Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Kentucky Boiler Exam KRS 236: Questions and Answers for Boiler Inspectors, Exams of Nursing

A comprehensive collection of questions and answers related to the kentucky boiler exam (krs 236). It covers various aspects of boiler inspection, including regulations, definitions, procedures, and requirements for inspectors. A valuable resource for individuals preparing for the kentucky boiler inspector exam.

Typology: Exams

2024/2025

Available from 03/07/2025

DOCSITY_GRADES
DOCSITY_GRADES 🇺🇸

4

(1)

917 documents

1 / 37

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Page 1 of 37
1
KENTUCKY BOILER EXAM KRS 236 ACTUAL EXAM AND
PRACTICE EXAM TESTBANK ALL QUESTIONS AND
CORRECT ANSWERS 2024-2025
How long must in the industry must an inspector have established before they are able to take
the practical inspector exam? - ANSWER-5 Years
What are inspectors working for insurance companies called? - ANSWER-"Special Inspectors"
Does the state pay for special inspectors? - ANSWER-No
After inspection, when is the inspection report due to the state? - ANSWER-30 days
How often are boiler inspection exams given? - ANSWER-March / June / September / December
*First Wednesday & Thursday of the month
What requirements must owner / operator inspectors have before reports will be accepted by
the state? - ANSWER-1. Passed Inspector Examination
2. Holds a commission as an inspector of boilers and pressure vessels from NBBPVI
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25

Partial preview of the text

Download Kentucky Boiler Exam KRS 236: Questions and Answers for Boiler Inspectors and more Exams Nursing in PDF only on Docsity!

KENTUCKY BOILER EXAM KRS 236 ACTUAL EXAM AND

PRACTICE EXAM TESTBANK ALL QUESTIONS AND

CORRECT ANSWERS 2024- 2025

How long must in the industry must an inspector have established before they are able to take the practical inspector exam? - ANSWER-5 Years What are inspectors working for insurance companies called? - ANSWER-"Special Inspectors" Does the state pay for special inspectors? - ANSWER-No After inspection, when is the inspection report due to the state? - ANSWER-30 days How often are boiler inspection exams given? - ANSWER-March / June / September / December *First Wednesday & Thursday of the month What requirements must owner / operator inspectors have before reports will be accepted by the state? - ANSWER- 1. Passed Inspector Examination

  1. Holds a commission as an inspector of boilers and pressure vessels from NBBPVI

T / F Owner / Operator inspectors need not to submit inspection reports to the "Department" - ANSWER-T If an owner / operator inspector changes, when is notification required to the Department? - ANSWER-30 Days How long does the department have to issue or deny a certification? - ANSWER-45 days When must an applicant submit a completed renewal application? - ANSWER-No later than 60 days prior to license expiration. Boiler - ANSWER-Closed vessel in which water or other liquid is heated Power Boiler - ANSWER-Steam or vapor is generated <15psig High Pressure / Temperature Water Boiler - ANSWER-Pressures exceed 160 psig or Temp above 250 F Heating Boiler - ANSWER-Steam or vapor boiler operating under 15 psig not to exceed 250 F Portable Boiler - ANSWER-Temporary Location Usage: Construction

MAWP - ANSWER-Maximum Allowable Working Pressure What section covers ASME Piping Codes - ANSWER-ASME B Is piping connected to the boiler an inspection item? - ANSWER-Yes What is the fee to renew a license? - ANSWER-$ 500 What is the initial fee for an owner / operator piping inspector? - ANSWER-$ If the owner / operator is denied a certification, what is the refund amount? - ANSWER-$ How long is an owner facility license good for? - ANSWER-2 Years How long must records be maintained for owner operator facilities? - ANSWER-5 Years Can the owner operator piping inspector do inspections before certification? - ANSWER-No

Where can the application for owner's piping inspector license be found? - ANSWER-KRS Online What is the fee to become a piping inspector? - ANSWER-$ What is the min / max prorate for a piping inspector? - ANSWER-No less than 13 months, no more than 36 months. What is the renewal fee for piping inspector certification? - ANSWER-$ How long is an owner / operator inspector certification good for? - ANSWER-2 years Independent Inspection Agency Fee for certification? - ANSWER-$ What is the refund for a denied Independent Inspection Agency Certification? - ANSWER-$ How long is the effective period for an independent inspection agency? - ANSWER-2 Years How long after a denial may an inspector reapply? - ANSWER-90 Days

What is the fee per vessel for the department's inspection of new construction? - ANSWER-$ How long are Power Boiler inspection certificates good for? - ANSWER-14 Months How long are Vapor / Steam Boiler Inspection Certificates effective? - ANSWER-26 months If a vessel or piping system is deemed "condemned," who can be the relief so that operations can continue? - ANSWER-The same designee that condemned the vessel or piping system must authorize a continue to work. Where must the certificate of operation be posted? - ANSWER-Room containing Boiler *Portables must be in the toolbox What two things are designated on a certificate to operate from the Chief Boiler Inspector? - ANSWER-1. Inspection Date

  1. MAWP Where are funds held collected from inspections? - ANSWER-Trust and agency fund

How long do you have to file a grievance with the department for an administrative hearing? - ANSWER-15 days Where is the petition filed for a grievance with the Department? - ANSWER-Franklin Circuit Court Do you need a contractor's license to erect boilers? - ANSWER-Yes How often do contractor's need to renew their licenses' for construction? - ANSWER-Annually * First of the month following expiration Upon suspension or revocation of a license, how long does the Department have to provide notice? - ANSWER-Written notice must be provided within 10 Days What is the cost for a replacement license? - ANSWER-$ What do permit fees for installation / erection / repair of boilers or pressure vessels include? - ANSWER-Initial / Final Inspection During an emergency, how long do owner / operators have until permits must be submitted to the Department? - ANSWER-30 Days to file

