Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
ARE – SWPPP EXAM 2025 WITH 100% ACCURATE SOLUTIONS
Typology: Exams
1 / 10
This page cannot be seen from the preview
Don't miss anything!
What is an SWPPP? - correct answers ✔✔- Identifies potential sources of stormwater pollution at the construction site
Vegetative cover provides a number of critical benefits in preventing erosion: - correct answers ✔✔- Absorbs the energy of raindrops
Erosion control vs. Sediment Control - correct answers ✔✔- Erosion control measures (mulch, blankets, mats, vegetative cover) protect the soil surface and prevent soil particles from being dislodged and carried away by wind or water.
Fingerprinting - correct answers ✔✔Identifies natural features that you can protect from clearing and heavy equipment by signage or physical barriers. If your site's stormwater flows into a municipal storm drain system, you should: - correct answers ✔✔Determine the ultimate destination of that system's discharge. If your site's stormwater could potentially reach two or more waterbodies, - correct answers ✔✔not that in your SWPPP The principal pollutant of concern is: - correct answers ✔✔sediment Allowable non-stormwater discharges: - correct answers ✔✔- Discharges from fire-fighting activities
Best and cheapest erosion control: - correct answers ✔✔Natural vegetation Temporary-cover BMPs include: - correct answers ✔✔- Temporary seeding
Sediment basins should be located at: - correct answers ✔✔Low-lying areas of the site and on the down-gradient side of bare soil areas where flows converge. Stabilized Construction Exit Length: - correct answers ✔✔At least 50 feet long BMPs - correct answers ✔✔Best Management Practices BMP Erosion control measures: - correct answers ✔✔- Surface roughening, trackwalking, scarifying, sheepsfoot rolling, imprinting
You should not discontinue routine inspections until you have met: - correct answers ✔✔the final stabilization requirements in your permit Final Stabilization - correct answers ✔✔When a uniform, evenly distributed perennial vegetative cover with a density of 70% of the native background cover has been established on all unpaved areas and areas not covered by permanent structures. What will not satisfy the uniform vegetative cover standard? - correct answers ✔✔Stabilizing 7 of 10 slopes, or leaving an area equivalent to 30% of the disturbed area completely unstabilized. EPA regulations specifies that you must retain records and reports required in the permit, including SWPPPs and information used to complete the NOI for: - correct answers ✔✔at least 3 years from the termination of coverage or expiration of the permit.