Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Proprac Exam 1 | 45 Questions with 100% Correct Answers | Verified you are a licensed architect and you design a 1,000 sf chicken coop for your friend's farm. you do not seal the drawings and specifications before a contractor builds it. (Pick all that Apply) A. ETHICAL
Typology: Exams
1 / 9
This page cannot be seen from the preview
Don't miss anything!
you are a licensed architect and you design a 1,000 sf chicken coop for your friend's farm. you do not seal the drawings and specifications before a contractor builds it. (Pick all that Apply)
A. ETHICAL
B. UNETHICAL
C. AIA Code of Ethics, Rule 4.
D. NCARB Model Rules of Conduct, Rule 1.
E. NCARB Model Rules of Conduct, Rule 5.
F. NYS Rules of the Board of Regents, Section 29.3(a)(4)
G. NYS Education Law Article 147, Section 7307(5)(a)
H. NYS Education Law Article 147, Section 7302 - Answer ✔️ ✔️ -A. ETHICAL
G. NYS Education Law Article 147, Section 7307(5)(a)
similar to ethical situation #1, you pursue a new medical lab project and you don't have any experience doing labs but you have done other projects for this client. you bring on a consultant who specializes in laboratories and disclose this consultant, their role and experience as an integral part of the team to get the job. (Pick all that Apply)
A. NCARB Model Rules of Conduct, Rule 1.
B. AIA Code of Ethics, Rule 3.
C. NCARB Model Rules of Conduct, Rule 3.
D. AIA Code of Ethics, Rule 3.
F. AIA Code of Ethics, Rule 4.
G. NCARB Model Rules of Conduct, Rule 4.
H. AIA Code of Ethics, Rule 2.
I. NYS Education Law Article 147, Section 7307(2)
J. UNETHICAL
K. NYS Rules of the Board of Regents, Section 29.3(b)(1) - Answer ✔️ ✔️ -A, B, E, K
you are a licensed architect. you have a friend who went to architecture school with you and graduated but never got licensed. she developed drawings for a student housing project and just needs you to stamp the drawings so that she can get paid. since she was a top student and one of your best friends, you know her work must be good and code compliant so you agree to stamp the drawings without any review. (Pick all that Apply)
A. AIA Code of Ethics, Rule 4.
B. NYS Rules of the Board of Regents, Section 29.3(a)(3)
C. NYS Education Law Article 147, Section 7307(5)(b)
D. ETHICAL
E. AIA Code of Ethics, Rule 5.
F. NCARB Model Rules of Conduct, Rule 5.
G. NYS Rules of the Board of Regents, Section 29.3(b)(2)
H. UNETHICAL
I. NYS Education Law Article 147, Section 7307(1)
J. NCARB Model Rules of Conduct, Rule 3.7 - Answer ✔️ ✔️ -A, B, F, H,
you pursue a new medical lab project and you don't have any experience doing labs but you have done many other projects for this client. you used to have a partner that was an expert in labs
