CQM-C Exam | New 2025 / 2026 Update | Construction Quality Management for Contractors |Q&A, Exams of Construction

CQM-C Exam | New 2025 / 2026 Update | Construction Quality Management for Contractors | Questions and Answers | GRADED A

Typology: Exams

2024/2025

Available from 07/08/2025

TheAcademicAce
TheAcademicAce 🇺🇸

583 documents

1 / 11

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
CQM-C Exam | New 2025 / 2026 Update |
Construction Quality Management for
Contractors | Questions and Answers |
GRADED A
….,LK,…..,,
Question:
The purpose of Construction Quality Management is to:
Answer:
Achieve the quality established by properly developed requirements through the combined
responsibility, but seperate efforts of contractpr smd government personnel.
Question:
Construction Quality Management is the performance of tasks, which ensure that construction is
performed.
Answer:
According to plans and specifications, on time, within a defined budget and a safe work
environment.
Question:
Partnering relationships are based upon:
Answer:
Building trust and dedication to common goals
pf3
pf4
pf5
pf8
pf9
pfa

Partial preview of the text

Download CQM-C Exam | New 2025 / 2026 Update | Construction Quality Management for Contractors |Q&A and more Exams Construction in PDF only on Docsity!

CQM-C Exam | New 2025 / 2026 Update |

Construction Quality Management for

Contractors | Questions and Answers |

GRADED A

….,LK,…..,,

Question:

The purpose of Construction Quality Management is to:

Answer:

Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel.

Question:

Construction Quality Management is the performance of tasks, which ensure that construction is performed.

Answer:

According to plans and specifications, on time, within a defined budget and a safe work environment.

Question:

Partnering relationships are based upon:

Answer:

Building trust and dedication to common goals

Question:

It is the responsibility of Quality Assurance Personnel to:

Answer:

Periodically verify that the contractors system of control is working effectively.

Question:

An effective contractor quality control program will:

Answer:

Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits.

Question:

The success or failure of all contractors is based upon:

Answer:

The ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective quality control.

Question:

Quality Assurance Personnel have the responsibility to:

Answer:

Require contractors to maintain the quality specified in the plans and specifications.

Question:

The _____________________ consists of daily checks of the work to assure continuing compliance with contract requirements.

Answer:

Follow-up phase

Question:

The Quality Assurance Plan:

Answer:

Is a government management tool establishing staffing, training, pre-award activities, and surveillance activities.

Question:

Testing is extremely important in construction quality management and is performed by:

Answer:

Both the contractor and the government

Question:

If the contractor does not provide an adequate superintendent, the contract allows the contracting officer to:

Answer:

Require the contractor to assume personal supervision of the work.

Question:

The Quality Control Plan:

Answer:

Is the foundation upon which quality work is based and outlines planned quality control procedures.

Question:

Tests that are unannounced, randomly performed, and repeat quality control tests are:

Answer:

Quality Assurance tests

Question:

If initial review of the quality control plan shows it to be unacceptable:

Answer:

The contractor makes changes before acceptance.

Question:

The contractor quality control organization:

Answer:

May vary in size depending on the work being performed at a point in time.

Question:

The Quality Control Plan contains:

Answer:

Safety.

Question:

Submittals are:

Answer:

Necessary to demonstrate that the proposed materials, etc. are in compliance with the contract.

Question:

All submittals for government approval must be provided by the _________________ in time to allow for the review, approval, procurement, delivery, and performance of preparatory phase for an item before it is needed for construction.

Answer:

Contractor to the Government

Question:

The means for enforcing contract compliance are provided in the:

Answer:

Contract clauses of the contract.

Question:

ENG Form 4288-R, the submittal register:

Answer:

Identifies those submittals requiring government approval

Question:

The primary purpose of the Three-Phase control system is to:

Answer:

Require the contractor to plan and schedule his work.

Question:

The contractor is required to conduct a preparatory phase meeting before he begins any definable feature of work except when:

Answer:

There are no exceptions to the rule.

Question:

The ____________________ is the appropriate time to assure that all materials and/or equipment have been tested, submitted, and approved.

Answer:

Preparatory phase

Question:

The ____________________ is workmanship oriented, and where workmanship standards are established.

Perform in accordance with the terms of the contract, provide a Quality Control Plan giving assurance of intent and ability to comply with quality standards, and build to the quality standards established by the contract.

Question:

Actual construction on the job site begins:

Answer:

After an interim or final QC Plan is accepted.

Question:

Contractor testing procedures:

Answer:

Are outlined in the Quality Control Plan as defined by Section 01450N/01451A and addressed at the Coordination and Mutual Understanding Meeting (Navy).

Question:

Requests for information are submitted to:

Answer:

Ask for clarification of the contract

Question:

Design-Build contracts require:

Answer:

The QC Manager to be in place and take an active role in the review and coordination of the design.