Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
IMSA Traffic Signal Technician Level I | Level 1 End of Chapter | Questions and Verified Answers | Grade A | 100% Correct (Latest 2025 / 2026 Update)
Typology: Assignments
1 / 21
This page cannot be seen from the preview
Don't miss anything!
What is the primary function of the IMSA?
Safety education
IMSA stands for:
International Municipal Signal Association
Which of the following is NOT an IMSA certification?
Y: Traffic Signal Level II Design/Engineer Technician Y: Traffic Signal Level II Field Technician Y: Traffic Signal Level II Bench Technician N: Traffic Signal Level III Bridge Design Technician
Which of the following are potential safety hazards?
Overhead and underground power Gas Aerial lift equipment
What are the sections of a ramp meter signal?
Circular red, circular green
PPE stands for:
Personal Protective Equipment
Which of the follow is an example of adequate fall protection during the operation of aerial lift equipment?
Full body harness
The following phases are typically assigned to the major street through movements:
2 and 6
The green interval is made up which three components?
Minimum green, passage time, maximum green
What are the three types of recall features of a traffic signal controller?
Minimum, maximum, pedestrian (+soft)
In a coordination plan, what is the number of seconds given to each phase at the intersection?
Split (g,y,r)
Which of the following traffic signal coordination method is typically least expensive?
Time-based coordination
Which of the following is a definition of cycle length:
The elapsed time between the start of a specific display until that display comes up again
Which of the following is a characteristic of sequential phases:
They cannot occur at the same time
Which of the following is a definition for initial green time:
Minimum time that the green indication must be displayed
The only point in the cycle of a coordinated traffic signal controller where the major-street phase is allowed to end is called:
Yield point
The purpose for "louvers" is to:
Make signal visible from a specific lane
Which of the following types of conduit are used for traffic signals?
Rigid Steel Conduit High-Density Polyethylene (HDPE) PVC Schedule 40
Traffic signal supports are NOT used to display the following items:
Y: Guide signs N: Advertisements Y: Regulatory signs Y: Overhead street sign names
Which of the following is a disadvantage of mast arms:
Large foundations
Methods of signal supports include all of these except:
N: Arched supports Y: Truss supports Y: Monotube supports Y: Pedestal supports
Components of the optical unit for an incandescent lamp include all of the following except:
Y: Lamp socket N: Shade Y: Lens Y: Reflector
For pedestrian signals controlling crosswalks less than 100 feet, what is the required height of the symbols themselves:
At least 6 inches
A 6' X 60' loop typically has how many turns of wire:
Two
The primary function of the CMU is:
Prevent conflicting signal indications
What is NOT part of the overhead power service:
N: Pull box or boxes Y: Power supply wires Y: Conduit riser with weatherhead Y: Meter housing
Typical back-up battery systems provide battery power in case of an outage to a signal for:
2 to 6 hours
A major distinguishing feature between NEMA TS-1 and TS-2 controllers is:
Data bus
The Advanced Transportation Controller was developed to provide:
Open architecture hardware and software platform
Which of the following type of controller assemblies, without adapters, can accept multiple software platforms and be utilized in all types of cabinets;
wHAT IS ANOTHER TERM FOR LOAD SWITCHES USED IN 170/2070 CONTROLLERS?
Switch packs
The first type of test performed on a controller cabinet assembly is:
bench test
Continuity is a type of test for:
Traffic signal conductors
The most labor intensive type of vehicle detection installed is:
Inductive loop detection
Which of the following 'start-up' items need to be completed by the contractor prior to the physical construction of the traffic signal:
Utilities notification and coordination Public awareness as required by the agency Approval of traffic control plan
Which of the following equipment is NOT typically seen at the construction site of a traffic signal:
Y: Horizontal boring machine for conduit under pavement Y: Aerial lift truck for above ground work N: Grader to create level intersections Y: Trencher for cable installation
"Free-swinging" signal heads are located on which of the following support systems:
Span wires
Traffic signals can be installed:
After justification is determined through a warrant study
A traffic signal warrant study can determine the need of installation through all of the following except:
Y: Traffic volumes that show insufficient gaps exist on the major street to allow minor street traffic to enter or cross an intersection N: Road users at an intersection submitting a sufficient number of requests for installation of a signal based on local requirements
8 hours
Which of the following does a traffic signal designer have to take into consideration when designing a signal?
Signal phasing Utilities Cost
Which of the following are considerations that should be taken into account when designing a new traffic signal?
Types of preemption required Coordination with nearby traffic signals Traffic characteristics at the location
Multimeters are used to check:
Resistance Voltage Current
What device is used to measure the resistance or breakdown strength of conductor insulation:
Megohmmeter
What device does a technician use to troubleshoot existing loops already installed in the field:
Loop analyzer
Resistance as expressed by Ohm's law is:
Ohm's law is useful in the design and troubleshooting of circuits and describes the mathemat ical relationship of the following:
Voltage Current Resistance
Y: Effects caused by the flow of electricity Y: Weather related issues Y: Ventilation N: Lubrication
A key component of documentation is:
Which of the following is a characteristic of a good field report:
Concise Describes actions taken Clearly written
Which of the following best describes traffic signal maintenance:
The repair or upkeep of the existing equipment and operations
Checking for inconsistent indications, local construction activities, and if the signal is in flashing mode would be an example of which of the four steps in the troubleshooting procedure:
Observe
Crashes occur at signalized intersections due to:
Driver error Vehicle equipment malfunction Roadway or traffic control device defects
The best way to minimize the possibility of being named in a lawsuit is by:
Keeping good records Strict adherence to established standards Providing comprehensive maintenance procedures
Negligence is defined as: