Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Optimizing Manufacturing Plant Layout, Summaries of Environmental Law

A proposed updated layout for a manufacturing plant, including key areas such as the main entrance, belt grinding area, drill machine area, cutting area, buffing and finishing, and inspection area. The layout also includes furnaces, control panels, hydraulic die holding machines, power packs, and cooling units. Detailed dimensions and measurements, as well as information on the total string mapping length, free space, and area recovered. This layout optimization plan aims to improve the efficiency and organization of the manufacturing processes within the plant, ensuring a more streamlined and productive workflow.

Typology: Summaries

2022/2023

Uploaded on 08/04/2023

pradnesh-kakade
pradnesh-kakade 🇮🇳

1 document

1 / 1

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
MATERIAL
STORAGE
AREA
Main Entrance
- BELT GRINDING AREA
- DRILL MACHINE AREA
- CUTTING AREA
- BUFFING & FINISHING
- INSPECTION AREA
SHUTTER
Entrance
SHUTTER
SHUTTER
SHUTTER
FURNACE 01 FURNACE 02
CONTROL
PANEL
- BENCH GRINDER AREA
2.8
5.4
2.6
5.25
30
10
PROPOSE (NEW UPDATED) PLANT LAYOUT ALL DIMENSIONS ARE IN METER.
HYDRAULIC DIE HOLDING M/C
HYDRAULIC
DIE
HOLDING
M/C
POWER
PACK
9.7
3
STRING MAPPING LENGTH: 52.30M
FREE SPACE : 187.23 SQ.M
2.5
1.5
1.81.8
3.1
1
2.8
1.9
AREA RECOVERED : 49.66 SQ.M
POWER
PACK
COOLING
UNIT
COOLING
UNIT
TOOL RACK
TOOL RACK

Partial preview of the text

Download Optimizing Manufacturing Plant Layout and more Summaries Environmental Law in PDF only on Docsity!

AREA STORAGEMATERIAL

Main Entrance

BELT GRINDING AREA

DRILL MACHINE AREA

CUTTING AREA

BUFFING & FINISHING

INSPECTION AREA

SHUTTER

Entrance

SHUTTER

SHUTTER

SHUTTER

FURNACE 01 FURNACE 02 PANEL CONTROL

BENCH GRINDER AREA

PROPOSE (NEW UPDATED) PLANT LAYOUT

ALL DIMENSIONS ARE IN METER. HYDRAULIC DIE HOLDING M/C HYDRAULIC DIE HOLDING M/C POWER PACK

FREE SPACE : 187.23 SQ.M^ STRING MAPPING LENGTH: 52.30M

AREA RECOVERED : 49.66 SQ.M

POWER PACK UNIT COOLING UNIT COOLING TOOL RACK TOOL RACK