Highway Construction Plan: Costs & Descriptions for Routes & Bridges in Kentucky & Utah, Slides of Construction

Details about the project costs, types of work, and descriptions for various highway construction projects in Kentucky and Utah. The projects include resurfacing, bridge repairs, and new interchanges, and the document covers multiple counties and routes. The information is organized by county and item number, and includes the type of work, a brief description, the phase of the project, and the funding for each fiscal year.

Typology: Slides

2021/2022

Uploaded on 09/27/2022

rechel--
rechel-- 🇬🇧

4.6

(10)

229 documents

1 / 213

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
CHAPTER 167
Legislative Research Commission PDF Version
1
CHAPTER 167
( HB 202 )
AN ACT relating to road projects and declaring an emergency.
Be it enacted by the General Assembly of the Commonwealth of Kentucky:
Section 1. The projects authorized by the General Assembly in this Act constitute the official 2018-2020
Biennial Highway Construction Plan.
Section 2. The General Assembly acknowledges that the project authorizations contained within this Act
are based on the Transportation Cabinet's estimates. The Transportation Cabinet shall have the authority to expend
funds necessary to complete the projects as authorized in this Act, amended only by variations dictated by bid or
unforeseen circumstances.
Section 3. The Secretary of the Transportation Cabinet shall produce a single document that contains two
separately identified sections, as follows: Section 1 shall detail the enacted fiscal biennium 2018-2020 Biennial
Highway Construction Program and Section 2 shall detail the 2018-2020 Highway Preconstruction Program Plan for
fiscal year 2018-2019 through fiscal year 2022-2024 as identified by the 2018 General Assembly. This document
shall mirror in data type and format the fiscal year 2018-2024 Recommended Six-Year Road Plan as submitted to the
2018 General Assembly. The document shall be published and distributed to members of the General Assembly and
the public within 60 days of adjournment of the 2018 Regular Session of the General Assembly.
Section 4. The Secretary of the Transportation Cabinet shall report by September 30 of each fiscal year to
the Interim Joint Committee on Transportation any project included in the enacted Biennial Highway Construction
Plan which has been delayed beyond the fiscal year for which the project was authorized. The report shall include:
(a) The county name;
(b) The Transportation Cabinet project identification number;
(c) The route where the project is located;
(d) The length of the project;
(e) A description of the project and the scope of improvement;
(f) The type of local, state, or federal funds to be used on the project;
(g) The stage of development for the design, right-of-way, utility, and construction phases;
(h) The fiscal year in which each phase of the project was scheduled to commence;
(i) The estimated cost for each phase of the project;
(j) A detailed description of the circumstances leading to the delay; and
(k) The same information required in paragraphs (a) to (i) of this section for the project or projects
advanced with funds initially scheduled for the delayed project.
Section 5. This Act in conjunction with 2018 Regular Session HJR 74 shall constitute the Six-Year Road
Plan.
Section 6. Whereas the funding for these projects is provided by 2018 Regular Session HB 201, which
takes effect upon its passage and approval by the Governor or upon otherwise becoming law, an emergency is
declared to exist, and this Act takes effect upon its passage and approval by the Governor or upon otherwise
becoming law.
Section 7. The 2018-2020 Biennial Highway Construction Plan is as follows:
Signed by Governor April 13, 2018.
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30
pf31
pf32
pf33
pf34
pf35
pf36
pf37
pf38
pf39
pf3a
pf3b
pf3c
pf3d
pf3e
pf3f
pf40
pf41
pf42
pf43
pf44
pf45
pf46
pf47
pf48
pf49
pf4a
pf4b
pf4c
pf4d
pf4e
pf4f
pf50
pf51
pf52
pf53
pf54
pf55
pf56
pf57
pf58
pf59
pf5a
pf5b
pf5c
pf5d
pf5e
pf5f
pf60
pf61
pf62
pf63
pf64

Partial preview of the text

Download Highway Construction Plan: Costs & Descriptions for Routes & Bridges in Kentucky & Utah and more Slides Construction in PDF only on Docsity!

