Energy audit report, Study Guides, Projects, Research of Energy Efficiency

Report for energy consumption in a facility

Typology: Study Guides, Projects, Research

2018/2019

Uploaded on 03/18/2019

Pradeepakaliraj
Pradeepakaliraj 🇮🇳

3 documents

1 / 13

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
ENERGY AUDIT REPORT
NATIONAL SMALL INDUSTRIES CORPORATION
CHENNAI
11/5/2018
AUDITED BY,
M.MOUNA
K.PRADEEPA
M.SHANMUGAPRIYAA
T.M.SRUTHIKA
pf3
pf4
pf5
pf8
pf9
pfa
pfd

Partial preview of the text

Download Energy audit report and more Study Guides, Projects, Research Energy Efficiency in PDF only on Docsity!

ENERGY AUDIT REPORT

NATIONAL SMALL INDUSTRIES CORPORATION

CHENNAI

AUDITED BY,

M.MOUNA

K.PRADEEPA

M.SHANMUGAPRIYAA

T.M.SRUTHIKA

TABLE OF CONTENTS:

1: INTRODUCTION AND EXECUTIVE SUMMARY

2: BACKGROUND

2.1 AUDIT SCOPE AND LIMITATION

2.2 METHODOLOGY

2.3 SITE INFORMATION

2.4 SINGLE LINE DIAGRAM

3: ENERGY CONSUMPTION

3.1 SPECIFIC ENERGY CONSUMPTION

4: DETAILED BUILDING PLAN (attachment pdf)

5: ENERGY EFFICIENCY IN UTILITY AND PROCESS SYSTEMS

5.1 LIGHTING AND LIGHTING CONTROL

5.2 VENTILATION

6: ENERGY CONSERVATION OPTIONS AND RECOMMENDATIONS

ANNEXURE

A1. LIST OF ENERGY AUDIT WORKSHEETS

A2. ACTUAL FIXTURES AND FAN

A3. REPLACED FIXTURES AND FAN

A4. LIST OF VENDORS

7: CONCLUSION

AFTER ENERGY AUDIT:

ROOMS

AC PC LED LED

TUBE

FAN TABLE

FAN

CAMERA PROJECTOR KIT UPS WIFI BATTERY

CORRIDOR 0 0 0.032 0.032 0.06 0.025 0.18 0 0 0 0 0

CL ROOM 1 1.5 0 0.016 0.03 0 0 0 0 0 0 0

SEM HALL 0 0 0.128 0.27 0 0.06 0.3 0 0 0 0

COM LAB 1.5 3 0 .032 0.06 0 0.06 0 0 0 0 0

CL ROOM 2 3 1.5 0.16 0 0 0 1 0 0 0

EM ROOM 3 0 0.224 0 0.06 0 2 0 0 0

CISCO HALL 3 2.4 0.16 0.025 0 0.3 0 0.6 1 2.

CORRIDOR2 0 0 0.04 0 0 0 0 0 0 0

CADCAM

LAB

C.H.LAB 1.5 0.6 0.024 0 0 0 0 0 0 0

T.H 1 0 0 0.064 0.15 0 0 0.3 0 0 0 0

T.H.2 0 0 0.032 0.12 0 0 0 1 0 0 0

EMBEDDED

LAB

VLSI 1.5 0.3 0.016 0.03 0 0 0 0 0.6 0 0

STAIRS 0 0 0 0 0 0 0 0 0

TOTAL, KW 21 15.6 0.096 0.96 0.87 0.05 0.36 1.2 4 1.2 1 2.4 48.

TOTAL,KWh 105 78 0.672 6.72 6.09 0.35 2.52 6 12 8.4 7 16.8 249.

2: BACKGROUND

The main objective of this walk-through audit is to identify, how energy is

being used in NSIC administration block and help identify practical and cost

effective energy saving measures that will reduce energy use and lowers

operating cost.

