Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Michigan Residential Builder's License |Questions and answers with 100% correct solutions | Graded A+ 2025-2026
Typology: Exams
1 / 70
This page cannot be seen from the preview
Don't miss anything!
Created to serve as a complete, comprehensive code regulating the construction of single-family, two- family and buildings consisting of three or more townhouse units. ✔✔IRC (International Residential Code) Administrative ✔✔First 2 chapters of code book are True ✔✔Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F Yes ✔✔Does the building official have the authority to render interpretations of the code? 8 foot fence. ✔✔None of the following require a permit, EXCEPT: sidewalks and driveways tiling an 8 foot fence playground equipment False ✔✔Tables and illustrations are always supported by information found in the written code and footnotes. T or F Live load. ✔✔The amount of evenly distributed weight imposed by inhabitants, goods and removable objects on a floor or roof system is referred to as True. ✔✔If a code requirement is in the book, it is both acceptable and enforceable by the code official. T or F
Figures. ✔✔Illustrations are typically referred to as Determine that buildings are built to the minimum enforceable standard. ✔✔Generally speaking, the building official's job is to True. ✔✔It is required that all manufacturer instructions be at the jobsite at the time of inspection. T or F Kitchen. ✔✔All of the following are not considered habitable spaces EXCEPT: bathrooms kitchens storage spaces closets
Registered design professional. ✔✔The 2009 IECC requires a permanent certificate posted on the electrical distribution panel. The certificate shall be completed by the builder or State energy code requirements. ✔✔One hurdle contractors face when bidding for an energy efficient project is choosing materials that fit the design, and also meet False. ✔✔Historically significant buildings are not exempt from code changes. T or F R-value Settled thickness Manufacturer name ✔✔Insulation products (blown and sprayed) must be documented with: March 2011. ✔✔The new Michigan codes took effect in
Windows Attic access hatches Recessed lights ✔✔Air leakage is the random movement of air into and out of ________ through cracks and holes. Table 402.1. 2009 IECC ✔✔R-values for insulation and fenestration requirements by component can be found in International Energy Conservation Code ✔✔IECC U-factor and UA alternatives. ✔✔The _____________ compliance method allows for more innovative construction techniques like SIPs or Advanced Framing. 500 sq feet ✔✔R-30 is permitted in vaulted ceilings, but is limited to True. ✔✔Floor insulation must be installed to maintain permanent and continuous contact with the underside of the subfloor decking. T or F 5, 6 and 7. ✔✔Michigan falls into climate zones False. ✔✔It is permissible for supply ducts to be run through the framing cavities of a residential building. T or F IC rated (Insulation Contact) ✔✔__________ means an electrical fixture has been tested and listed as suitable for installation in a cavity where the fixture may come in contact with insulation. 3%. ✔✔According to the Dept. of Energy, improved energy codes could reduce CO2 emissions by 300 sq ft. ✔✔Attic insulation markers must be installed every _____ square feet.
6 ft. IRC R105.2 ✔✔Although contractors should check for restrictive covenants and local zoning requirements, a permit isn't required from the building official for installing a fence not over _______ tall. 180 days. ✔✔If a permit is applied for but not yet approved and the applicant is not persueing approval after______ days the application will be considered abandoned. Yes. ✔✔Can a building official revoke a Certificate of Occupancy? True. ✔✔When a project requiring a permit has commenced prior to the issuance of a permit, the building official is authorized to charge an additional fee. T or F 450 ✔✔Foam plastic is used as insulation. The flame spread index cannot exceed 75 and the smoke development index cannot exceed 8". ✔✔Foam plastic used for interior trim shall have a maximum thickness of 1/2" and a maximum width of 10%. ✔✔Foam plastic interior trim must not constitute more than __________ of the total wall and ceiling area of any room or space. 1/2". ✔✔Foam plastic used as insulation in walls must be separated by an approved thermal barrier. What is the minimum thickness of gypsum wall board being used as a thermal barrier for spray foam insulated walls? Framing. ✔✔Which of these inspections happens last? Mechanical rough Plumbing rough Framing Electrical rough
Yes. ✔✔A retaining wall will be five feet tall from the bottom of the footing to the top of the wall. Do you need to pull a permit? At the time of inspection. ✔✔Your building is utilizing engineered products such as engineered floor joists. When do the installation instructions need to be available at the work site? 1 3/8" solid wood 1 3/8" honeycomb core 20 minute fire rated Any of the above ✔✔A door directly between a garage and a residence shall never open directly into a sleeping room. The door must also be 1 1/4" ✔✔The nosing for stairs shall not be less than 3/4" but not be more than No. ✔✔A front porch is 25 inches above the grade below. Are guards required to be installed? False. ✔✔If a smoke alarm is in a bedroom, it doesn't need to be right outside the bedroom also. 1/2" ✔✔If spray foam insulation is used to insulate a wall, what is the minimum thickness of drywall needed to cover the foam plastic? 200 ✔✔Finishing materials used for walls and ceiling shall have a flame-spread index not to exceed No. ✔✔Wood joists are 19" above exposed ground. Do they have to be preservative treated or naturally durable wood? True. ✔✔You may bulldoze, grade and remove tree stumps in a wetland as long as you have a permit.
