Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
dsr and non dsr item rate analysis
Typology: Assignments
1 / 9
This page cannot be seen from the preview
Don't miss anything!
PROJECT COST AND CONTRACT MANAGEMENT
S. No. Description Unit Quantity Rate Amount
Providing and fixing fire resistant door frame of section 50 x 60 mm on horizontal side & 35 x 60 mm on vertical sides having built in rebate made out of 1.6 mm thick
GI sheet ( Zinc coating not less than 120gm/m²) suitable for mounting 120 min Fire Rated Glazed Door Shutters. The frame shall be filled with Mineral wool Insulation
having density min 96Kg/m³. The frame will have a provision of G.I. Anchor fastners 14 nos ( 5 each on vertical style & 4 on horizontal style of size M10 x 80 ) suitable
for fixing in the opening along with Factory made Template for SS Ball Bearing Hinges of Size 100x89x3mm for fixing of fire rated glazed shutter. The frame shall be
finished with a approved fire resistant primer or Powder coating of not less than 30 micron in desired shade as per the directions of Engineer - in- charge. (Cost of SS
ball bearing hinges is excluded).
Details of cost for 5.81 metre (2.05 + 1.71 + 2.05) (Door size-
1710 x 2050 mm)
Fire Rated door Frame made with 1.6 mm thick G.I. Sheet (
minutes) metre 5.81 1000.00 5810.
1.1.2.1 For fixing in position all complete L.S. 130.00 2.00 260.
Sundries and carriage ( Fasteners, sims,
Hole Plugs etc) L.S. 250.00 2.00 500.
Add 1 % Water charges on "W" 65.
Add GST on "X" (multiplying factor 0.1405) 932.
Add 15% CPOH on "Y" 1135.
Add Cess @ 1% on "Z" 87.
Cost of 5.81 metres 8790.
Cost of 1 metre 1512.
Say 1512.
For a door shutter of length 2.1m + 1.2m +2.1m =5.4 Sqm
TOTAL metre 5.40 8169.
DSR ITEM - FIRE RESISTANT DOOR
S. No. Description Unit Quantity Rate Amount
Providing and fixing glazing in fire resistant door shutters with G.I. beading made out of 1.6 mm thick G.I. sheet (zinc coating not less than 120 gm/m²) of
size 20 x 33 mm screwed with M4 x 38 mm SS screws at distance 75 mm from the edges and 150 mm c/c , including applying a coat of approved fire resistant
primer/powder coating of not less than 30 micron on G.I. beading, & special ceramic tape of 5 x 20 mm size etc complete in all respect as per NBC 2016, IS
16231 (Part 3):2016 and as per direction of Engineer-in-charge with glass of required thickness having 120 minutes of fire resistance both integrity & radiation
control (EW120) and minimum 20 minutes of insulation (EI20). The manufacturer have to give test report/certification of fire glass and the glass should have the
stamp showing the value of E, EW & EI. The glass shall be tested in approved NABL accredited lab or by any other accreditation body which operates in
accordance with ISO/IEC 17011 and accredits labs as per ISO/IEC 17025 for testing and calibration scopes shall be eligible. The maximum glazing size shall
not be more than 1100x2200 mm (w x h) or 2.42 sqm.
Details of cost for Glazing portion 2.46 sqm (Door size 1710 mm x 2050 mm), Glazing area- 2x0.679x1.808= 2.46 sqm
Glass panes of required thickness having 120 minutes of fire resistance both
integrity and radiation control (EW
1.3.1.1 G.I. U beading of 1.6 mm thick G.I. Sheet with M4x38mm SS screws metre 9.91 245.00 2427.
1.3.1.2 Ceramic tape 5x20 mm size metre 19.82 410.00 8126.
1.3.2 For fixing in position all complete L.S. 180.00 2.00 360.
1.3.2.1 Sundries and carriage & Calcium Silicate Blocks L.S. 10.00 2.00 20.
Add 1 % Water charges on "W" 724.
Add GST on "X" (multiplying factor 0.1405) 10278.
Add 15% CPOH on "Y" 12515.
Add Cess @ 1% on "Z" 959.
Cost of 2.46 sqm 96912.
Cost of 1 sqm 39395.
Say 39395.
For glazing area of 0.75m x 0.3m = 0.23sq.m.
TOTAL metre 0.23 8863.
S. No. Description Unit Quantity Rate Amount
Providing and fixing bright /matt finished Stainless Steel handles of approved
quality & make with necessary screws etc all complete.
125 mm
Details of cost for ten nos (125 mm)
Stainless steel fancy handles (125mm)
for kitchen cabinet 10 Nos 1.00 640.00 640.
1.4.1.2 SS screws 20mm 100 Nos. 0.40 125.00 50.
1.4.1.3 Carriage of material L.S. 1.82 2.00 3.
1.4.2.2 Carpenter 1st class day 0.06 738.00 44.
Add 1 % Water charges on "W" 7.
Add GST on "X" (multiplying factor 0.1405) 104.
Add 15% CPOH on "Y" 127.
Add Cess @ 1% on "Z" 9.
Cost of 10 nos 987.
Cost of 1 no 98.
Say 98.
Cost for fixing 1 Stainless Steel handles
TOTAL Nos 1 98.
Cost for providing and fixin 1 fire resistant doors of size 1.2m x 2.1m
Cost for item
description (1.1 +
Therefore,
Cost for providing and fixing 7 fire resistant doors of size 1.2m x 2.1m 38248.47 x 7 267739.
by measuring across the diagonal
of the grid opening
Tilt panels above frame and
drop into place
INSTALLATION PROCESS
.
MEMBER DETAILS
.