Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
The _________ consists of daily checks of the work to assure continuing compliance with contract requirements ✔✔Follow-up Phase Design-Build contracts require ✔✔The QC Manager to be in place and take an active role in the review and coordination of the design. Which of the following is included in all three phases of the Three Phases of Control? ✔✔Safety The purpose of Construction Quality Management is to ✔✔Achieve the quality established by properly developed requirements through the combined responsibility, but separate, efforts of contractors
Typology: Exams
1 / 7
This page cannot be seen from the preview
Don't miss anything!
The _________ consists of daily checks of the work to assure continuing compliance with contract requirements ✔✔Follow-up Phase
Design-Build contracts require ✔✔The QC Manager to be in place and take an active role in the review and coordination of the design.
Which of the following is included in all three phases of the Three Phases of Control? ✔✔Safety
The purpose of Construction Quality Management is to ✔✔Achieve the quality established by properly developed requirements through the combined responsibility, but separate, efforts of contractors and government personnel
Testing is extremely important in construction quality management and is performed by ✔✔Both the contractor and the government
The primary purpose of the Three-Phase Control System is to ✔✔Require the contractor to plan, schedule, and perform quality management actions to assure work meets all specified quality standards
Quality Assurance Personnel have the responsibility to ✔✔Require the contractor to maintain the quality specified in the plans and specifications
The _________________ is the appropriate time to assure that all materials and/or equipment have been tested, submitted, and approved ✔✔Preparatory Phase
The Preconstruction Conference and Coordination and Mutual Understanding Meeting Are ✔✔Conducted prior to the commencement of any physical construction work
Contractor testing procedures: ✔✔Are specified in the technical specs, outlined in the QCP, and addressed at Coordination and Mutual Understanding Meeting
The Quality Control Plan contains ✔✔Identification of individual quality quality control personnel, including name, qualifications, assigned duties, responsibilities and authorities.
The success or failure of all contractors is based upon ✔✔The ability to control costs, finance work, estimate jobs, schedule the work and maintain effective quality control
The contract requires the contractor to submit quality control reports ✔✔Daily
All submittals for government approval must be provided by the _________________ in time to allow for the review, approval, procurement, delivery, and performance of preparatory phase for an item before it is needed for construction. ✔✔Contractor to the Government
Partnering relationships are based upon ✔✔Building trust and dedication to common goals
ENG Form 4288-R, the submittal register: ✔✔Identifies those submittals identified in the contract and the corresponding submittal action codes
What is a purpose of the Coordination and Mutual Understanding Meeting? ✔✔The government and contractor meet to discuss implementation of the QC plan
Characteristics that describe a definable feature of work include: ✔✔Cross-referenced listings to the contractor's construction schedule that may have more than one definable feature under a section of the specifications
Requests for Information are submitted to ✔✔Ask for clarification of the contract
The ___________ is workmanship oriented, and where workmanship standards are established ✔✔Initial Phase
Grounds for withholding payment include the contractors failure to: ✔✔Perform in accordance with the terms of the contract, provide an acceptable QCP, and build to the quality standards established by the contract.
The contractor quality control organization: ✔✔May vary in size depending on the work being performed at a point in time.
A definable feature of work: ✔✔Can consist of a combination of multiple specification sections depending upon the nature of the work
Actual construction on the jobsite begins: ✔✔After an interim or final QC is accepted
Construction Quality Management is the performance of tasks, which ensure that construction is performed: ✔✔According to plans and specifications, on time, within a defined budget and a safe work environment
A cumulative list of job deficiencies/rework items can be found in: ✔✔A deficiency tracking system/reworks items list that is typically maintained in RMS
Inspection is: ✔✔The process by which ongoing and completed work is examined
It is the responsibility of Quality Assurance Personnel to: ✔✔Periodically verify that the contractor's system of control is working effectively