Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
This project is done by me during my time as an intern with Mahindra and Mahindra. The purpose of this project was to achieve a perfect customer satisfaction level by delivering a flawless product.
Typology: Study Guides, Projects, Research
Uploaded on 07/30/2019
3 documents
1 / 33
This page cannot be seen from the preview
Don't miss anything!
By : A. Vikramaditya
PROJECT
Current Status: Closed
OBJECTIVES OF THE WORK:-
Achieving Complete Rework of A-Pillars in XUV-300 at plot 201 before the
launch and dispatch of the vehicle to the customer/dealer end.
This project is done with different quality tools like Histograms ,
Root cause analysis and a detailed analogy of how they overcome
such issues from an industrial point of view this includes
identifying a problem to eliminating it in the production process.
Another aspect of this project is to achieve a perfect customer
satisfaction level by delivering a flawless product.
Problem Selection guideline
check whether the Identified issue is significant.
It can be either to solve an existing pain area or for a new gain. It can fall under any
of the following criteria :
WHY THESE ISSUES WERE
CONSIDERED MAJOR?
A-pillar
due to which it had to be labeled under ICA
1293 vehicles, considering the amount of time and the
organization reputation at stake this had to be eliminated asap
Sash damage
rate was steadily increasing
site vendor workshop to resolve this issue, as in this
plant free space is an important aspect, we tried to
eliminate the problem such that there was no need
for an on-site work area
Sector Level Goal
We will have to enhance
Mahindra promise through
it’s crusade of delivering
first time and every thing
right products and
differentiated customer
experience
Nashik Plant
Xuv 300
Elimination of
A- Pillar rework
in Xuv 300
Xuv 300
Reduction of
dents and
damages
OVERVIEW OF XUV -
*note – this is for the diesel variant
REWORK OF A-PILLAR
Flow Chart
Observation of Process (Internal )
Understanding the current situation
Inference from above data analysis—
1.No possibility at M&M to pass vehicle having pillar pop out at CAI as in CAI every
vehicle is checked.
A-Pillar application
A-pillar assy at line vechicle audit at CAI
(customer
acceptance
inspection)
Pillar checking at
Audit at RFI
( Ready for
inspection)
Vehicle send to
yard
Popping of pillar detected
in Yard
Check point
in plant
IMPORTANCE OF THIS PROJECT
hand
considering the time on hand
XUV-500 at a lower price point still offering the feel of an SUV
3,25,000 inr/-
reviews over the vehicle
resolving different concerns of the same vehicle due to the Ramp up in production of the
vehicle, this ramp up gave raise to other unintended problems which were to be solved to
ensure a smooth production of the vehicle.
WHY WAS THIS CONCERN
CRITICAL?
70.78%
14.29%
4.55%
7.79%
1.30%1.30%
A Pillar pop out Dent's and damages
Owners manual missing Minor reworks
battery discharge Door auto locked
Highest
severity
When a pie chart was
made at the time of
initial spotting of the
problem it was
observed that this had
the most number of
occurrences , the
percentage was so
huge that it was almost
present in every other
vehicle which was
rolled off into the yard
and also it is to be seen
that the percentage
take on this single
problem was three
times as big as others
PROCESS FLOW OF THE
VEHICLE STORAGE
Roll out
Activities
Quality
checks
PDI ( pre
dispatch
inspection)
Loading
Transportatio
n to port
Unloading at
port
Storage at
port
Drive to
vessel side
Process from
left to right
Plant
Responsibilities Activities
100
140
180
220
260
300
340
380
420
460
500
540
580
620
660
700
Month
Present Level:
Rework of all the new Xuv’s at plot 201
Identify the target - target is a number indicating the level of improvement to be achieved.
Target :^ 100% Elimination by Feb end
TARGET 100%
Elimination
A pillar pop out
Man Machine
Method Material
No being aware of the issue
at the given time period
Melting of 3M tape when exposed to heat
collapse of
mating parts
No step for
application of the
glue onto the
pillar before
mounting it
Weak adhesive
agent