Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Michigan Builders License 2025 Exam with Complete Solutions | 100% Verified, Exams of Building and Prefabrication

Michigan Builders License 2025 Exam with Complete Solutions | 100% Verified

Typology: Exams

2024/2025

Available from 04/21/2025

brian-muchemi
brian-muchemi 🇺🇸

19 documents

1 / 46

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Michigan Builders License 2025
Exam with Complete Solutions | 100%
Verified
Elevations above sea level are part of the...
✔️✔️
site plan
What shows the proposed and existing elevations and helps you identify if you need to cut or
fill?
✔️✔️
Leader lines
Part of the site plan that determines the lot line on large acreage properties are ✔️✔️metes and bounds
If there is a basement, the finished floor must
be
above
the
flood
stage.
✔️✔️
1
foot
Every
city
that
has
a
river,
stream
or
lake
in
it
will
have
a...
✔️✔️
FEMA
flood
map
The
formula
for
board
feet
when
calculating
in
FEET
is...
✔️✔️
(W
x
T
x
L)/12
The
formula
for
board
feet
when
calculating
in
INCHES
is...
✔️✔️
(W
x
T
x
L)/144
OC Spacing Length of wall in Feet x 12 inches/16+1 is the formula for calculating... ✔️✔️Stud Count
When
estimating
for
drywall
for
a
room,
be
sure
to...
✔️✔️
Figure
for
the
walls
AND
ceiling
When calculating ground slope, what will be the difference in elevation from the base of the
house compared to 50 ft from the house with an 8% slope?
✔️✔️
4
feet
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e

Partial preview of the text

Download Michigan Builders License 2025 Exam with Complete Solutions | 100% Verified and more Exams Building and Prefabrication in PDF only on Docsity!

Michigan Builders License 2025

Exam with Complete Solutions | 100%

Verified

Elevations above sea level are part of the... ✔️ ✔️ site plan

What shows the proposed and existing elevations and helps you identify if you need to cut or fill? ✔️ ✔️ Leader lines

Part of the site plan that determines the lot line on large acreage properties are ✔️ ✔️ metes and bounds

If there is a basement, the finished floor must be above the flood stage. ✔️ ✔️ 1 foot

Every city that has a river, stream or lake in it will have a... ✔️ ✔️ FEMA flood map

The formula for board feet when calculating in FEET is... ✔️ ✔️ (W x T x L)/

The formula for board feet when calculating in INCHES is... ✔️ ✔️ (W x T x L)/

OC Spacing Length of wall in Feet x 12 inches/16+1 is the formula for calculating... ✔️ ✔️ Stud Count

When estimating for drywall for a room, be sure to... ✔️ ✔️ Figure for the walls AND ceiling

When calculating ground slope, what will be the difference in elevation from the base of the house compared to 50 ft from the house with an 8% slope? ✔️ ✔️ 4 feet

The formula for estimating concrete into cubic yards is... ✔️ ✔️ (L x W x T)/27(L x W)/

A driveway 60 feet long by 20 feet wide and 6 inches thick will need how many cubic yards of concrete? ✔️ ✔️ 23 cubic yards

When measuring for concrete... ✔️ ✔️ Round your calculations to the next full yard

When measuring concrete for basement walls, be sure... ✔️ ✔️ Not to calculate the corners twice

Change inches to decimal points by dividing the inches by... ✔️ ✔️ 12

Shingles and siding are sold by the square, a square equals... ✔️ ✔️ 100 square feet

To determine the unknown length of a triangle, use the formula... ✔️ ✔️ a2 + b2 = c

To estimate gable siding, use the formula... ✔️ ✔️ 1/2 base x height

The greater the pitch, the the rafter has to be. ✔️ ✔️ Longer

What formula can be used to determine length of a rafter if the slope and run are known? ✔️ ✔️ a2 + b2 = c

These are called the books of ORIGINAL entry and include as much information as possible recorded with each transaction ✔️ ✔️ Journals

These are called the books of FINAL entry and include a summary of information from the journals ✔️ ✔️ general ledger

What is a clay-type soil that has an unconfined strength of less than 1.0 ton per square foot? ✔️ ✔️ soft clay soil

According to MIOSHA Injury and Illness Reporting, when are you required to report an injury or illness? ✔️ ✔️ When you have more than 10 employees or when specifically requested by MIOSHA

Heavy-duty scaffold means a scaffold that is designed and constructed to carry a working load of not more than pounds per square foot. ✔️ ✔️ 75

A scaffold and its components shall be capable of supporting, without failure, not less than times the maximum intended load. ✔️ ✔️ 4

A guardrail shall be installed on any open side or end of a scaffold work platform that is or more feet above the floor or ground. ✔️ ✔️ 10

