Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - โโc. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - โโa. 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump down, feet together c. Stay in the cab until the lines are de-energized d. Get as far away from the crane as possible - โโc. 4. According to OSHA 1926.1413, how many randomly distributed broken wires in rotation-resistant rope are cause for replacement of the rope? a. 1 broken wire in 6 rope diameters
Typology: Exams
1 / 16
This page cannot be seen from the preview
Don't miss anything!
d. 2 broken wires in 6 rope diameters - โโd.
a. 10%. b. 15%. c. 20%. d. 30%. - โโc.
a. 1910. b. 1926. c. 1926. d. 1910.184 - โโb.
b. When the load to be lifted exceeds the capacity in the chart c. Never d. During assembly/disassembly operations - โโd.
a. High School Diploma b. CDL with on the job training c. Physical, Written Test, Practical Test d. CDL physical, employers written permission - โโc.
a. 50% b. 20% c. 30% d. none - โโb.
What shall be in the operator's cab during crane operations? - โโLoad charts Which of the following is considered duty-cycle work? - โโClam-shell digging When doing duty cycle work, the load chart must be reduced by how much? - โโ20% Which components are not parts of the boom? - โโHeel pins The boom angle is the angle between ___________________. - โโthe ground and centerline of the boom, between sheaves and heel pins Three short audible signals mean - โโback-up According to ANSI B30.5, hand signal chart shall be posted where? - โโOn the job site A signal person shall be ________________. - โโdesignated person, tested An anti-two-block device can be used _________________. - โโto test the LMI Cranes should be load tested when? - โโAfter modifications Upon completion of assembly of the crane, what must be done? - โโAn inspection to ensure that manufacturer specifications are met During crane assembly, the counter weight should be installed when? - โโBefore raising the boom A long boom crane at a short radius and out of level by 300 can see a reduction incapacity by as much as:
With the hook in the extreme low position, how many wraps shall remain on the load hoist drum? - โโ 2 Load hoist sheaves and boom tip sheave shall have pitch diameters not less than times the nominal diameter of the rope used. - โโ 18 Per ANSI B30.5, when operating near high voltage line of 250 KV the minimum clearance is ___________________. - โโ20 FT Per ANSI B30.5, when in transit under power lines of 350 KV the minimum clearance is? - โโ16 FT