High Pressure / High Temperature Boiler - ANSWER-KRS 236.010 160 psig w/ Temperatures above 250 F Hot water heating boiler - ANSWER-Hot water is circulated for heating purposes Hot Water Storage Tank - ANSWER-Pressure Vesse, unfired, but subject to sam epressures as a companion hot water supply boiler (External Use) Hot Water Supply Boiler - ANSWER-filled with water that furnishes hot water to be used externally. >210F >160 psig Hydrostatic Test - ANSWER-Pressure test with water to test for tightness or mechanical integrity Jacketed Kettle - ANSWER-Pressure vessel w/ inner and outer walls that is subject to water or steam pressure Lined potable water Boiler - ANSWER-Water boiler w/ a corrosion resistant lining used to supply potable water

National Board of Boiler and Vessel Inspectors - ANSWER-NB Who is the Chairman of the Department? - ANSWER-Chief Boiler Inspector Who appoints the members of the board? - ANSWER-Governor How many votes shall the board have to pass policy? - ANSWER- 5 Do members of the board take a salary? - ANSWER-No What Code shall a boiler or pressure vessel computed to if it does not have an ASME code Symbol (Special Boiler) - ANSWER-API 579 / ASME FFS-1 (Fit For Seravice) What information must be on the tag of of the certified boiler? - ANSWER-1. Registration Number

  1. Manufacturer's Name If hydrostatic testing is not a possibility, what kind of testing is required? - ANSWER-NDT Non Destructive Testing

How much above the MAWP shall supplemental pressure devices control? - ANSWER-21% What is the minimu relieving capacity of the safety valve or safety relief valve? - ANSWER-Equal to or exceed the maximum output of the boiler What is the only exception for fired boilers to ASME Section 1? - ANSWER-Manually fired boilers built before the publication of the 1991 Addenda to ASME Section 1. How many gauge cocks must be located within visible range of the water glass? - ANSWER- 3 What is the minimum distance boilers must maintain between existing or new buildings? - ANSWER-2' What is the distance manholes must have between manholes or structures? - ANSWER-5' Can cylindrical vessels be used in the vertical position? - ANSWER-Yes *Must be concave to facilitate drainage What type of switches are required for shutdown of boilers in case of emergency? - ANSWER- Manual Switches

What happens if a shutdown switch is activated? - ANSWER-It must be manually reset Are existing boilers required to be connected to new construction safety / emergency shutdown switches? - ANSWER-Yes Are there any exclusions of power boiler or heating boilers in regard to distance of construction or manholes? - ANSWER-Yes; Construction prior to July 15, 2015 How often are pressure vessels exceeding 200 psi inspected? - ANSWER-5 Years How often are hot water storage tanks, sterilizers, and autoclaves inspected? - ANSWER-4 Years How often are pressure vessels for human occupancy and hyperbaric chambers inspected? - ANSWER-2 Years How often are Jacketed Kettles inspected? - ANSWER-2 Years How often are deareators inspected? - ANSWER-10 Years

What is the fee for a request from a boiler manufacturer / installer? - ANSWER-$450 for one- half day or 4 hours or less $600 for 1 day $600 For any part of a weekend $40 per hour for overtime in excess of 8 hours in any given day What is the fee for initial ASME Certificates? - ANSWER-$ What is the renewal fee for ASME Certificates? - ANSWER-$ What is the cost for the initial inspections and renewals for NBR or V-R certificate? - ANSWER- $ How much is a contractor license? - ANSWER-$ How much is a renewal fee for a contractor license? - ANSWER-$

KENTUCKY BOILER EXAM

When shall fees for permits be paid? Prior to installation What is the permit fee for pressure vessels that cost $2,000 or less? $ Permit fee for pressure vessels that cost $2,001 to $10,000? $ Permit fee for pressure vessels that cost $10,001 to $25,000? $ Permit fee for pressure vessels that cost $25,001 to $50,000? $ Permit fee for $50,001 to $75,000? $ Permit fee for $75,001 to $100,00? $ Permit fee for $100,001 to $150,00? $ Permit fee for $150,001 to $200,000? $

$70 for a transferred permit What is the fee for annual reinspection of a power boiler with 100 sq ft or less of heating surface? $ What is the fee for annual reinspection of a power boiler with 100 to 1,000 sq ft of heating surface? $ What is the fee for annual reinspection of a power boiler with 1,000 to 4,000 sq ft of heating surface? $ Fee for annual reinspection of power boiler with 4,000 to 10,000 sq ft of heating surface? $ Fee for annual reinspection of power boiler with over 10,000 sq ft of heating surface? $ Fee for external inspection of power boiler with 100 or less sq ft of heating surface? $ Fee for external inspection of power boiler with 101 or more sq ft of heating surface? $ Fees for biennial reinspection of boilers with manway where internal inspection required? $

Fee for biennial reinspection of other power boilers? $ Fee for biennial reispection of hot water supply boilers? $ Fee for biennial reinspection of miniature boilers? $ Fee for initial inspection of existing pressure vessel that has been in service for at least 5 years? $ Fee for inspection requested outside of normal business hours for 1/2 day of 4 hours or less? $ Fee for inspection requested outside of normal business hours for 4 to 8 hours? $ Fee for inspection requested outside of normal business hours for any part of Saturday, Sunday, or stat holiday? $ Fee for inspection requested outside of business hours for overtime on any day $40/hr over 8 hours in any day Is manufacturer, installer, or engineer charged mileage?