












Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A set of practice questions and answers for the nccco mobile crane exam. It covers various aspects of crane operation, safety, and regulations, including boom operation, load charts, outrigger setup, and signal communication. Designed to help individuals prepare for the exam by providing a comprehensive overview of key concepts and practical applications.
Typology: Exams
1 / 20
This page cannot be seen from the preview
Don't miss anything!
b. They must not be used c. They are based on the stability of the crane d. They should only be used if the crane is set up on outriggers - ANSWER: c.
a. From the base of the boom to the center of the boom tip sheave b. From the boom hinge pins to the boom tip c. From the boom hinge pins to the center of the boom tip sheaved. d. From the base of the boom to the boom tip - ANSWER: c.
d. It decreases by half - ANSWER: a.
b. Turn it off and continue as if the LMI were not installed c. Make mathematical allowances for any error d. Attempt to repair the fault - ANSWER: a.
b. out from under the boom c. on top of boom holding pendants d. in sight of the operator - ANSWER: b.
d. none - ANSWER: b.
When should tag lines be used? - ANSWER: When the rotation of the load becomes hazardous What shall be in the operator's cab during crane operations? - ANSWER: Load charts Which of the following is considered duty-cycle work? - ANSWER: Clam-shell digging When doing duty cycle work, the load chart must be reduced by how much? - ANSWER: 20% Which components are not parts of the boom? - ANSWER: Heel pins The boom angle is the angle between ___________________. - ANSWER: the ground and centerline of the boom, between sheaves and heel pins Three short audible signals mean - ANSWER: back-up According to ANSI B30.5, hand signal chart shall be posted where? - ANSWER: On the job site A signal person shall be ________________. - ANSWER: designated person, tested An anti-two-block device can be used _________________. - ANSWER: to test the LMI
The load chart is matched to the crane by: - ANSWER: Serial number Where do you find recommended reeving for the hoist lines? - ANSWER: Owner's manual Not extending telescoping boom sections equally; what may occur? - ANSWER: Longer section collapse What are the broken wire removal requirements for rotation resistant wire rope? - ANSWER: 2 broken wires in 6 diameters or 4 in 30 diameters How should wire rope be inspected during a frequent inspection? - ANSWER: Visually What is the object of rope lubrication? - ANSWER: A and B What is the design factor for rotation resistant rope used as a hoist line? - ANSWER: 5: The load hoist drum flange shall be _________________. - ANSWER: 1/2 in. or higher over the top layer of rope With the hook in the extreme low position, how many wraps shall remain on the load hoist drum? - ANSWER: 2 Load hoist sheaves and boom tip sheave shall have pitch diameters not less than times the nominal diameter of the rope used. - ANSWER: 18
Per ANSI B30.5, when operating near high voltage line of 250 KV the minimum clearance is ___________________. - ANSWER: 20 FT Per ANSI B30.5, when in transit under power lines of 350 KV the minimum clearance is? - ANSWER: 16 FT