Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

NCCCO Mobile Crane Operator Certification Practice Questions, Exams of Machine Learning

A series of practice questions designed to prepare individuals for the nccco (national commission for the certification of crane operators) mobile crane operator certification exam. The questions cover essential aspects of crane operation, including signaling, load chart interpretation, and safety procedures in hazardous situations such as contact with energized power lines. It serves as a study aid for those seeking to demonstrate their knowledge and competence in crane operation, ensuring they are well-versed in industry best practices and safety regulations. The document focuses on practical knowledge and decision-making skills necessary for safe and efficient crane operation.

Typology: Exams

2024/2025

Available from 06/04/2025

Fortis-In-Re
Fortis-In-Re 🇺🇸

1

(1)

2.3K documents

1 / 20

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
NCCCO MOBILE CRANE PRACTICE TESTS
2025 -2026
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14

Partial preview of the text

Download NCCCO Mobile Crane Operator Certification Practice Questions and more Exams Machine Learning in PDF only on Docsity!

NCCCO MOBILE CRANE PRACTICE TESTS

1. What action does a signal person intend the operator to perform if he extends his arm at QUESTIONS shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - ANSWER-c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% ©. 5% d. 8% - ANSWER-a. 3. The load line of the crane you're operaling contacts an cnergized power linc. There’s no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump down, feet together c. Stay in the cab until the lines are de-cnergized d. Get as far away from the crane as possible - ANSWERc. 4. According to OSHA 1926.1413, how many randomly distributed broken wires in rotation- resistant rope are cause for replacement. of the rope? a. 1 broken wire in 6 rope diameters b. 2 broken wires in 39 rope diameters c. 3 broken wires in one strand in one lay d. 2 broken wires in 6 rope diameters - ANSWER-d. 3. What is the net capacity of a crane on main boom unless the manufacturer states otherwise? a. The capacity listed in the load chart minus the weight of the rigging and all attachments b. The capacity listed in the load chart plus the weight of the rigging and all attachments c. The capacity listed in the load chart minus the weight of the rigging and all atlachments nol. in use d. The capacity listed in the load chart minus the weight of the rigging alone - ANSWER-a. 6. What may happen to a properly rigged load when lifted off the ground unless the operator takes account of boom deflection? a. It could swing oul. away from the crane b. It could swing in towards the crane c. It could raise absolutely vertically d. It could shift in its rigging - ANSWERa. 7. What Standard Method hand signal is being illustrated? a. Swing b. Stop b. They must not be used c. They are based on the stability of the crane d. They should only be used if the crane is set up on outriggers - ANSWER-c. 12. In which quadrant are rough terrain crane capacities generally greater? a. Over the front b. Over the rear c¢. Over the right side d. Over the lott side - ANSWER-a. 18. According to federal requirements, under whal conditions is il okay for a person to ride the headache ball? a. When there is no other way to gain ace b. When the lift has been approved by an engineer c. When other means would be more dangerous d. It isnever okay - ANSWERd. 14. By what percentage do most manufacturers require a crane’s load chart capacity to be reduced by for duty cycle operations such as high-volume concrete placement? a. 10%. b. 15%. ©. 