Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

GCSS Exam With Complete Solution Latest Update 2023 Assured A+, Exams of Information Technology Management

GCSS Exam With Complete Solution Latest Update 2023 Assured A+

Typology: Exams

2022/2023

Available from 12/01/2023

arnezieme9
arnezieme9 🇺🇸

5

(1)

1.9K documents

1 / 13

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
GCSS Exam
With
Complete
Solution Latest
Update 2023
Assured A+
1. When creating an OBSL
work order, the 4 low priority
P a g e 1 | 13
pf3
pf4
pf5
pf8
pf9
pfa
pfd

Partial preview of the text

Download GCSS Exam With Complete Solution Latest Update 2023 Assured A+ and more Exams Information Technology Management in PDF only on Docsity!

GCSS Exam

With

Complete

Solution Latest

Update 2023

Assured A+

  1. When creating an OBSL work order, the 4 low priority

list item is selected. - Correct answer b. FALSE

  1. When a change is made to the OBSL BOM, a new XML file is received into GCSS-Army via the ______, which results in an update to the existing OBSL BOM. - Correct answer d. SAP Business Workplace
  1. The intent of the OBSL work order is to be able to compare the OBSL material requirement quantities with the ______. - Correct answer a. On-hand material quantities
  2. The nomenclature for the OBSL work order description is the OBSL, followed by the watercraft vessel ______. - Correct answer c. Advanced

Shipment Notification (ASN) Number

  1. True or False? The OBSL work order is not to be released. - Correct answer a. TRUE
  2. The OBSL work order that is created for a watercraft mission is used for material replenishment. - Correct answer b. FALSE

safety stock requirements. - Correct answer a. TRUE

  1. The ______ transaction is used to create the OBSL/On-Hand Material Quantities spreadsheet. - Correct answer d. Equipment Status Report (Z_EQUST)
  2. The ______ transaction is used to display the open watercraft OBSL work order.
  • Correct answer a. Equipment Situation Report (/ISDFPS/DISP_EQU_SIT)
  1. The ______ transaction is used to create the watercraft OBSL work order.
  • Correct answer b. Create Order (IW31)
  1. Operators are entered into a ground equipment dispatch where as ______
  1. True or False? The equipment usage reading is applied to the end item equipment and to the engine and transmission in a ground equipment dispatch and to only the end item in a watercraft equipment dispatch. - Correct answer a. TRUE
  2. True or False? Equipment usage readings

are tracked for the crew members in a watercraft equipment dispatch. - Correct answer b. FALSE

  1. The ______ transaction is used to display the Functional Location Structure for a piece of watercraft equipment. - Correct answer a. Equipment Situation Report (/ISDFPS/DISP_EQU_SIT)

of equipment that requires usage to be tracked and that is installed in a watercraft Functional Location Structure. - Correct answer a. TRUE