Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

ARFF EOC Exam with Questions and Answers, Exams of Safety and Fire Engineering

ARFF EOC Exam with Questions and Answers Preventive Maintenace plays a key role in ANSWER✓✓ Reliability, lessens out of service time, reduces frequency of cost of repairs proper tension of engine belts ANSWER✓✓ 1/2 in to 3/4 in Daily checks ANSWER✓✓ pump drive control, pump instruments, hoselines, turrets, agent tanks, auxiliary and cooling systems, fuel tank, aux fire suppression system weekly check ANSWER✓✓ pump and intake strainers, pump gearbox and packing glands, pump pressure and control device, foam transfer pump Method B expansion and drainage test, after obtaining the weight of the foam solution the next step is to.. ANSWER✓✓ obtain the equivalent 25% drainage volume in milliliters 4 types of foam testing ANSWER✓✓ 1. foam solution concentration test 2. turret ground test 3. expansion and drainage test 4. handline and nozzle test daily records ANSWER✓✓ fluid levels, tires, brakes, instrument and gauges, batteries and pump valves periodic records ANSWER✓✓ 4-12 months

Typology: Exams

2024/2025

Available from 02/12/2025

school-inspector
school-inspector 🇺🇸

2

(1)

4.5K documents

1 / 8

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
pf3
pf4
pf5
pf8

Partial preview of the text

Download ARFF EOC Exam with Questions and Answers and more Exams Safety and Fire Engineering in PDF only on Docsity!

Preventive Maintenace plays a key role in ANSWERV ¥ Reliability, lessens out of service time, reduces frequency of cost of repairs proper tension of engine belts ANSWERV V 1/2 in to 3/4 in Daily checks ANSWERYV V pump drive control, pump instruments, hoselines, turrets, agent tanks, auxiliary and cooling systems, fuel tank, aux fire suppression system weekly check ANSWERV ¥ pump and intake strainers, pump gearbox and packing glands, pump pressure and control device, foam transfer pump Method B expansion and drainage test, after obtaining the weight of the foam solution the next step is to.. ANSWERV ¥ obtain the equivalent 25% drainage volume in milliliters 4 types of foam testing ANSWER ¥ 1. foam solution concentration test 2. turret ground test 3, expansion and drainage test 4. handline and nozzle test daily records ANSWERV ¥ fluid levels, tires, brakes, instrument and gauges, batteries and pump valves