Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
NCCCO Certification of Crane Operators Core Exam Questions and Answers 100% Pass | Graded A+
Typology: Exams
1 / 18
This page cannot be seen from the preview
Don't miss anything!
David Mungai [Date] [Course title]
Which of the following is an accurate statement about luffing jibs?
The crane operator should respond to the stop signal from anyone - Answer>> True On a rough terrain crane what is the strongest quadrant? - Answer>> Front If an operator does not boom up to allow for a boom deflection, the load will? - Answer>> Move away from the Crane Where should the boom be positioned when beginning a lift? - Answer>> Directly over the center of gravity of the load A crane should always be barricaded within? - Answer>> The swing radius of the rear of the rotation superstructure counterweight The crane must have a ______ inspection performed both monthly and yearly. This information must be documented by the employer that conducts the inspection. - Answer>> Periodic Slings should always be marked with a capacity rate in tag. - Answer>> True The wire rope clip on a wedge socket Should always attached to the _______ Of the Crane. - Answer>> Dead end It is possible for a crane to be overloaded with no signs of tipping.
In order to operate a mobile crane on a barge, you must have - Answer>> List and trim capacity chart When lifting a load out of the water, the load will be come ________ When it breaks the surface - Answer>> Heavier What must be done when operating on a barge? - Answer>> Attach the crane to the barge Mobile crane is more stable when: - Answer>> The cranes leverage is greater than the load leverage As a crane tips the loads leverage - Answer>> Increases What should be done if a crane has a cracked windshield? - Answer>> Continue to operate if it causes no visible distortion On a truck crane or all-terrain crane, the strongest quadrant is normally the? - Answer>> Rear If boom links are in between on the load chart you should always:
What are the industry standards that cover mobile cranes? - Answer>> OSHA 1926.1400 and ASME B30. In rotation resistant rope, if you have _____ broken wires and six rope diameter and ______ In 30 rope diameters, the rope must be removed from service. - Answer>> 2, And standard rope if you have _____ broken wires randomly distributed in a rope lay and ________ broken wires in a strand in a Lay It must be removed from service. - Answer>> 6, When picking off the main boom, what determines the unused jib deduction? - Answer>> The effective weight of the jib Setting up a mobile crane with long boom on uneven ground, what support condition should be considered? - Answer>> Keeping it 90° between cylinder rod and the pad How should the tires be positioned when setting up a crane on outriggers? - Answer>> All tires relieved of the cranes weight or preferably off the ground Who is responsible for determining the weight of the load? - Answer>> Lift Director A DOT Medical card normally is good for a period of how many years? - Answer>> Two years Upon arriving on site, the lift Director observed ground conditions are not suitable for safe crane operations, they should contact: - Answer>> Controlling entity
A _______ should decide the rigging points for an engineered lift are appropriate to ensure a safe lift: - Answer>> Qualified person The _______Shall ensure a qualified person has been designated lift Director: - Answer>> Site supervisor The _______ shall determine powerline proximities: - Answer>> Site supervisor When is it OK to use a swivel on rotation resistant wire rope? - Answer>> If manufacturer approves What should be done by the crane operator if the LMI malfunctions? - Answer>> Stop crane operations and report it to the supervisor Can a cranes lifting capacity be lower than its net capacity? - Answer>> Yes What should be done if the operator cannot see the outriggers for extension? - Answer>> Use a signal person Name The three ways that two blocking can occur? - Answer>> extending boom, hoisting or lowering the boom According to ASME Be 30.5 where should a portable fire extinguisher shall be installed? - Answer>> In the cab or at the machinery housing Where should the tools be kept on a crane when they're not being used? - Answer>> Toolbox
What is the most important factor when determining the capacity of the jib? - Answer>> Angle When is it OK to side load the boom of the Crane? - Answer>> Only when freely suspended loads On a boom truck, what is the normally the strongest quadrant? - Answer>> Rear What is a temporary alternative measure if the anti-two block is not functioning properly? - Answer>> Report the deficiency to your supervisor and mark the cable When should the crane operator check operational aids? - Answer>> Daily Cranes that have been idle for _____ Months or more must be given a monthly inspection by a qualified person. - Answer>> 3 The capacity of an extension or jib is normally based on? - Answer>> Structural strength The Outrigger pad or float must be secured to the stabilizer - Answer>> True Blocking under the outrigger pads is used for what purpose? - Answer>> Distribute the weight of the crane and a load over a greater surface area Which of the following statements apply during pick in Carry. - Answer>> Keep the boom as short as possible When driving a crane under powerlines in transit, the minimum distance is _______ up to 0.75 KV dot - Answer>> 4