Pump jack brackets, braces and accessories shall be fabricated from metal plates and angles. Each bracket shall have positive gripping mechanisms to prevent any failure or slippage. ✔️ ✔️ 2

A ladder jack scaffold shall be used only for light duty on type 1 manufactured ladders at heights not more than feet from the ground or floor level. ✔️ ✔️ 20

Personal fall arrest systems, when stopping a fall, shall: ✔️ ✔️ Limit maximum arresting force on an employee to 1800LBS when used with a body harness Be rigged such that an employee can neither free fall more than 6 feet, nor contact any lower level

When mechanical equipment is being used, the warning line shall erected not less than feet from the roof edge which is parallel to the direction of mechanical equipment operation, and

not less than feet from the roof edge which is perpendicular to the direction of mechanical equipment operation. ✔️ ✔️ 6 and 10

Falling object protection shall comply with the following provisions ✔️ ✔️ toeboards, when used as falling object protection, shall be erected along the edge of the overhead walking/working surface for a distance sufficient to protect employees toeboards shall be a minimum of 3 1/2 inches in vertical height from their top edge to the level of the walking/working surfacee toeboards shall be capable of withstanding, without failure, a force of at least 50 pounds applied to any downward or outward direction at any point along the toeboard

A ladder shall be provided to all personnel points of access if there is a break in elevation of inches or more and if a ramp, runway, sloped embankment, stairway or personnel hoist is not provided ✔️ ✔️ 19

A job-built ladder shall not be more than feet in length. ✔️ ✔️ 24

What is a device that makes instantaneous forced-entry fastenings into construction materials through the use of a fastener and an explosive load? ✔️ ✔️ Powder-actuated tool

What is a narrow strip of wood or other soft material which has a notch or sharp point on one end and which is used to push material through the point of operation of a cutting tool? ✔️ ✔️ push stick

Air pressure at the discharge end of a portable air gun or hose used for cleaning shall not exceed pounds per square inch (psi) ✔️ ✔️ 30

What type of a fire is fueled by wood, cloth, paper, rubber and plastics? ✔️ ✔️ Class A fire

Who shall administer and enforce the provisions of the Michigan Occupational Safety and Health Act? ✔️ ✔️ The Department of Labor (LARA)

An employer wo willfully or repeatedly violates the Michigan Occupational Safety and Health Act, may be assessed a civil penalty of not more than $ for each violation. ✔️ ✔️ $124,709.

An employer shall develop, maintain, and coordinate with employees an accident prevention program, a copy of which shall be available at the worksite and shall include... ✔️ ✔️ Instructions to each employee who is required to handle or use poisons, toxic materials, caustics, and other harmful substances Instructions to each employee if known harmful plants, reptiles, animals, or insects are present Inspections of the construction site, tools, materials, and equipment to assure that unsafe conditions which could create a hazard are eliminated

Splices in rebar should not be less than overlaps ✔️ ✔️ 12 inch

In concrete, saw cut control joints should be made within hours of placement ✔️ ✔️ 4 to 12 hours

The temperature of concrete should be maintained at degrees for 5 days in cold weather conditions. ✔️ ✔️ 50

Space trusses to within + or - ✔️ ✔️ 1/4 inch

Lateral bracing (long 2x4 12 footers) are supposed to be located in ✔️ ✔️ the upper 1/3 of the truss area

An example of prestressed concrete is ✔️ ✔️ double T as used in parking garages

Of the 5 types of cement, which is the most commonly used? ✔️ ✔️ type 1 for general use

In coarse aggregate such as pea stone and gravel that ranges in size due to required specifications, what is generally the maximum size? ✔️ ✔️ 1 1/2 inches or less

Ready mixed concrete should be totally discharged from the truck within hours of being mixed ✔️ ✔️ 1 1/2 hours

This type of footing is used over soil which has poor load bearing capacity and will generally cover the entire foot print of the structure. ✔️ ✔️ a mat footing

Approximately how much does one cubic foot of concrete weigh? ✔️ ✔️ 150lbs

The plans/code will tell what measurement slump should be, but in residential work it is generally between and inches. ✔️ ✔️ 4 and 6

When the forms are not vibrated when pouring concrete, the result will be... ✔️ ✔️ a bugout or honeycombing (air voids in the concrete)

What is a darby? ✔️ ✔️ a tool that consists of two handles on a flat plate with slightly lipped edges, similar to a float, except larger

For a wall that is 40 feet long and 10 feet high, how many block do you need in the first course only? ✔️ ✔️ 30 blocks

Which type of mortar has high compression strength, is very good for below grade use, foundations, sewers, retention walls and maintains strength in severe frost, wind, and soil pressure? ✔️ ✔️ type M

How do you establish trust with a client? ✔️ ✔️ By doing what you say you will do

How do you establish trust with your employees? ✔️ ✔️ Ask for input Pay on time Value the feedback