20%. d. 30%. - ANSWER-c. 15. From which two points should the boom be measured? a. From the base of the boom to the center of the boom tip sheave b. From the boom hinge pins to the boom tip c. From the boom hinge pins to the center of the boom tip sheaved. d. From the base of the boom to the boom tip - ANSWER-c. 16. What is the preferred method of installing wire rope from a reel onto a hoist drum? a. The rope runs from the top of the reel to the bottom of the drum b. The rope runs from the bottom of the reel to the top of the drum c. The rope runs from the top of the reel to the top of the drum d. There is no preferred method - ANSWER-c. 17. Over which quadrant are truck crane capacities usually greater? a. Over the front. b. Over the rear. ¢. Over the front right outrigger. d. Over the side. - ANSWER-b. 18. According to OSHA, which accessible area of an operating crane must always be barricaded? a. The swing radius of the crane b. The carbody or chassis c. The swing radius of the rear of the rotating superstructure d. The distance between the car bady or chassis and the boom tip - ANSWER. 19. What is the OSHA regulation governing cranes in construction? 23. According to OSHA, while hoisting personnel, the total load must not exceed what percentage of the crane's rated capacity?" a. 45% b. 50% c. 75% d. 85% - ANSWER. 24. When is side loading of crane booms permitted? a. When the operator says it's OK b. So long as no jib is installed ¢. Only when the outriggers are fully extended d. Only with freely suspended loads - ANSWERd. 25. What is indicated if an operator makes two audible signals when moving a crane? a. He/she intends to stop b. He/she intends to back up c. He/she intends to go ahead d. He/she intends to stop (emergency) - ANSWER. 265. When may blocking (cribbing) be placed under outrigger beams? a. When beams cannot be extended all the way out b. To increase capacity c. To improve stability d. Never - ANSWER. 27. What is the result of placing timber blocking under the tips of the tracks on a crawler crane? a. Decreases the permitted capacity of the crane b. Makes the crane more stable c. Reduces the capacity of the crane d. Makes the crane less stable - ANSWER-b. 28. According to ASME, what percentage of the manufacturer's crane rating must not be exceeded if a load test is done on a repaired crane? a. 110% b. 100% c. 85% d. 75% - ANSWER-. 29. Where is the tipping axis of a crawler crane located? a. It is always at the centerline of the idler or sprocket b. It depends if the idler or sprocket are in line or offset from the track rollers c. It is through the centerline of the crane cab d. It is through the boom butt section - ANSWERD. 30. What should be done with materials placed under overhead energized power lines? a. Be dragged out b. Be lifted as normal c. Not be lifted by crane b. It decreases by a third c. It remains the same d. It decreases by half- ANSWERa. 35. When may a swivel be used with rotation resistant wire rope? a. Always b. Nover c. If the rope manufacturer approves d. Ifthe operator decides it’s OK - ANSWER-c. 36. Whal should you do on pick and carry operations? a. Keep the boom as short as possible b. Keep the load as high above the ground as possible c. Ensure the load is as far from the carrier/carbody as possible d. Use maximum boom length- ANSWER-a. 37. What boom position would cause the greatest ground pressure when lifting with crawler cranes? a. Over the right side b. Over the end ¢. Over the corner d. over the left side - ANSWER-c. 38. Where should the hook be positioned when preparing to hoist a light load? a. Slightly to the side you're planning to swing to b. Slightly to the side opposite you plan to swing to c. Directly above the load’s center of gravity d. Above the edge of the load closest to the crane - ANSWER-c. 39. According to OSHA 1926.1408, what minimum clearance must be maintained between any part of the crane/load and 850kV energized overhead power Lines. a. 25 ft. b. 30 ft. o. 35 ft. d. 45 fl. - ANSWER-d. 40. How many parts of line are required to hoist a 36,390 lb. load if the maximum allowable line pull is $000 Ib.? a3 b.4 colar) d.6- ANSWER-c. Al. What determines the amount of deduction required for an erected jib that is not being used? a. The actual weight of the jib b. The effective weight of the jib c. Nothing, since the jib is not in use d. The difference between the crane’s actual weight and its effective weight - ANSWER-b. 46. What should an operator do ifa crane’s load moment indicator (LMI) malfunctions? a. Cease crane operations and report the condition to the supervisor b. Turn it off and continue as if the LMI were not installed c. Make mathematical allowances for any error d. Attempt to repair the fault - ANSWER. 