If the crane does come into contact with powerlines, you should: - Answer>> Remain in the cab and try to disengage Crane from contacts If it is necessary to leave the Crane after contact with powerlines before they can be de-energized, you should - Answer>> Jump down then slowly shuffle away or take short jumps with feet together Always maintain at least _______ wraps on the drum unless the manufacturer states otherwise. - Answer>> 2 The rigging on a personal platform must have a _____1 safety factor. - Answer>> 5 When the load is________ or more of maximum line pole the operator must test the brakes of the crane by lifting the load a few inches in applying the brakes. - Answer>> 90 The term running wire rope refers to: - Answer>> A wire rope that moves over sheaves and drums Defined the term assist Crane - Answer>> A crane used to assist in assembling and disassembling a crane What must be done to ensure outriggers are in manufacturers specify position? - Answer>> Beam is pinned or marking shows it is correct configuration The crane must be equipped with an audible signal device horn - Answer>> True
Hooks should be removed from service if any increase in the throat opening exceeds ________ or as recommended by the manufacturer - Answer>> 5% In order to make sure the correct load chart is being used you should always go by there? - Answer>> Serial# On a mobile crane, the capacity can be increased by - Answer>> Booming up The boom angle on telescoping boom crane is ________After the load is lifted - Answer>> Angle between bottom of the base boom and horizontal The boom angle on lattice boom crane is ________ After the load is lifted - Answer>> Angle between centerline of boom and horizontal You should always extend boom sections equally unless the manufacturer states otherwise? - Answer>> True The big section being extended further would cause what? - Answer>> Tipping The smaller section being extended further would cause what? - Answer>> Structural damage What is accurate when measuring boom length? - Answer>> Measure from hinge pin to center of the boom tip sheaves When setting up a crane equipped with a front stabilizer, the front stabilizer should be put down _____. - Answer>> Last
Net capacity is determined by: - Answer>> Gross capacity minus all deductions Which of the following would cause the load to be more stable? - Answer>> Rigging above the center of gravity When must a signal person be used in relations to powerline proximity? - Answer>> If within boom length of the prohibited zone Wind blowing can cause backward tipping, side load your boom and increase your low radius - Answer>> True What can be done to prevent wire rope from unraveling when being cut - Answer>> Seizing Ground bearing pressure is: - Answer>> The pressure created by the weight of the crane and the load onto the outriggers What is most important when determine the capacity of the jib? - Answer>> Angle Running ropes should be removed from service if there are______ randomly distributed broken wires in a lay or______ broken wires in a strand in a lay - Answer>> 6, Rotation resistant ropes should be removed from service if there are______ broken wires and six rope diameters or_____ broken wires in 30 rope diameters - Answer>> 2, According to OSHA, what is the removal criteria for Standard running rope to be taken out of service? - Answer>> Six broken wires in a lay
What is the minimum distance for a crane operations around the powerline up to 50 KV? - Answer>> 10 ft What is the minimum distance around powerlines with the boom and transit position while driving under powerlines? - Answer>> 4 ft What is the minimum distance for a crane operations around powerlines that are 720 KV? - Answer>> 35 ft What is the minimum distance around powerlines with boom in transit position while driving under power lines and voltage is 350 KV - Answer>> 16 ft What is the minimum distance for crane operations around powerlines that are 150 KV? - Answer>> 15 ft What is the minimum distance around powerlines with boom in transit positions while driving under powerlines if voltage is 40 KV? - Answer>> 6 ft What is the minimum distance for crane operations around powerlines that are 800 KV? - Answer>> 45 ft What is the minimum distance around powerlines with boom in transit position while driving under powerlines in voltage is 150 KV? - Answer>> 10 ft When should blocking be used under the outrigger pads of the crane? - Answer>> When the support surface will not support the crane and load
What will happen to the ground bearing pressure if you move a crawler crane from soft ground to harder ground? - Answer>> It increases When Can the LMI or overload warning system of a crane be bypassed? - Answer>> Only during assembly and disassembly Who is not allowed in the fall zone according to OSHA 1926 sub part cc? - Answer>> Qualified rigger What is the function of a holding valve? - Answer>> Prevents loads on cylinders from dropping and uncontrolled manner What is the maximum angle allowed between two slings on a hook? - Answer>> 90 What is the maximum angle allowed between two slings in a shackle? - Answer>> 120 What is the angle allowed to horizontal between two slings on a hook - Answer>> 45 What is the angle allowed to horizontal between two slings in a shackle - Answer>> 30 Where can you find the standard hand signals for mobile crane operation? - Answer>> OSHA subpart CC Which of the following cannot be done to the hoist line - Answer>> Splice the hoist line When directing a crane using voice signals, what must the channel being used to be? - Answer>> Dedicated