15 feet from the property line. ✔✔A side yard easement of 15 feet means your building structure must be: Who set the monument When was it set Where was it set ✔✔You can identify survey monuments by the following Easements. ✔✔Public _________ provide utilities access to run lines or pipes across or under your property. Fill. ✔✔A deposit of earth material placed by artificial means is called True. ✔✔Grading is changing the earth surface by either excavating or filling or a combination of both. T or F Rough grade. ✔✔The stage at which the grade approximately conforms to approved plans is called: True. ✔✔Water wells should be located on the opposite side or uphill side of the house from the drainfield. T or F Lifts. ✔✔When back filling around the foundation the soil should be compacted in __________ of 6 inches at a time. True. ✔✔The ablility to achieve maximum density when compacting soil requires that the soil has it's optimum moistute content. T or F True. ✔✔The heavier the plates are on a vibratoty plate compactor the more compaction force it will generate. T or F False. ✔✔All soil types have the same optimum moisture content for compaction.
Plot plan and site plan. ✔✔Which drawing shows the shape and boundary lines of a lot, as well as locating the building, driveway, sidewalks, well and septic system, elevation contours, etc. Plot Plan Site plan Elevation plan Both A and B Proctor test Sand cone test Nuclear density test ✔✔What is a method of determining soil density? Without adequate moisture or containing too much water. ✔✔It is virtually impossible to compact soil without adequate moisture containing too much water with optimum moisture content both A and B Point of reference or a benchmark. ✔✔A basic starting point from which measurements in building layout can be made using a transit or builders level is called a All of the above. ✔✔When building in a floodplain, special precaution must be made concerning: flood resistant construction. determining the design flood elevation. placing the lowest floor at the proper elevation. all of the above Parking vehicles , building access or storage. ✔✔When building in a floodplain, enclosed areas below the design flood elevation will be used solely for
Lifts. ✔✔When compacting soils, soils should be compacted in ____________________ of 6 inches. This will provide for proper compaction through all levels. Slope. ✔✔A ground surface inclination expressed as a ratio of horizontal distance to vertical distance is called Hand shovel. ✔✔How should the excavator remove excess soil from beneath a buried electrical line? Prevent evaporation. ✔✔There are two ways to insure proper curing of concrete: apply water to make up for water lost due to evaporation, and True. ✔✔When pouring concrete, the concrete should be placed near its required point. Excessive handling of the concrete weakens it. T or F Never acceptable. ✔✔Pouring concrete on frozen earth is: 1/2" ✔✔The diameter of a No. 4 deformed bar is: All of the above. ✔✔Which of the following are true in regard to cold-weather construction? calcium chloride is added to concrete to help it set quickly. insulation of straw, hay, or polyethylene is placed around concrete footings. concrete block walls are usually laid with heated mortar. all of the above 1/4 the thickness. ✔✔When sawing a control joint in a concrete slab, the joint must be a minimum of how deep? Middle one third. ✔✔Rebar placement for a footing should be in the ________________________ of the footing depth.