What are the resources you have to promote your business? ✔️ ✔️ Time and Money

How do you take time to promote your business? ✔️ ✔️ Attend community events Give out items with the company name Join associations

In what ways can you monitor previous clients? ✔️ ✔️ Call backs Promotions Mailers

What type of insurance provides added risk protection to an employer who has an employee injured or killed in a related construction accident? This is over and above the workers compensation insurance. ✔️ ✔️ Employers liability insurance

Who has the obligation to ask for and receive copies of all required insurance policies from the subcontractors insurance provider? ✔️ ✔️ The general contractor

What are key ideas to developing a marketing plan essential for a companies growth? ✔️ ✔️ Determine your personal strengths and weaknesses and those of your business Provide a method of establishing trust in the company for both clients and employees Provide a portion of resources to promote your plan

How can you promote the name of your company with the public? ✔️ ✔️ Jobsite signs Vehicle signage

Brochures and mailers

What type of bond guarantees that the contractor will complete the contracted project for the estimate sum? This bond is usually for 100% of the contract sum. Should the contractor default then the bonding company will provide for completion of the project. ✔️ ✔️ Performance bond

Who cannot be covered under a workers compensation policy? ✔️ ✔️ A sole proprietor that operates as an independent contractor A sole proprietor with no employees

What should you be sure a subcontractor has before hiring them? ✔️ ✔️ Workers compensation exclusion form Workers compensation policy

Before hiring a subcontractor that has a workers compensation exclusion form, what additional form should you have them fill out to reduce your liability? ✔️ ✔️ Subcontractor Release and Waiver of Liability Form

Workers Compensation related to a death shall include % of the after tax weekly wage of the employee to be paid to dependents who were wholly dependent upon the employees earnings. Such payment shall continue for weeks from date of death. ✔️ ✔️ 80%/500weeks

Which type of insurance protects the construction project and materials from external forces and has endorsements that can be added to include protection against fire, wind, storms, vandalism and acts of God. ✔️ ✔️ All risk builders insurance

According to Silica Standards, if using a hand held power saw indoors for any amount of time, what safety precautions must be taken? ✔️ ✔️ Required respiratory protection must be work at a minimum of APF 10

What type of common household products could possibly contain asbestos? ✔️ ✔️ Hairdryers Stove top pads Fire proof glass

Houses built between what years may have asbestos as insulation? ✔️ ✔️ 1930 and 1950

What is colorless, odorless, radioactive gas that is caused naturally in the soil but can seep out? ✔️ ✔️ Radon

The EPA has set a "Take Action Level" for radon at: ✔️ ✔️ 4 PCI/L

Radon is the second leading cause of. There are 21,000 related deaths in the U.S. each year. ✔️ ✔️ lung cancer

Up until the , asbestos was commonly used in many building materials. ✔️ ✔️ 1980's

To protect yourself from asbestos during renovations or demolition, what is the most important thing you can do? ✔️ ✔️ Have the house surveyed by a qualified asbestos professional

Which of the following statements about lead exposure are true? ✔️ ✔️ Lead stays in the blood stream for approximately 30 days Lead stays in soft organs for 6 to 8 months

What current techniques are there to identify lead paint? ✔️ ✔️ X-ray fluorescence Laboratory Analysis 3rd party inspections (risk assessment)

What are the controls for lead based paint? ✔️ ✔️ Removal of LBP through safe work practices Enclosure/Encapsulation

Contractors are not required to be certified renovators if they do the following: ✔️ ✔️ Demolition of unoccupied structures MIOSHA Part 603 Rules are still applicable

Lead dust breathed in by adults can create disorders, including: ✔️ ✔️ Kidney and brain damage

How far back does the data and research show the dangers of lead paint? ✔️ ✔️ the early 1900s

If a house was built before what year, you should assume the house has lead paint ✔️ ✔️ 1978

To protect yourself from lead dust and debris, what should you do? ✔️ ✔️ Wear safety glasses Wear disposable coveralls and shoe covers Wear a respirator

When working with lead paint you should... ✔️ ✔️ Work wet and clean

Any code related penalties that are caused for the general contractor are the responsibility of... ✔️ ✔️ The subcontractor

Which of the following is NOT a responsibility of the subcontractor? ✔️ ✔️ Provides for toolbox safety talks

What are the three methods for alternative dispute resolution? ✔️ ✔️ Mediation, Arbitration, Facilitation

In which method of alternative dispute resolution is the award settlement binding and there is no appeal process? ✔️ ✔️ Arbitration

Change in conditions should be the responsibility of ✔️ ✔️ The owner

What should be included in the close out documents? ✔️ ✔️ Owner/operator manuals Copies of all warranties Check off list from mechanical contractors

