Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Michigan Residential Builder’s License – Actual Exam Questions & Answers (2025 Edition) – Fully Solved, Verified Study Guide. This document contains the complete and up-to-date collection of actual test questions and 100% verified answers for the 2025 Michigan Residential Builder’s License Exam. It includes both Business & Law and Practice & Trade sections, covering key areas such as state regulations, licensing laws, building codes, contract types, OSHA and MIOSHA safety standards, construction math, lien law, estimating, structural components, and material science. Ideal for exam preparation, this A+ graded resource ensures full coverage of required knowledge for passing the licensing exam in Michigan. 100% Verified Exam Study Guide 2025 What is the 1st offense penalty for engaging i
Typology: Exams
1 / 84
This page cannot be seen from the preview
Don't miss anything!
What is the 1st offense penalty for engaging in the practice of residential building without a license?
When the board issues the findings of a verified complaint, what happens? - ans-Department will post on its website any final order of the board and the date it was issued According to the Administrative Rules, what does and application for a license include? - ans-The residence address of all individuals, partners, officers and/or members as requested by the board
According to the "Building Contract Fund", evidence of "intent to defraud" is defined as what? - ansWhen a contractor/subcontractor appropriates money to him/her self for building operations BEFORE the payment by him/her of all money due or so to become due to laborers, subcontractors, material men, or others entitled to payment According to the Construction Lien Act, what must be supplied by the owner, general contractor, subcontractor or supplier within 10 days of being asked for a copy by anyone entitled to a copy? - ansNotice of Commencement How many days does the owner, general contractor, subcontractor or supplier have to produce a copy of the Notice of Commencement when asked for a copy? - ans10 days The "Claim of Lien" must be filed within how many days of LAST furnishing labor or materials for a project? - ans90 days Proceedings to foreclose must take place within how many days of the date that the claim lien was recorded? - ans1 year According to the "Construction Lien Act", what recommendations are give for your protection? - ans- Never use your personal assets to completed someone's project
What allows an individual to invest in a general partnership but have no input as to how the partnership is operated? - ansA Limited Partnership What is it called when several business members come together to form a new business entity larger and more financially stronger than if they acted alone? - ansJoint Venture How many days after notification of a complaint does the respondent have to respond? - ans15 days Once the investigative unit receives a complaint, who do the verify the legitimacy of the complaint with? - ansThe building inspector of the local jurisdiction (City Building Department) If the dispute cannot be resolved at the informal conference, where does it go next? - ansAdministrative Law Hearings Examiner (AKA Hearing/Presiding Officer) Who are the findings/penalty(ies) of the Administrative Law Hearings Examiners are reported to? - ans-The respondent & claimant
In regard to a cost plus/fees contract, the total construction costs are known to the owner? - ansFalse In a cost plus/fee contract, the total construction cost will be UNKNOWN to the owner True or False In regard to a cost plus/fee contract, the contractor provides a target estimate? - ansTrue True or False In regard to a cost plus/fee contract, you must have a written agreement concerning payment of contractor fees? - ansTrue What type of contract is used when the scope of work is poorly defined and/or to cover emergency repairs and renovations to occupied facilities? - ansCost plus percentage of cost contract (Time & Materials) What type of contract requires the owner/architect to compile a list of total quantities as well as the contractor to provide price per unit to supply and install? - ansUnit Price Contract When having a contract signed, what should you verify first online or at the assessor's office? - ansLegal Ownership What is it called when asking a customer for a certain percent of money after a section(s) of the job is completed? - ansProgress Payment What is it called, at the end of a job, you walk through with a customer and check off any needed repairs or discuss work to be redone? - ansFinal Punch List What are 2 items suggested to avoid using in your contracts? - ans-Start Date
Who is responsible for corrections to completed work according to the subcontract? - ans-The general contractor
If a house was built before _______ you should assume the house has lead pain as a safety precaution? - ans To protect yourself from lead dust and debris, what should you do? - ans-Wear safety glasses
In regards to worker's compensation, what should you be sure that a subcontractor has before hiring them? - ans-A worker's compensation exclusion form
What are the 2 resources you have to promote your business? - ans-Time
The greater the pitch, the _________ the rafter has to be. - ansLonger What formula can be used to determine the length of a rafter if the slope and run are known? - ansA² + B² = C² What is the formula for estimating concrete into cubic yard? - ans(L x W x T) /. A driveway 60ft long by 20ft wide and 6" thick will need how many cubic yards of concrete? - ans cubic yards 60ft x 20ft = 1200ft 6in / 12in (1ft) = 0. 1200 x 0.5 = 600 600 x 0.037 = 22. Round up to 23 cubic yards True or False When measuring for concrete you should round up to the next full yard - ansTrue True or False When measuring concrete for basement walls, be sure to calculate the corners twice - ansFalse: When measuring concrete for basement walls be sure to NOT calculate the corners twice How do you change inches into a decimal point? - ansDivide inches by 12 What is the formula for board feet when calculating in FEET? - ans(W x T x L) / 12 What is the formula for board feet when calculating in INCHES? - ans(W x T x L) / 144 What is the formula for calculating stud count? - ansOn Center(O.C.) Spacing Length of wall in feet x 12 inches / 16 + 1 Do you figure for the walls AND ceiling when estimating for drywall? - ansYes When calculating ground slop, what will be the difference in elevation from the base of the home compared to the 50ft from the house with an 8% slope? - ans4 feet 50ft x 0.08(8%) = 4ft
What kind of elevations are part of the site plan? - ansElevations above sea level What shows the proposed and existing elevations and helps you identify if you need to cut or fill? - ansLeader Lines What are metes and bounds? - ansPart of the site plan that determines the lot line on large acreage properties If there is a basement, the finished flook must be ________ above the flood stage. - ans1 foot Ever city that has a river, stream or lake in it will have what? - ansFEMA Flood Map On the site plan, What does AB represent? - ansAs Built What is a swale? - ansWhere the land is graded to form a shallow ditch so that storm water drains in the direction the builder wants it to go On the site plan, what does HP represent? - ansHigh Point A standard set of regulations that govern the procedure and details of construction is called what? - ansThe Building Code What type of house is built before there is a buyer? - ansA speculative (spec) house The official survey, deed, abstract title, and the contract of sale are all considered what? - ansLegal Documents What is a stock plan? - ansA standard house plan that can be adapted to fit many different lots When does Act 230 require you to have an architect? - ansWhen the home has over 3500 square feet of habitable space What consists of lines, dimensions, symbols and notes? - ansAn architectural drawing A bypassing sliding door is also known as what? - ansA glide by door What shows the building lot with boundaries, contours, existing roads, utilities and other details such as existing trees and nearby buildings? - ans-Site Plan