Chairs. ✔✔The most precise way of positioning rebar for a slab is to use: True. ✔✔Chairs are classified according to their degree of rust protection. Class #1 is the maximum protection, class #2 is moderate protection, and class #3 is no protection. T or F Curing. ✔✔Proper __________________ prevents most problems in the finished concrete. Methods used to ensure a high quality, finished product, include a sprayed on membrane curing compound, polyethylene sheets, waterproof paper or wet burlap. Slump cone. ✔✔A _________________ is a 12" high cone which determines the amount of water in the mix. 5% to 7% ✔✔In cases of severe cold weather exposure, the air content in a concrete mix should be about: Scale or spall. ✔✔If concrete is exposed to de-icers and it is not air entrained, it will: Scaling. ✔✔When concrete becomes flaky and fragmented on the surface, this is called: One quarter the space between side forms Three quarters the space between reinforcing bars One third the depth of the slab on ground ✔✔The maximum size aggregate is limited to the lesser of: 150 lbs. ✔✔How much does one cubic foot of concrete weigh? 28 days. ✔✔Concrete is considered to be fully cured or set after ______________days. True. ✔✔Air entrainment protects concrete from frost damage, but also makes concrete more workable. For that reason, not as much water is necessary for the mix. T or F
Power screed. ✔✔As concrete is placed in a form it needs to be leveled off. This can be done manually or mechanically with a Movement, expansion or contraction. ✔✔A control joint allows for what? To slow down the setting time of concrete. ✔✔What is the purpose of adding retarders to a concrete mixture? Water reducers. ✔✔What is added to make concrete more workable with less water? 10' ✔✔A one car driveway should have a minimum width of? 18' ✔✔A two car wide driveway is usually how wide? 3" ✔✔Where concrete is cast against and permanently exposed to the earth, reinforcement steel should be __________________ from the earth. Increase the slump to the level specified in the mix design. ✔✔In most specifications, adding water to a batch of concrete is permitted only one time at the job site as long as the water/cement ratio is not exceeded. This would be done in order to: Lower the cement factor and increase the size of the aggregate. ✔✔A method to prevent cast concrete from excessive shrinking is to: Control random cracking. ✔✔Contraction joints, also known as control joints, in a slab are used to: Movement ✔✔Isolation joints isolate differing parts of a structure to permit independent:
Construction joints. ✔✔________________________ are a convenient way to limit the size of the placement of concrete to a manageable volume and are a stopping place for a day's work. Base. ✔✔For a slab placed below grade, it is necessary to provide at least 4" of crushed gravel or stone. This should be compacted. It will prevent moisture from collecting under the slab. This 4" area is known as ________________________. At least 12 hours. ✔✔The timing for the removal of forms is important. The concrete has to achieve a strength great enough to support its own weight and the weight of any construction loads placed upon it. General guidelines for wall and column form removal is _________________________ after placement. Rich concrete. ✔✔Concrete that has a lot of Portland cement in the mix may be referred to as: Improves ductility and reduces surface cracks. ✔✔What is the reason for using fiber reinforcement in concrete? Form release agent (oil). ✔✔What is used to prevent concrete from sticking to wood forms? Calcium chloride. ✔✔The most commonly used additive to help concrete set rapidly and more cohesively is: Tool for leveling concrete. ✔✔What is a screed? 90 minutes. ✔✔With the exception of special conditions, maximum delivery time between the water being mixed with the Portland cement in batching and the time of completion of discharge from a transit-mix truck is Prevent cracks from opening. ✔✔What is the sole purpose for welded wire fabric in a floor slab? True. ✔✔The reason for tying reinforcing bars with tie wire is to keep the rebar in place while pouring. It does not add any additional stength to the concrete. T or F
Hydration ✔✔When water is added to Portland cement it causes the mass to harden. This reaction is called: Calcium chloride. ✔✔Accelerators speed up the curing process. Which of the following is an accelerator? True. ✔✔Concrete cures best in cool, damp environments. T or F Durability Surface soundness Reducing cracking ✔✔Besides ensuring the proper strength of concrete, proper curing of concrete also aids in: 12" R1003.2 Chimneys ✔✔What is the minimum thickness of concrete footings for fireplaces? 3 1/2" ✔✔What is the minimum thickness of concrete used for floors on grade? Hot days and large pours with small crews ✔✔Retarders slow down the setting time of concrete allowing more time for finishing. This is especially useful on: True. ✔✔When pouring concrete directly on earth for exterior purposes such as driveways and side walks, if the base is dry it will tend to draw the moisture out of the concrete prematurely. It's a good idea to moisten the base prior to the pour, no puddles though. Concrete not being air entrained Overworking while finishing air entrained concrete Exposure to deicers within 30 days of the pour ✔✔Scaling of concrete is caused by? True. ✔✔Concrete with larger aggregate will need less air entrainment. T or F
Sand and water. ✔✔When air entrainment is used the amount of _________ in the mix is reduced. T or F Cool damp conditions. ✔✔Concrete cures best in? Once. ✔✔Transit mix concrete allows for water to be added to the mix ________ at the jobsite. Hydrolic cement or epoxy injection. ✔✔To repair a crack in a concrete foundation wall use Slope the ground away from the wall 5% Use impermeable backfill at the building perimeter Install downspouts that carry water away from the foundations ✔✔The best way to avoid moisture problems below grade is to: House wrap. ✔✔___________ allows water vapor molecules to pass through, while keeping out liquid rain water. Siding. ✔✔__________ is the first line of defense against moisture coming in contact with the wall framing, insulation and interior wall finishing. 6" ✔✔Exterior wood framed walls, sheathed walls and wood sidings that are less than ____" above finished grade must be made of either naturally durable wood or preservative treated wood. 1 1/4 inch ✔✔The minimum horizontal lap for fiber cement siding is U-factor. ✔✔The IECC defines _______ as: The rate at which a window, door, or skylight conducts non- solar heat flow True. ✔✔The lower the U-factor, the more energy efficient the window is. T or F