



Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A concise guide to army explosives safety site planning (essp) certification exams for 2025-2026. It features a series of questions and answers related to explosives safety, focusing on key aspects such as submission authorities (ddesb) and minimum distance requirements, including inhabited building distance (ibd), public traffic route distance (ptrd), intraline distance (ild), and intermagazine distance (imd). The guide also addresses the documentation required for pes and essp completion, offering practical insights for exam preparation and understanding explosives safety protocols. This material is useful for military personnel and safety officers preparing for certification or seeking to reinforce their knowledge of explosives safety regulations and site planning.
Typology: Exams
1 / 5
This page cannot be seen from the preview
Don't miss anything!
Army Explosives Safety Site Planning Certification Exams 2025-2026 Guide
USATCES has submitted your ESSP for final approval. Who did they submit to? - ANSWER. What is tho minimum distance permitted belween an A&E location and the installation headquarters building? - ANS i} Inhabited Building Distance (IBD) What is the minimum distance permitted between a PES and an interstate highway? - ANSWER- What is the minimum distance permitted between any two operating buildings and sites within an operating lino? - ANSWER Ene eneenD) What is the minimum distance permitted between an earth-covered magazine and a nearby above- ground magazine? - ANS 1) LIntermagazine Distance (MD) What do you call the collection of documents that identifies the relationship between a PES and posed to the PES? - ANSWER-ESSB any facilities or personnel who may be ex Your installation is putting a new roof on an existing PES facility. Do you need to complete an ESSP? \NSWHK-No, this type of change does not reauine one rr rn rn rn nn nnn nnn nnn nnn nn nnn nnn nnn nn nnn nn nnn nse s senses esses essa 4 eee | a Your installation is changing the NEW of an existing facility and will be storing a hazard division not previously approved in it. Do you need to complete an ESSP? - ANSWER Which of the following is a phase of the ESSP process? - ANSWER -DRRSIEneonene How many ESSP categories are there? - ANS WERE how must the ESSP package be submitted? - ANSWER SRS Onieeliy Which three items are in the Maps and Drawings tion of an ESSP package? - ANSWER- Which three items are included in the Evaluations section of an ESSP package? - ANSWER. What part of the ESSP package contains background information, site localion, and reason for the ESSP? - ANSWER-SSSBIBHSENe fs estlasstesesentestteniestentestenteeenteenteterestatertetatatentenesteatereteateteteateteteteieeetebetatatetetetetatetstatanatateteatenatetatetetetatetetatetmetetateatetn | Which three mistakes commonly occur when submitting an ESSP? - ANS VS S-submitting a map The purpose of an ESSP is to ensure safety, provide specifications, and - ANSWER-S31 ILD is the minimum distance permitted between - SIV two operating buildings Your installations is refurbishing an existing PES facility. Do you need to complete an ESSP? - 8010 -Yes, and it requires DDESB approval. You must submit an ESSP for DDESB approval if the installation is - ANSWER-BililgEennS Who must accopl idonlified risks? - ANSWER [ASOM Ooinmianeee Failing to submil.a sucecssfal ESSP can result in impaired operational capability, decreased production, and - ANS JP S-delay in construction Which part of the ESSP package contains background information, site location, and the reason for ESSP submission? - ANSWER-ESSBREMENG eee | a 1? - ANS WER RBA DrOwel All of these are requirements of an ESSP e Which of these requirement must appear on a site map? ~ ANSWER SQ What part of an ESSP package contains blast hazards, fragment hazards, and the glass hazard risk assessment? - ANSWER-BX@IenOns You must submit the ESSP package - VS 1/5 Electronically through secure command Who is responsible for conducting an Army-level review of the ESSP? - ANS WER (SS5GES Who is authorized to sign an ESSP transmittal memorandum? - ANSWENGRSIHOn Which mistake is commonly made when submitting an ESSP? - ANSWER-SiSHInE ED Common ESSP submission errors include failing 1o provide writtcn justification for expedited approval, missing map scale references, inadequate narration, and - ANSWER [iGRenee