Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - ANSWER-c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - ANSWER-a. 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump down, feet together c. Stay in the cab until the lines are de-energized d. Get as far away from the crane as possible - ANSWER-c. 4. According to OSHA 1926.1413, how many randomly distributed broken wires in rotation-resistant rope are cause for replacement of the rope?
Typology: Exams
1 / 16
This page cannot be seen from the preview
Don't miss anything!
a. 10%. b. 15%. c. 20%. d. 30%. - ANSWER-c.
b. 100% c. 85% d. 75% - ANSWER-b.
d. Attempt to repair the fault - ANSWER-a.
a. load charts b. Inspection reports c. Hand signal chart d. The crane log - ANSWER-a. 1 1. Which of the following is considered duty cycle work? a. Pile- driving b. Setting trusses c. Clam - Shell digging d Unloading trucks - ANSWER-c.
What hand signal must be obeyed at all times? - ANSWER-Stop When removing pins or bolts from a boom assembly, workers shall remain _________________. - ANSWER-out from under the boom When may a crane be overloaded? - ANSWER-Never When can the operator leave the crane? - ANSWER-After securing the crane When can a crane be side loaded? - ANSWER-With a freely suspended load The deflection of a boom will cause the load to __________________________. - ANSWER-increase the radius When should tag lines be used? - ANSWER-When the rotation of the load becomes hazardous What shall be in the operator's cab during crane operations? - ANSWER-Load charts Which of the following is considered duty-cycle work? - ANSWER-Clam-shell digging When doing duty cycle work, the load chart must be reduced by how much? - ANSWER-20% Which components are not parts of the boom? - ANSWER-Heel pins The boom angle is the angle between ___________________. - ANSWER-the ground and centerline of the boom, between sheaves and heel pins Three short audible signals mean - ANSWER-back-up According to ANSI B30.5, hand signal chart shall be posted where? - ANSWER-On the job site
Where do you find recommended reeving for the hoist lines? - ANSWER-Owner's manual Not extending telescoping boom sections equally; what may occur? - ANSWER-Longer section collapse What are the broken wire removal requirements for rotation resistant wire rope? - ANSWER-2 broken wires in 6 diameters or 4 in 30 diameters How should wire rope be inspected during a frequent inspection? - ANSWER-Visually What is the object of rope lubrication? - ANSWER-A and B What is the design factor for rotation resistant rope used as a hoist line? - ANSWER-5: The load hoist drum flange shall be _________________. - ANSWER-1/2 in. or higher over the top layer of rope With the hook in the extreme low position, how many wraps shall remain on the load hoist drum? - ANSWER- 2 Load hoist sheaves and boom tip sheave shall have pitch diameters not less than times the nominal diameter of the rope used. - ANSWER- 18 Per ANSI B30.5, when operating near high voltage line of 250 KV the minimum clearance is ___________________. - ANSWER-20 FT Per ANSI B30.5, when in transit under power lines of 350 KV the minimum clearance is? - ANSWER-16 FT