new Scrum Master, or new leaders
  • Product Owner changes, changing estimations, and new features - ANSWER- - changing team size, team makeup, and technical context