C. NCARB Model Rules of Conduct, Rule 5.
D. NCARB Model Rules of Conduct, Rule 2.
E. NCARB Model Rules of Conduct, Rule 3.
F. NYS Rules of the Board of Regents, Section 29.3(a)(6)
G. NYS Rules of the Board of Regents, Section 29.1(b)(12)(i)(a)
H. NCARB Model Rules of Conduct, Rule 3.
I. NCARB Mode - Answer ✔️ ✔️ -A, H, K, L, N
Common Ethics Violations Include:
A. Attribution of Credit
B. Accurate Representations of Qualifications
C. Attainment of Work Samples
D. Basic Honesty
E. All of the Above
F. B & C Above - Answer ✔️ ✔️ -E. All of the above
In the United States, the basis for the regulation of the practice of architecture is the _______ Amendment of the Constitution known as the "States Rights" provision:
A. 8th
B. 2nd
C. 13th
D. 10th
E. 7th
F. 18th - Answer ✔️ ✔️ -D. 10 th
In the AIA Code of Ethics, under what Canon would you find the rule governing accepting payments or gifts to influence judgement: - Answer ✔️ ✔️ -Canon II
Which of the following is not one of the categories in the NCARB Model Rules of Conduct: - Answer ✔️ ✔️ -Continuing Education
Architects can be held liable for negligent acts, errors and omissions against those whom they do not have a contractual arrangement with. This is known as: - Answer ✔️ ✔️ -Third Party Liability
Which of the following is a typical characteristic of a sole proprietorship: - Answer ✔️ ✔️ -B. Can be set up without a formal legal agreement
and
E. Ends with the death or retirement of the founder
Legal obligations based on precedents and decisions of courts is known as obligation by: - Answer ✔️ ✔️ -Common Law
Joint and Several Liability is a characteristic of: - Answer ✔️ ✔️ -A partnership
In a suit against an architect for professional negligence the suing party must prove: - Answer ✔️ ✔️ - Duty, Breach, Cause, and Damage
You were the principal designer for ABC Architects, P.C. on a well-known project and then recognized on the cover of a prestigious architectural magazine for the completed work. Several years later, you leave ABC to start your own firm STARchitects, LLP. In accordance with the AIA Code of Ethics and AIA Guidelines for the Attribution of Credit, you may NOT use images of the project at your new firm as if your new firm did the work even though it is well known and publicly documented that you personally were the principal designer.
T/F? - Answer ✔️ ✔️ -True
As discussed in class, the concept of a Corporation as an entity has been around: - Answer ✔️ ✔️ - For over 2,500 years
According to op.nysed.gov, allowable NEW corporate entities for architectural practice in New York State include: - Answer ✔️ ✔️ -Design Professional Service Corporation (DPC), Professional Service Corporation (PC),
A form of Security that guarantees a bidder will enter into an agreement with the owner if the bid is accepted within a certain time frame from the bid opening is known as: - Answer ✔️ ✔️ -Bid Bond
While each project is unique, what is the typical time required for the construction documents phase of a project: - Answer ✔️ ✔️ - 3 - 8 Months
Which following fee, that Clients are often uncomfortable with, can be considered the fairest for the architect as there is little chance of a large loss and it forces the Client to value the architect's time: - Answer ✔️ ✔️ -Hourly With a cap
The specific time when a project has progressed to the point where an owner can use or occupy the work for its intended purpose is known as: - Answer ✔️ ✔️ -Substantial Completion
What are factors affecting the scope of services - Answer ✔️ ✔️ -a. Level of risk associated with the services
B. Project budget
C. Regulatory requirements
D. Project schedule
E. Required use of building information models
F. Programmatic requirements
G. Client goals, expectations and values
H. Method of construction procurement
Which of the following are considered additional services in the AIA B101 Standard Form of Agreement Between Owner and Architect - Answer ✔️ ✔️ -Leed Certification, Reviewing out of sequence submittals, Site Evaluation and planning
The Architect can stop the work of the construction contractor on a project that the Architect designed: T/F? - Answer ✔️ ✔️ -False
Which of the following is NOT part of the Architect's construction phase activities - Answer ✔️ ✔️ - Complete Punch List items
In which specification section of the construction documents would you find asphalt shingles - Answer ✔️ ✔️ - 073113 (CH 7.2, p 369 )
Which of the following is not one of the five generally established phases of the AIA owner architect agreements - Answer ✔️ ✔️ -Preliminary Design
Chapter 7.1, p.
According to textbook author Paul Segal, FAIA, the most important marketing tool is - Answer ✔️ ✔️ - Satisfied Clients
When Defining project services scope includes - Answer ✔️ ✔️ -Client expectations, goals and values
Budget
Team
Schedule
Method of construction procurement
How much time does the average reviewer spend reading an architect's proposal - Answer ✔️ ✔️ - 18 minutes
The process of bringing new business to a firm in order to sustain and grow the practice is known as: - Answer ✔️ ✔️ -Marketing
According to the AIA B101-2017 standard form of agreement between Owner and the Architect When bids for a project come in over budget, the Owner has the following options: - Answer ✔️ ✔️ - Increase the budget, kill the project, re-bid or re-negotiate the project