DSR &NON DSR ITEM submission, Assignments of Construction management

dsr and non dsr item rate analysis

Typology: Assignments

2020/2021

Uploaded on 04/19/2021

nisha-verma-5
nisha-verma-5 🇮🇳

1 document

1 / 9

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
DSR & NON-DSR ITEMS
S C H O O L OF PLANNING A N D A R C H I T E C T U R E ,
N E W D E L H I
M A S T E R S O F B U I L D I N G E N G I N E E R I N G &
MANAGEMENT
BAT C H 2 0 2 0 - 2022
PROJECT COST AND CONTRACT MANAGEMENT
NISHA VERMA I MBEM/809
NISHA VERMA I MBEM/809
pf3
pf4
pf5
pf8
pf9

Partial preview of the text

Download DSR &NON DSR ITEM submission and more Assignments Construction management in PDF only on Docsity!

DSR & NON-DSR ITEMS

S C H O O L O F P L A N N I N G A N D A RC H I T E C T U R E ,

N E W D E L H I

M A S T E R S O F B U I L D I N G E N G I N E E R I N G &

M A N A G E M E N T

B AT C H 2 0 2 0 - 2 0 2 2

PROJECT COST AND CONTRACT MANAGEMENT

NISHA VERMA I MBEM/

NISHA VERMA I MBEM/

S. No. Description Unit Quantity Rate Amount

(DAR

Providing and fixing fire resistant door frame of section 50 x 60 mm on horizontal side & 35 x 60 mm on vertical sides having built in rebate made out of 1.6 mm thick

GI sheet ( Zinc coating not less than 120gm/m²) suitable for mounting 120 min Fire Rated Glazed Door Shutters. The frame shall be filled with Mineral wool Insulation

having density min 96Kg/m³. The frame will have a provision of G.I. Anchor fastners 14 nos ( 5 each on vertical style & 4 on horizontal style of size M10 x 80 ) suitable

for fixing in the opening along with Factory made Template for SS Ball Bearing Hinges of Size 100x89x3mm for fixing of fire rated glazed shutter. The frame shall be

finished with a approved fire resistant primer or Powder coating of not less than 30 micron in desired shade as per the directions of Engineer - in- charge. (Cost of SS

ball bearing hinges is excluded).

Details of cost for 5.81 metre (2.05 + 1.71 + 2.05) (Door size-

1710 x 2050 mm)

1.1.1 MATERIAL

Fire Rated door Frame made with 1.6 mm thick G.I. Sheet (

minutes) metre 5.81 1000.00 5810.

1.1.2 LABOUR 0.

1.1.2.1 For fixing in position all complete L.S. 130.00 2.00 260.

Sundries and carriage ( Fasteners, sims,

Hole Plugs etc) L.S. 250.00 2.00 500.

TOTAL 6570.

Add 1 % Water charges on "W" 65.

TOTAL 6635.

Add GST on "X" (multiplying factor 0.1405) 932.

TOTAL 7568.

Add 15% CPOH on "Y" 1135.

TOTAL 8703.

Add Cess @ 1% on "Z" 87.

Cost of 5.81 metres 8790.

Cost of 1 metre 1512.

Say 1512.

For a door shutter of length 2.1m + 1.2m +2.1m =5.4 Sqm

TOTAL metre 5.40 8169.

DSR ITEM - FIRE RESISTANT DOOR

S. No. Description Unit Quantity Rate Amount

(1.3) DAR

Providing and fixing glazing in fire resistant door shutters with G.I. beading made out of 1.6 mm thick G.I. sheet (zinc coating not less than 120 gm/m²) of

size 20 x 33 mm screwed with M4 x 38 mm SS screws at distance 75 mm from the edges and 150 mm c/c , including applying a coat of approved fire resistant

primer/powder coating of not less than 30 micron on G.I. beading, & special ceramic tape of 5 x 20 mm size etc complete in all respect as per NBC 2016, IS

16231 (Part 3):2016 and as per direction of Engineer-in-charge with glass of required thickness having 120 minutes of fire resistance both integrity & radiation

control (EW120) and minimum 20 minutes of insulation (EI20). The manufacturer have to give test report/certification of fire glass and the glass should have the

stamp showing the value of E, EW & EI. The glass shall be tested in approved NABL accredited lab or by any other accreditation body which operates in

accordance with ISO/IEC 17011 and accredits labs as per ISO/IEC 17025 for testing and calibration scopes shall be eligible. The maximum glazing size shall

not be more than 1100x2200 mm (w x h) or 2.42 sqm.