CHAPTER 167

Legislative Research Commission PDF Version

CHAPTER 167

( HB 202 )

AN ACT relating to road projects and declaring an emergency.

Be it enacted by the General Assembly of the Commonwealth of Kentucky:

Section 1. The projects authorized by the General Assembly in this Act constitute the official 2018-

Biennial Highway Construction Plan.

Section 2. The General Assembly acknowledges that the project authorizations contained within this Act

are based on the Transportation Cabinet's estimates. The Transportation Cabinet shall have the authority to expend

funds necessary to complete the projects as authorized in this Act, amended only by variations dictated by bid or

unforeseen circumstances.

Section 3. The Secretary of the Transportation Cabinet shall produce a single document that contains two

separately identified sections, as follows: Section 1 shall detail the enacted fiscal biennium 2018-2020 Biennial

Highway Construction Program and Section 2 shall detail the 2018-2020 Highway Preconstruction Program Plan for

fiscal year 2018-2019 through fiscal year 2022-2024 as identified by the 2018 General Assembly. This document

shall mirror in data type and format the fiscal year 2018-2024 Recommended Six-Year Road Plan as submitted to the

2018 General Assembly. The document shall be published and distributed to members of the General Assembly and

the public within 60 days of adjournment of the 2018 Regular Session of the General Assembly.

Section 4. The Secretary of the Transportation Cabinet shall report by September 30 of each fiscal year to

the Interim Joint Committee on Transportation any project included in the enacted Biennial Highway Construction

Plan which has been delayed beyond the fiscal year for which the project was authorized. The report shall include:

(a) The county name;

(b) The Transportation Cabinet project identification number;

(c) The route where the project is located;

(d) The length of the project;

(e) A description of the project and the scope of improvement;

(f) The type of local, state, or federal funds to be used on the project;

(g) The stage of development for the design, right-of-way, utility, and construction phases;

(h) The fiscal year in which each phase of the project was scheduled to commence;

(i) The estimated cost for each phase of the project;

(j) A detailed description of the circumstances leading to the delay; and

(k) The same information required in paragraphs (a) to (i) of this section for the project or projects

advanced with funds initially scheduled for the delayed project.

Section 5. This Act in conjunction with 2018 Regular Session HJR 74 shall constitute the Six-Year Road

Plan.

Section 6. Whereas the funding for these projects is provided by 2018 Regular Session HB 201, which

takes effect upon its passage and approval by the Governor or upon otherwise becoming law, an emergency is

declared to exist, and this Act takes effect upon its passage and approval by the Governor or upon otherwise

becoming law.

Section 7. The 2018-2020 Biennial Highway Construction Plan is as follows:

Signed by Governor April 13, 2018.

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

ADAIR KY-704 AM-BRIDGE (P) (^) ADDRESS DEFICIENCIES OF BRIDGE ON KY 704 (11.909) OVER PETTY'S FORK. (001B00078N) (SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

ADAIR KY 55 CONGESTION MITIGTN(O) KY 55 NEW TURNING LANE AT BETTY'S OK

COUNTRY COOKING

CN

Project Cost:

UT

RW

DN

PL

SPP 250,

Total for ADAIR county PL

Total Amounts:

CN

UT

RW

DN

ALLEN KY-100 RECONSTRUCTION(O) IMPROVEMENTS TO KY 100: CURVE, BRIDGE,

AND INTERSECTION IMPROVEMENTS FROM

NEAR THE STONY POINT ROAD INTERSECTION

TO EAST OF THE ALONZO LONG HOLLOW

ROAD INTERSECTION (12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 1,880,

ALLEN KY-100 RECONSTRUCTION(O) IMPROVE KY-100 (OLD GALLATIN ROAD) FROM

SOUTH OF KY-2160 TO KY-980. (06CCN)