1. Where must the operator’s manual be kept during crane operations? a. The operalor’s manual must be kept in a location thal is readily available b. The operator’s manual must be kept in the cab at all times c¢. The operator’s manual must be kept in the dispatch office d. The operator's manual must be kept in a secure place - ANSWER-b. 2. According to ASME B30.5, what are the minimal requirements to meet crane operator qualifications? a. Higk ool Diploma b. CDL with on the job training c. Physical, Written Test, Practical Tost d. CDL physical, employers written permission- ANSWER-c. 3. What hand signal must. be obeyed at all times? a. Swing b. Clog-everything c. Stop d. Hoist Slow - ANSWER-c. 4, When removing pins or bolts from a boom assembly, workers shall remain a. clear of sledge hammers b. out from under the boom ¢. on top of boom holding pendants d. in sight of the operator - ANSWER-b. 5. When may a crane be overloaded? a. When the supervisor says it's OK b. Never c. When testing the crane d. When proof testing a man basket - ANSWER-c. 6. When can the operator leave the crane? a. Broak time b. End of the shift c. After securing Lhe cranc d. When a storm is coming - ANSWER-b. 7. When can a crane be side loaded? a. Dragging a load b. With a freely suspended load c. Never d Unloading trucks - ANSWER. 12. When doing cycle work, the load chart must be reduced by how much? a. 30% b. 20% ©. 30% d. none - ANSWER-b. 13. Which components are not parts of the boom? a. Lacing b. Cords c. Cross members d. Heel pins - ANSWER-d. Where must the operator's manual be kept during crane operations? - ANSWER-The operator's manual must be kept in the cab at all times. According to ASME B30.5, what are the minimal requirements to meet crane operatorqualifications? - ANSWER-Physical, Written Test, Practical Test What hand signal must be obeyed at all times?- ANSWER-Stop When removing pins or bolts from a boom assembly, workers shall remain - ANSWER-out from undor the boom When may a crane be overloaded? - ANSWERNever When can the operator leave the crane? - ANS WER-After securing the crane When can a crane be side loaded? - ANSWER-With a freely suspended load The deflection of a boom will cause the load to .- ANSWER- increase the radius When should tag lines be used? - ANSWER When the rotation of the load becomes hazardous What shall be in the operator's cab during crane operations? - ANSWER-Load charts Which of the following is considered duty-cycle work? - ANSWER-Clam-shell digging When doing duty cycle work, the load chart must be reduced by how much?- ANSWER20% Which components are not parts of the boom? - ANSWER-Heel pins The boom angle is the angle between .- ANSWER+the ground and centerline of the boom, betv n sheaves and heel pins Three short audible signals mean - ANSWEI-back-up According to ANSI B30.3, hand signal chart shall be posted where? - ANSWEF-On the Job site A multi crane lift shall require - ANSWERCritical lift plan, reduction of gross capacity by 23% and one designated person in charge. When doing a pick and carry, tire pressure must - ANSWER-meet manufacturer's specifications The load chart is matched to the crane by: - ANSWER-Serial number Where do you find recommended reeving for the hoist lines? - ANSWER-Owner’s manual Not extending telescoping boom sections equally; what may occur? - ANSWER-Longer s collapse What are the broken wire removal requirements for rotation resistant wire rope? - ANSWER-2 broken wires in 6 diameters or 4 in 30 diameters How should w rope be inspected during a frequent inspection? - ANSWER-Visually What is the object of rope lubrication? - ANSWER-A and B What is the design factor for rotation resistant rope used as a hoist line? - ANSWER<:1 The load hoist drum flange shall be .- ANSWER-1/2 in. or higher over the top layer of rope With the hook in the extreme low position, how many wraps shall remain on the load hoist drum? - ANSWER-2 Load hoist sheaves and boom tip sheave shall have pitch diameters not less than times the nominal diameter of the rope used. - ANSWEF-18 Per ANSI] B30.5, when operating near high voltage line of 250 KV the minimum clearance is .- ANSWER20 FT Per ANSI B30.5, when in transit under power lines of 350 KV the minimum clearance is? - ANSWER-16 FT END.