Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Practice exam questions and answers on fire safety, focusing on hot work. Topics include pre-hot work checks, extinguisher usage, and safety procedures for flammable gases like CNG and LPG. Questions cover fire prevention, safety protocols, and responses to fire incidents. Designed for certification exam preparation, it ensures knowledge of safety practices and regulations. A valuable resource for industries performing hot work, reinforcing safety and preparedness to prevent fires and minimize risks. It also touches on fire guard roles and the importance of fire watches.
Typology: Exams
1 / 6
This page cannot be seen from the preview
Don't miss anything!
ANS Once per day
ANS allow the fire to burn itself out and call 911
limited in size and can be readily extinguished
feet from the top of the extinguisher and the bottom must not be less than inches from the floor. ANS 5, 4
30 feet
years. ANS 5
. ANS prohibited
equipment using LPG or CNG is prohibited. However, nonmetallic hose may be allowed at. ANS construction sites
feet. ANS physical damage, 30
close control valves, close gas container
turns. ANS 1 ½
after completion of torch operations; the second inspection hour after completion of torch operations. ANS 30, 1
minutes after completion of torch operations ANS 30
completion of torch operations ANS 1
should be maintained on the premises for... ANS 48 hours
heating with a torch and melting asphalt back coating instead of mopping hot asphalt for adhesion.
construction
to distant combustibles must be... ANS shielded, or shut down, or both
operation areas must be notified in writing by the citywide permit holder at least days before the hot work is to be started. ANS 2