Information Systems Project Management, Exams of Business Administration

Various topics related to information systems project management, including pre-development questions, feasibility studies, advantages of in-house development and buying, the software development life cycle (sdlc), and key project management functions such as scope, time, and cost management. It also discusses project roles like the project sponsor and project manager, as well as development models like the waterfall model and integrated development environments (ides). A comprehensive overview of the fundamental concepts and practices in information systems project management, making it a valuable resource for students and professionals in the field.

Typology: Exams

2023/2024

Available from 08/26/2024

Expressguide
Expressguide 🇺🇸

2K documents

1 / 3

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
BUSI 2400 W 9 With Complete Solutions Latest
Update 2024
Which of the following is the first "pre-development" question that should be
asked before an organization decides to start an IS project? - ANS what are we
planning and why
A(n) _______________________ is a detailed investigation and analysis of a
proposed development project that is undertaken to determine whether it is
technically and economically possible to successfully build or acquire a proposed
system. - ANS feasibility studyThat the "firm retains complete control of the
project" is typically an advantage in ______________________.
Generally faster and less costly than building an entire system from scratch" is
typically an advantage in _______________________ a building. - ANS buying
That the "firm retains complete control of the project" is typically an advantage in
______________________. - ANS in house development
In which part of the SDLC must an organization "foster an environment that
promotes ideas that can improve its bottom line"? - ANS concept
In which part of the SDLC is the focus "on understanding the problem to be solved
or the opportunity to be addressed and planning the project"? - ANS inception
pf3

Partial preview of the text

Download Information Systems Project Management and more Exams Business Administration in PDF only on Docsity!

BUSI 2400 W 9 With Complete Solutions Latest

Update 2024

Which of the following is the first "pre-development" question that should be asked before an organization decides to start an IS project? - ANS what are we planning and why A(n) _______________________ is a detailed investigation and analysis of a proposed development project that is undertaken to determine whether it is technically and economically possible to successfully build or acquire a proposed system. - ANS feasibility studyThat the "firm retains complete control of the project" is typically an advantage in ______________________. Generally faster and less costly than building an entire system from scratch" is typically an advantage in _______________________ a building. - ANS buying That the "firm retains complete control of the project" is typically an advantage in ______________________. - ANS in house development In which part of the SDLC must an organization "foster an environment that promotes ideas that can improve its bottom line"? - ANS concept In which part of the SDLC is the focus "on understanding the problem to be solved or the opportunity to be addressed and planning the project"? - ANS inception

In which part of the SDLC does the "project team finalize the requirements for the system and the project plan, and design the system architecture"? - ANS ellaboration "Identifying and managing all the tasks required to complete a project" occurs in which part of the following four core functions that lead to specific project objectives? - ANS scope management "Estimating the duration of the project, developing an acceptable schedule, and managing the project to ensure timely completion" occurs in which part of the following four core functions that lead to specific project objectives? - ANS time management "Preparing a budget and managing the costs of the project to stay within budget" occurs in which part of the following four core functions that lead to specific project objectives? - ANS cost management Which individual ensures that the project goals correspond to the organization's business objectives and is often a senior executive or someone in a position of authority? - ANS project sponsor Which individual role demands knowledge of methods and techniques to ensure delivery of the project on time and on budget, and the ability to communicate project goals and requirements to the project team and coordinate the workflows of everyone on the project team? - ANS project manager