2.1 AUDIT SCOPE AND LIMITATION:

This audit report will:

 Evaluate NSIC Administration block’s overall energy performance.

 Highlight number of improvement opportunities.

 Provide an estimation of payback period.

In this walkthrough audit, the following major building-related activities were

investigated:

 Lighting consumption

 Ventilation

2.2 METHODOLOGY

The following activities were performed during and after the Walkthrough

Audit in NSIC:

● Analysis of existing Baseline Energy Consumption(BEC)

● Site inspection and Data collection

● A written report detailing findings, recommendations, approximate costing

and savings with payback times.

2.3 SITE INFORMATION:

The NSIC Administrative block comprises of:

Ground floor First floor

Classroom I Training hall I

Computer lab Computer hardware lab

Seminar hall VLSI lab

Cisco metering hall Embedded systems lab

Electronics maintenance lab Training Hall II

3: ENERGY CONSUMPTION

The major energy consumptions at this facility are:

 Ventilation and Air Conditioning (VAC)

 Personal computer

 Lighting

3.1 SPECIFIC ENERGY CONSUMPTION:

4: DETAILED BUILDING PLAN:

Refer attachment pdf

5: ENERGY EFFICIENCY IN UTILITY AND PROCESS SYSTEMS:

5.1 LIGHTING AND LIGHTING CONTROL

 Class Rooms- Change Lights to LED

5.2 VENTILATION AND AIR CONDITIONING SYSTEMS:

 Class Rooms- Change Fans to Energy Efficient Fans

0

1

2

INVESTMENT  Replacing tube lights with LED bulbs and lights.

 Replacing Fans with Energy Efficient Fans

NOTES:

 If the functioning ACs are to be changed, it can be replaced with BEE

certified 5 star rated ACs.

 Installation of Occupancy sensors helps in the reduction of lighting

hours.

ANNEXURE:

A1. LIST OF ENERGY AUDIT WORKSHEETS:

ROOMS AC PC CFL TUBE FAN TABLE

FAN

CAMERA PROJECTOR KIT UPS WIFI BATTERY

CORRIDOR 0 0 0.104 0.36 0.225 0. 025 0.18 0 0 0 0 0

CL ROOM 1 1.5 0 0 0.12 0.075 0 0 0 0 0 0 0

SEM HALL 0 0 0 0.9 0.675 0 0.06 0.3 0 0 0 0

COM LAB 1.5 3 0 0.24 0.15 0 0.06 0 0 0 0 0

CL ROOM 2 3 1.5 0 0.6 0 0 0 0 1 0 0 0

EM ROOM 3 0 0 0.84 0 0 0.06 0 2 0 0 0

CISCO HALL 3 2.4 0 0.6 0 0.025 0 0.3 0 0.6 1 2.

CORRIDOR2 0 0 0.13 0.06 0 0 0 0 0 0 0 0

CADCAM

LAB

C.H.LAB 1.5 0.6 0.078 0.06 0 0 0 0 0 0 0 0

T.H 1 0 0 0 0.42 0.375 0 0 0.3 0 0 0 0

T.H.2 0 0 0 0.36 0.3 0 0 0 1 0 0 0

EMBEDDED

LAB

VLSI 1.5 0.3 0 0.12 0.075 0 0 0 0 0.6 0 0

STAIRS 0 0 0 0.06 0 0 0 0 0 0 0 0

TOTAL, Kw 21 15.6 0.312 5.58 2.25 0.05 0.36 1.2 4 1.2 1 2.4 54. TOTAL,KWh 105 78 2.184 39.06 15.75 0.35 2.52 6 12 8.4 7 16.8 293.

A2: ACTUAL FIXTURES AND FAN:

CONCLUSION:

 The Payback period for the Energy Audit programmed will be 8 months.

 It is believed that energy audit is one of the most comprehensive methods in

achieving energy savings, thus reducing excessive energy consumption.