



Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
QISP Introduction Comprehensive Exam 2025
Typology: Exams
1 / 5
This page cannot be seen from the preview
Don't miss anything!
In order to obtain NOI coverage under the IGP, PRDs include: - correct answers ✔✔NOI and electronic certification by the LRP Permit registration fee Site Map SWPPP If the discharger must redact information in order to comply with federal law that addresses security in the US, the discharger must also submit - correct answers ✔✔A written justification that the information redaction is necessary to comply with federal law What are three reasons for a discharger submitting an NOT in SMARTs? - correct answers ✔✔- the facilities' industrial operations have changed and are no longer subject to the IGP
stream, debris piles, boulder fields, or a stream that flows underground) so long as a bed and banks and an ordinary high water mark can be identified upstream of the break Level 2 ERA Technical Reports and Level 2 ERA Action plans must be prepared by and certified and submitted via whom? - correct answers ✔✔Prepared by: QISP; Certified and Submitted (via SMARTS) by: LRP or DAR Authorized agencies are allowed to - correct answers ✔✔Enter upon the premises where a regulated industrial activity is being conducted If changes at a facility with NEC coverage results in exposure of industrial activities or materials, the facility is no longer eligible for NEC coverage. - correct answers ✔✔True A Duly Authorized Representative can certify and submit NOI Coverage or NEC Coverage in SMARTS. - correct answers ✔✔False; only the LRP can certify and submit the NOI/NEC IGP Status consists of baseline, Level 1, and Level 2 coverage - correct answers ✔✔True What levels of coverage require the services of a QISP? - correct answers ✔✔Level 1 and Level 2; not baseline New dischargers are required to have a QISP if they are discharging into a 303(d) impaired water body Water from fire hydrant and fire prevention or response system flushing that runs through an industrial material storage yard and discharges to a storm drain system is always an authorized Non-Storm Water Discharge under the IGP. - correct answers ✔✔False: IGP criteria requires the discharge to not be commingled with industrial activities before discharging
Non-Storm Water Discharges are not authorized if they do any of what? - correct answers ✔✔1. violate any statewide plan or Basin Plan