






Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Backflow Prevention and Cross Connection Control Exam 2024 Relief valve discharges continuously. Problem May be caused by what 5 faults? - Correct Ans: โโ 1. Faulty No. 1 check valve (F1CV) 2. Faulty No. 2 check valve with backpressure (F2CVwB) 3. Faulty relief valve (FRV) 4. Relief valve plugged sensing |ine(s) (RVPSL) 5. Relief Valve leaking diaphragm (RVLD)
Typology: Exams
1 / 11
This page cannot be seen from the preview
Don't miss anything!
Relief valve discharges continuously. Problem May be caused by what 5 faults? - Correct Ans: โโ
During PVB Check Valve Closing Point Test (Test No. 2), water runs continuously from test cock No. 2. What does this indicate? - Correct Ans: โโ1. Leaky No. 1 shutoff valve During SVB (Either) Test, air inlet valve does not open, as field test kit drops to 0.0 psid. What does this indicate? - Correct Ans: โโ
Requirement: The static differential pressure across check valve # 1 must be greater that the relief valve opening point (as determined in test # 1) and at least 5. psid. What is the purpose and requirement of the DC {Double Check Valve Backflow Prevention Assembly) Test # 1: Tightness of Check Valve # 1 (USC 10th ed pg 278)? - Correct Ans: โโ Purpose: To determine the static differential pressure across check valve # 1. Requirement: The static differential pressure across DC check valve # 1 must be at least 1.0 psid. What is the purpose and requirement of the DC {Double Check Valve Backflow Prevention Assembly) Test # 2: Tightness of Check Valve # 2 (USC 10th ed pg 281)? - Correct Ans: โโ Purpose: To determine the static differential pressure across DC check valve # 2 Reguirement: The static differential pressure across check valve #2 shall be at least 1.0 psid What is the purpose and requirement of the PVB (Pressure Vacuum Breaker Assembly) Test # 1: Air Inlet Valve Opening Point (USC 10th ed pg 291)? - Correct Ans: โโ
Purpose: To determine the pressure in the body when the air inlet valve opens Requirement: The air inlet valve shall open when the pressure in the body is at least 1.0 psid above atmospheric pressure, and the air inlet valve shall be fully open when the water drains from the body. What is the purpose and requirement of the PVB (Pressure Vacuum Breaker Assembly) Test # 2: Tightness of Check Valve (USC 10th ed pg 297)? - Correct Ans: โโ Purpose: To determine the static differential pressure across the check valve. Requirement: The static differential pressure across the check valve shall be at least 1.0 psid. What is the purpose and requirement of the SVB ) Spil-Resistant Pressure Vacuum Breaker Assembly) Test # 1: Tightness of Check Valve (USC 10th ed pg 308)? - Correct Ans: โโ Purpose: To determine the static differential pressure across the check valve. Requirement: The static differential pressure across the check valve shall be at least 1.0 psid.
When testing the RP backflow device, and while observing the gauge, and introducin HP water behind the #2CV (RP Test Procedure 2, Step 3), and the RV begins to discharge, what action(s) do you take to troubleshoot the equipment? - Correct Ans: โโ
When testing the RP backflow device, during the #2 Check Valve Test, you suspect a leaking # 2 Shutoff Valve (Backpressure), what action(s) do you take to troubleshoot the equipment? - Correct Ans: โโ