QMT/QSP RESPONSIBILITY TEST 2024 Q&A, Exams of Environmental Science

Evaluate change requirements from a QMT perspective (assessment of risk caused by change) and ensure M-gAMS relevance; evaluate technical cost reduction (PKR) from a QMT perspective - ANSWER QMT Responsible gAMS evaluation process: QMT budget, industrializability, timeframe -> assessment of change-related risk - ANSWER QMT Responsible Assess the first risk for components/contents and commence a review, including TOP themes. ANSWER: QMT Responsible Suppliers travel to the United States, Canada, the United Kingdom, South Africa, Latin America, Asia, and other parts of the world. - ANSWER: QMT Responsible Supplier development for first-tier suppliers in the USA, Canada, UK, South Africa, Latin America, Asia, and the rest of the world, including compliance with requirements to be satisfied by tools, facilities, and manufacturing processes throughout the build-phase - ANSWER QMT Responsible.

Typology: Exams

2024/2025

Available from 11/13/2024

tizian-kylan
tizian-kylan 🇺🇸

2.7

(21)

3.7K documents

1 / 7

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
pf3
pf4
pf5

Partial preview of the text

Download QMT/QSP RESPONSIBILITY TEST 2024 Q&A and more Exams Environmental Science in PDF only on Docsity!

QMT/QSP RESPONSIBILITY TEST

Evaluate change requirements from a QMT perspective (assessment of risk caused by change) and ensure M-gAMS relevance; evaluate technical cost reduction (PKR) from a QMT perspective - ANSWER QMT Responsible

gAMS evaluation process: QMT budget, industrializability, timeframe -> assessment of change-related risk - ANSWER QMT Responsible

Assess the first risk for components/contents and commence a review, including TOP themes. ANSWER: QMT Responsible

Suppliers travel to the United States, Canada, the United Kingdom, South Africa, Latin America, Asia, and other parts of the world. - ANSWER: QMT Responsible

Supplier development for first-tier suppliers in the USA, Canada, UK, South Africa, Latin America, Asia, and the rest of the world, including compliance with requirements to be satisfied by tools, facilities, and manufacturing processes throughout the build-phase - ANSWER QMT Responsible.

Maintain project deadlines and information in the system (ANSWER QMT Responsible)

Prepare a maturity level schedule, and perform and document maturity level management in iPQ (or RGA in RMT). ANSWER QMT Responsible.

Monitoring the supplier's tool status and approval, including grain finish - ANSWER QMT Responsible

Request for tool management assistance (filed by committee (IK), rather than by an individual group). - ANSWER: QMT Responsible

ANSWER QMT Responsible for selecting appropriate measurement equipment and ensuring timely availability at vendors.

Define and coordinate measures from the measuring plan in the SE team with scheduling (ANSWER QMT Responsible)

Ensure the availability of the measurement plan by the deadline. - ANSWER: QMT Responsible

Verification of part availability from series tooling for the scheduled test cubing deadline from the PC daily schedule- ANSWER QMT Responsible

Verification of the completion of the prerequisites for cubing - ANSWER QMT Responsible

Safeguard and analyze outcomes in connection to the build process (derive actions as needed). - ANSWER: QMT Responsible

Ensure part provision for the BMW grain process (Grain and Color Day) - ANSWER QMT Responsible

Incoming goods inspection planning/testing schedule--ANSWER QMT Responsible

Check the supplier's premises for crucial / JIT/ JIS items prior to the build phases - ANSWER QMT Responsible

Participation in Grain and Color Day: ANSWER QMT Responsible

Define and monitor measures, ANSWER QMT Responsible / QSP Support.

Checking the packaging concept and reconciling with LeLe and PQM - ANSWER QMT Responsible / QSP Support.

Evaluate conventional packing. (approval is the responsibility of the logistical department). - ANSWER: QMT Responsible/QSP Support

Build-phases research and development center - Asia supplier: Participation in the build process (exceptions are stated in the commodity), communication of conclusions, definition and execution of actions - ANSWER QMT Responsible / QSP Support.

International plant build stages (PVL, VS, AP, SVL, etc.): involvement in the build phase, define and follow up on QMT actions (test report processing by the QMT plant frontdesk staff). - ANSWER: QMT Responsible/QSP Support

Sampling planning and implementation, such as part appraisal, installation testing, and logistical data verification. - ANSWER: QMT Responsible/QSP Support

Supplier Performance Reviews (SPR): ANSWER QMT Responsible / QSP Support

Actions for Validating Phase-Out Planning for Production Parts with Suppliers - ANSWER QMT Responsible/QSP Support

Validation of Spare Part Demand - ANSWER QMT Responsible/QSP Support

Problem-solving and prevention teams (early phases) - ANSWER: QMT Responsible/QSP Support

ANSWER QSP Responsible for inspecting incoming goods with AI and drawing index at the facility (quarantine storage, test zone).

Planning and budgeting (included in project evaluation). - ANSWER QSP Responsible

Purchase order: ANSWER QSP Responsible

ANSWER QSP is responsible for installing and maintaining internal test equipment.

ANSWER QSP Responsible for defective part procedure, test reports, and the necessity for 8 D/ 4D reports.

Coordination and accountability for meeting internal quality objectives (e.g., QZS, QZF, DLQ, NA) - ANSWER QSP Responsible

Control the phase-out planning for production parts. - ANSWER QSP Responsible