Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A comprehensive review of the nccco certification rigging 2024 exam, covering a wide range of topics related to crane operations, rigging, and safety. Detailed questions and answers on various aspects of rigging, such as signal communication, load calculations, sling selection, and inspection procedures. It is designed to help candidates prepare for the nccco rigging certification exam by providing them with a thorough understanding of the exam content and the necessary knowledge to pass the exam. Structured in a clear and organized manner, making it easy for readers to navigate and find the information they need. Overall, this document is a valuable resource for anyone seeking to obtain the nccco rigging certification or to enhance their knowledge and skills in the field of crane operations and rigging.
Typology: Exams
1 / 11
This page cannot be seen from the preview
Don't miss anything!
David Mungai [Date] [Course title]
a signal person must be provided when the point of operation, meaning the load travel or the area near or at load placement is not in full view of the: - Answer>> operator when the equipment is travelling and the view in the direction of travel is obstructed, a ____________ must be provided - Answer>> dedicated spotter For each signal, prior to giving the function/direction, the signal person must: - Answer>> notify the crane who the signal is for When non-standard signals are used, the following people must contact each other prior to the lift operation and agree upon the non-standard signals which are going to be used: - Answer>> signal person, operator, lift director which of the following are the three required elements of a voice signal? - Answer>> distance, function, direction How many persons may share a dedicated channel for the purpose of coordinating operations? - Answer>> as many as are required per the lift plan which of the following are set to give the operator sufficient warning to prevent encroachment of power lines? - Answer>> proximity alarms when using electronic transmission devices, the transmitted signal must be: - Answer>> effective, clear, and reliable
any overhead crane consists of three basic units; the bridge, trolley, and: - Answer>> hoist carrier-mounted lattice boom cranes are also commonly referred to as __________ cranes. - Answer>> crawler the crane is said to be in a particular quadrant of operation when the ______________ is located over that area - Answer>> load hook in addition to using flags and barricades to show the work zone near power lines, the employer can define the work zone area ________ degrees around the equipment up to the equipment's maximum working radius - Answer>> 360 two-blocking occurs when the ___________ or headache ball makes contact with the sheaves at the boom tip - Answer>> block industrial cranes have _____________ centers of gravity to permit operation in narrow aisles or runways without outriggers - Answer>> low high wind speed acting on the __________ of the boom can cause it to topple backward if it is at a high boom angle - Answer>> front whenever anything is lifted or raised from a horizontal position to a vertical position, the crane load will be equal to _________ the weight of the object until the object is vertical and clears the ground - Answer>> 100%
as a crane starts to tip, the load _________ begins to increase. This increases the load's leverage on the crane and the tipping force - Answer>> radius rotation of the upper works changes the location of the crane's: - Answer>> center of gravity critical lifts are those where the load weight is close to the rated capacity of the crane. When the lifting load weighs more than 75% of the rated capacity, or when lifts involve two or more cranes, be sure to check the boom: - Answer>> angle the leverage the crane exerts on the load changes as it: - Answer>> stops when making a vertical lift using a four-point hookup, how many sling legs are assumed to be supporting the load? - Answer>> three when performing a load inversion, under ideal conditions, the heavy end of the load should be: - Answer>> lowered the single greatest cause for fatalities in crane accident is: - Answer>> underestimating load weight what potential hazard is associated with lifting/moving a load secured with hand chain hoist/lever hoist? - Answer>> unsecured load and loose chains one of the steps in a rigging planning session is to determine the stability of the load based upon the rigging attachment points associated with its center of gravity. Why is this an important planning step? - Answer>> you know what the load will do in terms of movement when it is picked up
Per ASME Standard, fiber core wire rope slings of all grades shall not be exposed to temperatures in excess of what degree F (degree C)? - Answer>> 194(90) Shackles with screw pins are sized by the: - Answer>> diameter of steel in the bow section Hook inspections shall include: - Answer>> cracks and point twist while inspecting shackles prior to use, any: - Answer>> shackles with damaged threads should not be used when a wire rope is bent around an object whose diameter is equal to the diameter of the wire rope load capacity of the wire rope: - Answer>> is reduced A turnbuckle is used to: - Answer>> adjust sling length what type of hitch produces a 360-degree contact with the load and tightens as the lift takes place? - Answer>> double wrap choker hitch knots shall not be used to configure synthetic rope slings because knots: - Answer>> significantly reduce the strength of synthetic rope slings a shoulder type eyebolt must be used when you need to: - Answer>> put an angular pull on an eyebolt the ________________ is used to join two wet ropes: - Answer>> double sheet bend
If the center of gravity (cg) shifts during the lifting of an equally balanced (2) pick load, the pick point nearest the cg will: - Answer>> increase in load in a basket hitch the capacity of the sling will be: - Answer>> 200% SWL Per ASME standard nylon and polyester slings shall NOT be used in contact with temperatures in excess of what degrees F (degree C)? - Answer>> 194 (90) a knot that is used to form a loop at any point in the rope between its ends is called a: - Answer>> bowline in a bight The term that applies to the size of a block sheave relative to the size of the rope running through it is: - Answer>> D/d ratio when spooling wire rope onto a tugger, what is the correct procedure? - Answer>> wind an overwound drum from the opposite top side of the spool which friction reducing tool has the least amount of friction? - Answer>> air bearings which friction reducing tool is constructed using a series of rollers attached to a chain on each side? - Answer>> caterpillar dollies Given the attached drawing, determine the minimum thread engagement for the 3/8" eyebolt per the attached load - Answer>> 1/2" what is the main purpose of a spreader bar? - Answer>> distribute the load of a lift across more than one point
the maximum number of parts of line that may be used when reeving fiber rope before friction loss is greater than mechanical advantage is: - Answer>> 8 what is the best hitch to use for lifting a small bore pipe vertically?
turnbuckles should be inspected: - Answer>> after each use the factor in the "Rule of Thumb" formula for safe work limit of a three-leg bridle hitch is: - Answer>> two