CN

UT

RW

DN

PL

SPP 1,250,

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

ANDERSON US-62 SPOT IMPROVEMENTS(O) (^) IMPROVE US-62 (VERSAILLES RD.) FROM HILLTOP DR. TO WEST END OF BRIDGE OVER KENTUCKY RIVER AT TYRONE

CN

Project Cost:

UT

RW

DN

PL

SPP 1,200,

Total for ANDERSON county PL

Total Amounts:

CN

UT

RW

DN 1,200,

BALLARD US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM

STAFFORD ROAD TO BETHEL CHURCH ROAD

(INCLUDES KEVIL BYPASS)(TO BE LET WITH

1-115.10) (06CCR)(12CCR)(14CCR).

CN

Project Cost:

UT

RW

DN

PL

NH 2,500,

BALLARD US-51 AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR REPLACEMENT

OF CAIRO BRIDGE AT OR BESIDE EXISTING

LOCATION. (004B00021N)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 2,500,

BALLARD US-51 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

UT

RW

DN

PL

PM

PM

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

Total for BALLARD county PL

Total Amounts:

CN

UT

RW

DN

BARREN LN-9008 AM-BRG PAINTING(P) LOUIE B NUNN PKWY (LN-9008) BRIDGE

PAINTING, CLEANING, AND MINOR REPAIRS ON

BRIDGE OVER I-65 IN BARREN CO. KY.

005B00067R, 005B00067L (2016BOP)

CN

Project Cost:

UT

RW

DN

PL

NH 500,

BARREN US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 31EX BRIDGE

OVER WATER STREET. (005B00058N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BARREN I-65 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-065 BOTH

DIRECTION(S) FROM MILEPOINT 42.89 TO

MILEPOINT 43.

CN

Project Cost:

UT

RW

DN

PL

PM

PM

BARREN LN-9008 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF LOUIE B.

NUNN CUMBERLAND PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 16.117 TO

MILEPOINT 20.

CN

UT

RW

DN

PL

PM

PM

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

BATH KY-211 AM-BRIDGE (P) (^) ADDRESS DEFICIENCIES OF KY 211 BRIDGE OVER COW CREEK. (006B00043N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BATH US-60 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM 410,

Total for BATH county PL

Total Amounts:

CN

UT

RW

DN

BELL KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE

OVER RED BIRD CREEK. (007B00071N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BELL KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE

OVER RED BIRD CREEK. (007B00072N)

CN

UT

RW

DN

PL

BR

BR

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

BELL CR-1041 AM-BRIDGE (P) (^) ADDRESS DEFICIENCIES OF CR-1041 BRIDGE OVER YORK BRANCH. (007C00003N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BELL KY-92 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 92 BRIDGE OVER

GREASY CREEK. (007B00040N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BELL KY-2012 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT, SCHOOL BUS SAFETY ISSUE.

CN

Project Cost:

UT

RW

DN

PL

PM

PM

Total for BELL county PL

Total Amounts:

CN

UT

RW

DN

BOONE I-75 I-CHANGE RECONST(O) IMPROVE THE KY-536 (MT. ZION ROAD)

INTERCHANGE. (14CCR)(16CCR)

CN

UT

RW

DN

PL

NH 5,430,

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

BOONE -0 MATCHED FED FUNDS(O) (^) NORTHERN KENTUCKY RIDESHARE PROGRAM. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 414,

BOONE -0 MATCHED FED FUNDS(O) NORTHERN KENTUCKY RIDESHARE PROGRAM.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 44,

BOONE -0 MATCHED FED FUNDS(O) NORTHERN KENTUCKY RIDESHARE PROGRAM.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 44,

BOONE -0 MATCHED FED FUNDS(O) OKI REGIONAL TRANSPORTATION PLANNING.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 280,

BOONE -0 MATCHED FED FUNDS(O) OKI REGIONAL TRANSPORTATION PLANNING.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

UT

RW

DN

PL

SNK 56,

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

BOONE -0 MATCHED FED FUNDS(O) (^) OKI REGIONAL TRANSPORTATION PLANNING. (FUNDING SUBJECT TO FISCAL CONSTRAINT PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 56,