Details of cost for Glazing portion 2.46 sqm (Door size 1710 mm x 2050 mm), Glazing area- 2x0.679x1.808= 2.46 sqm

MATERIAL

Glass panes of required thickness having 120 minutes of fire resistance both

integrity and radiation control (EW

  1. and minimum 20 minutes of Insulation (EI 20) sqm 2.46 25000.00 61500.

1.3.1.1 G.I. U beading of 1.6 mm thick G.I. Sheet with M4x38mm SS screws metre 9.91 245.00 2427.

1.3.1.2 Ceramic tape 5x20 mm size metre 19.82 410.00 8126.

1.3.1.3 LABOUR

1.3.2 For fixing in position all complete L.S. 180.00 2.00 360.

1.3.2.1 Sundries and carriage & Calcium Silicate Blocks L.S. 10.00 2.00 20.

TOTAL 72434.

Add 1 % Water charges on "W" 724.

TOTAL 73158.

Add GST on "X" (multiplying factor 0.1405) 10278.

TOTAL 83437.

Add 15% CPOH on "Y" 12515.

TOTAL 95952.

Add Cess @ 1% on "Z" 959.

Cost of 2.46 sqm 96912.

Cost of 1 sqm 39395.

Say 39395.

For glazing area of 0.75m x 0.3m = 0.23sq.m.

TOTAL metre 0.23 8863.

S. No. Description Unit Quantity Rate Amount

(1.4) DAR

Providing and fixing bright /matt finished Stainless Steel handles of approved

quality & make with necessary screws etc all complete.

125 mm

Details of cost for ten nos (125 mm)

1.4.1 MATERIAL

Stainless steel fancy handles (125mm)

for kitchen cabinet 10 Nos 1.00 640.00 640.

1.4.1.2 SS screws 20mm 100 Nos. 0.40 125.00 50.

1.4.1.3 Carriage of material L.S. 1.82 2.00 3.

1.4.2 LABOUR

1.4.2.2 Carpenter 1st class day 0.06 738.00 44.

TOTAL 737.

Add 1 % Water charges on "W" 7.

TOTAL 745.

Add GST on "X" (multiplying factor 0.1405) 104.

TOTAL 850.

Add 15% CPOH on "Y" 127.

TOTAL 977.

Add Cess @ 1% on "Z" 9.

Cost of 10 nos 987.

Cost of 1 no 98.

Say 98.

Cost for fixing 1 Stainless Steel handles

TOTAL Nos 1 98.

Cost for providing and fixin 1 fire resistant doors of size 1.2m x 2.1m

Cost for item

description (1.1 +

Therefore,

Cost for providing and fixing 7 fire resistant doors of size 1.2m x 2.1m 38248.47 x 7 267739.

Main beam and cross tee (made of Armstrong PRELUDE XL Fire Guard

  • 2.1.
    • 24mm Exposed Tee) 252m + 5addwastage@5% =12.6 m metre 264.6 133 35191.
  • 2.1.
    • 40 mm long with 6 mm dia bolt metre Dash hold fastener 12.5 mm dia,
  • 2.1.6Sundries like rawl plug scaffolding etc L.S.
  • 2.1.7Carriage of material etc L.S.
  • 2.2.1Carpenter 2nd class sqm 31.104 679 1178. 2.2LABOUR
  • 2.2.2Beldar sqm 31.104 558 1044.
  • 2.2.2Painter sqm 2.43 430 1044.
    • TOTAL 205814.
    • Add 1 % Water charges on "W" 2058.
    • TOTAL 207873.
    • Add GST on "X" (multiplying factor 0.1405) 29206.
    • TOTAL 237079.
    • Add 15% CPOH on "Y" 35561.
    • TOTAL 272641.
    • Add Cess @ 1% on "Z" 2726.
    • Cost of 81 sq.m. 275367.
    • Cost of 1 no 3399.
    • Say 3399.
    • TOTAL Sq.m. 298.4 10,14,440. For a commomn dinning area of area 298.4 sq.m

SQUARE THE GRID

by measuring across the diagonal

of the grid opening

INSTALL THE FIRST MAIN BEAM

INSTALL HANGERS AND FASTENERS

INSTALL PERIMETER TRIM

INSTALL PANELS

Tilt panels above frame and

drop into place

INSTALLATION PROCESS

.

MEMBER DETAILS

.