With a permit, when should final payment be due? ✔️ ✔️ Upon final inspection

On new construction sites what are you required to have for everyone onsite? ✔️ ✔️ Toilet facilities

When having a contract signed, what should you be sure to verify first online or at the assessors office? ✔️ ✔️ Legal ownership

When asking a customer for a certain percent of money after a section of a job is completed it is called... ✔️ ✔️ progress payments

What is it called when, at the end of a job, you walk through with a customer and check off any needed repairs or discuss work to be redone? ✔️ ✔️ Final punch list

What are 2 items suggested to avoid in your contracts? ✔️ ✔️ Start and completion dates

Kitchen cabinet layouts from the kitchen designer are an example of what? ✔️ ✔️ Shop drawings

What is the most common type of contract used in residential construction? ✔️ ✔️ Lump sum contract

What should you be sure to include in your contracts? ✔️ ✔️ Change orders weather/ground conditions

buried debris

What is true in regard to a cost/plus fee contract? ✔️ ✔️ The total construction costs are unknown to the owner The contractor provides a target estimate You must have written agreement concerning payment of contractor fees

What type of contract is used when the scope of work is poorly defined and/or to cover emergency repairs and renovations to occupied facilities? ✔️ ✔️ Cost plus percentage of cost contract (T&M)

What type of contract requires the owner/architect to compile a list of total quantities as well as the contractor to provide the cost per unit to supply and install? ✔️ ✔️ Unit price contract

Homes built prior to what year require at least 1 smoke detector? ✔️ ✔️ 1974

What STATE law regulates discrimination on the jobsite? ✔️ ✔️ The Elliott-Larsen Civil Rights Act

A contract is not required if the job is under how much money? ✔️ ✔️ $1,000.

Within how many days of being on the jobsite must the I9 form be completed? ✔️ ✔️ 3 days

What act requires prevailing wages to be paid out? ✔️ ✔️ The Davis-Bacon Act

How many days after notification of a complaint does the respondent have to respond? ✔️ ✔️ 15 days

Once the investigative unit receives a complaint, who do they verify the legitimacy of the complaint with? ✔️ ✔️ The building inspector of the local jurisdiction (city building department)

According to the Americans with Disabilities Act (ADA), which of the following is NOT true? ✔️ ✔️ Employees are allowed to require a medical exam before making a job offer

Minimum Wage Law States ✔️ ✔️ After 40 hours in any one work week, compensation is 1 1/2 times the regular rate An employer shall not discriminate based on sex when paying employees for the same work requirement

Who is covered by the Employing Minors Youth Employment Standards Act? ✔️ ✔️ Ages 14, 15, 16 and 17

The Family Medical Leave Act states ✔️ ✔️ Employees may receive unpaid leave for certain reasons Employees may receive up to 12 weeks of leave in a 12 month period This law pertains to employers with 50 or more employees engaged in commerce or affecting commerce

A claim of lien MUST be completed within how many days of last being on the job site? ✔️ ✔️ 90 days

If after filing a claim of lien, you DO get paid before the lawsuit, what form must you complete? ✔️ ✔️ Discharge of construction lien

What is the maximum amount you can collect through a judgement in the small claims division of the district court using the small claims form DC84? ✔️ ✔️ $6,

After Mr. Jones receives a sworn statement that he owes ABC framing $40,000, how does Mr. Jones know that ABC framing was ever on the jobsite? ✔️ ✔️ The proof of service of notice of furnishing

According to the State Construction Code Act, how often will the state code be updated by the Construction Code Commission? ✔️ ✔️ Every 3 years

According to the Construction Lien Act, what must be supplied by owner, General Contractor, Sub-contractor or supplier within 10 days of being asked for a copy by anyone entitled to a copy? ✔️ ✔️ Notice of commencement

The "Claim of Lien" must be filed within days of LAST furnishing labor or materials for a project ✔️ ✔️ 90 days

Proceedings to foreclose must take place within of the date that the claim lien was recorded. ✔️ ✔️ 1 year

According to the Construction Lien Act, What recommendations are given for your protection? ✔️ ✔️ Never use your assets to complete someone's project Get sufficient down payments and/or obtain sufficient progress payments Have well defined contracts which include rights and responsibilities of binding parties

Which document lists each subcontractor, supplier and laborer, for whom payment of wages or fringe benefits and withholdings is due but unpaid, with whom the contractor/subcontractor has contracted/subcontracted for performance under the contract with the owner or lessee, and the amounts due to the persons as of the date of the statement? ✔️ ✔️ The sworn statement

The department, after investigation, may request a licensee to appear at such as is necessary to determine whether there is cause for complaint which would require a hearing on, or dismissal of, the complaint. ✔️ ✔️ Investigative conference

A respondent in a complaint may be represented by ✔️ ✔️ An attorney His/Her own self