BOONE -0 MATCHED FED FUNDS(O) N KY PLANNING FY18 AIR QUALITY, FIAM, LAND

USE, RIDESHARE. (2016BOP)

CN

Project Cost:

UT

RW

DN

PL SNK 150,

BOONE -0 MATCHED FED FUNDS(O) N KY PLANNING FY 2019 AIR QUALITY, FIAM,

LAND USE, RIDESHARE. (2016BOP)

CN

Project Cost:

UT

RW

DN

PL SNK 150,

BOONE -0 MATCHED FED FUNDS(O) N KY PLANNING FY 2020 AIR QUALITY, FIAM,

LAND USE, RIDESHARE.

CN

Project Cost:

UT

RW

DN

PL SNK 150,

BOONE KY-237 MATCHED FED FUNDS(O) INCREASE THROUGH LANE CAPACITY ON KY

237 FROM I-275 RAMPS TO CARDINAL WAY AND

IMPROVE WORLDWIDE BLVD WITH TWO-WAY

LEFT TURN AND ADDITIONAL RIGHT TURN TO SB

KY 237. (2012BOP)(ADM. BY KYTC)

CN

UT

RW

DN

PL

SNK 3,000,

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

BOONE KY-3076 BIKE/PED FACIL(O) (^) CONSTRUCT NEW SIDEWALKS, DEDICATED BIKE LANES AND RETAINING WALLS ALONG DOLWICK ROAD TO MINEOLA PIKE TO OLYMPIC BLVD IN THE CITY OF ERLANGER. (2016 BOP) CN Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

BOONE CR-1001 MATCHED FED FUNDS(O) ADD A LEFT TURN LANE ON SB CAMP ERNST

ROAD AT LONGBRANCH ROAD (2016BOP).

CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

BOONE KY-236 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION

ALONG KY-236 (DONALDSON ROAD) FROM

KY-842 (HOUSTON ROAD) TO KY-

(MINEOLA PIKE).

CN

Project Cost:

UT

RW

DN

PL STP

STP

BOONE KY-3076 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND REDUCE

CONGESTION ON KY-3076 (MINEOLA PIKE)

FROM KY-236 TO I-275.

CN

Project Cost:

UT

RW

DN

PL

STP 1,500,

BOONE US-42 NEW ROUTE(O) PROVIDE EAST-WEST CONNECTIVITY AND

IMPROVED MOBILITY FROM KY-237 (PLEASANT

VALLEY ROAD) THRU KY-842 (HOPEFUL

CHURCH ROAD) TO MALL ROAD/I-

INTERCHANGE.

CN

UT

RW

DN

PL

NH 1,500,

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

BOONE -0 SAFETY(P) (^) SPOT IMPROVEMENTS AND CONGESTION MITIGATION IN BOONE COUNTY FOR AMAZON DEVELOPMENT.

CN

Project Cost:

UT

RW

DN

PL

SPP 2,000,

BOONE -0 PREFINANCD CONVRSN(O) SPOT IMPROVEMENTS AND CONGESTION

MITIGATION IN BOONE COUNTY FOR AMAZON

DEVELOPMENT. (ADDITIONAL FUNDING FOR

CN

Project Cost:

UT

RW

DN

PL

SPP 2,000,

BOONE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED AREA AND

SUBJECT TO MPO CONTROL FOR FY 2018.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 35,140,

BOONE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED AREA AND

SUBJECT TO MPO CONTROL FOR FY 2019

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 9,100,

BOONE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED AREA AND

SUBJECT TO MPO CONTROL FOR FY 2020.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

UT

RW

DN

PL

SNK 9,200,

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

BOONE KY-237 RECONSTRUCTION(O) (^) RECONSTRUCT GUNPOWDER RD. FROM US- TO KY-

CN

Project Cost:

UT

RW

DN

PL

SPP 1,000,

BOONE KY-237 CONGESTION MITIGTN(O) EXPANSION OF ROUNDABOUTS ALONG KY-

AT CARDINAL COVE AND GRAVES RD

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

BOONE US 42 AIR QUALITY(P) INCREASE CAPACITY AND REDUCE CONGESTION

ON US 42 AT I 71/

CN

Project Cost:

UT

RW

DN

PL

SPP 650,

Total for BOONE county PL

Total Amounts:

CN

UT

RW

DN

BOURBON KY-3364 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STRUCTURE OVER

SCOTTS CREEK ON KY 3364, 0.7 MILE NORTH

OF US 460 AT NORTH MIDDLETOWN (BRIDGE

IMPROVEMENTS). (03KYDN)(2012BOP) (16CCN)

CN

UT

RW

DN

PL

KYD 1,568,

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

BOURBON US-460 RECONSTRUCTION(O) (^) IMPROVE US-460 FROM RUSSELL CAVE ROAD TO US-27 BYPASS IN PARIS.(12CCN)(14CCR) (16CCR)

CN

Project Cost:

UT

RW

DN

PL

STP

STP

BOURBON CR-1205 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOUSTON ANTIOCH

RO BRIDGE OVER HOUSTON CREEK.

(009C00031N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BOURBON CR-1320 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK ROAD

BRIDGE OVER CSX RR. (009R00605N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BOURBON US-68 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

Total for BOURBON county PL

Total Amounts:

CN

UT

RW

DN

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

BOYD US-23 SAFETY(P) (^) SAFETY UPGRADES AND CONSTRUCT TURN LANES ON US-23 AT 12TH STREET - CATLETTSBURG. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 920,

BOYD US-23 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON 12TH STREET

BRIDGE OVER THE OHIO RIVER. JOINT PROJECT

WITH OHIO. (010B00040N)(BSBP)

CN

Project Cost:

UT

RW

DN

PL

BR 1,750,

BOYD US-60 AM-BRIDGE (P) PAINTING AND PREVENTIVE MAINTENANCE ON

CATLETTSBURG KENOVA BRIDGE ON 35TH ST.

OVER THE OHIO RIVER. JOINT PROJECT WITH

OHIO. (010B00062N)(BSBP)

CN

Project Cost:

UT

RW

DN

PL

BR 1,200,

BOYD I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON PERRY GENTRY

BRIDGES OVER THE BIG SANDY RIVER. JOINT

PROJECT WITH WEST VIRGINIA. (010B00046L

AND 010B00046R)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 1,500,

BOYD KY-854 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 854 BRIDGE

OVER GARNER CREEK. (010B00045N)

CN

UT

RW

DN

PL

BR

BR

County Item No. Route Type of Work Description Phase Fund FY 2018^ FY 2019^ FY 2020

BOYD I-64 AM-PAVEMENT (INT)(P) (^) ADDRESS PAVEMENT CONDITION OF I-064 BOTH DIRECTION(S) FROM MILEPOINT 180.812 TO MILEPOINT 183.

CN

Project Cost:

UT

RW

DN

PL

PM

PM

Total for BOYD county PL

Total Amounts:

CN

UT

RW

DN

BOYLE US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 68 AND US 150

BRIDGE OVER CHAPLIN RIVER, PERRYVILLE.

(SEE 7-242.01 FOR HPP FUNDS)

(2005HPP-KY134)(011B00042N)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 1,253,

BOYLE US-68 AM-BRIDGE (P) REPLACE U.S. 68 AND U.S. 150 BRIDGE OVER

CHAPLIN RIVER, PERRYVILLE. 011B00042N

(2005HPP-KY134)(EARMARK DOES NOT COVER

TOTAL PROJECT COST OF $1,790,000).(SD)

CN

Project Cost:

UT

RW

DN

PL

HPP 487,

Total for BOYLE county PL

Total Amounts:

CN

UT

RW

DN