



Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Evaluate change requirements from a QMT perspective (assessment of risk caused by change) and ensure M-gAMS relevance; evaluate technical cost reduction (PKR) from a QMT perspective - ANSWER QMT Responsible gAMS evaluation process: QMT budget, industrializability, timeframe -> assessment of change-related risk - ANSWER QMT Responsible Assess the first risk for components/contents and commence a review, including TOP themes. ANSWER: QMT Responsible Suppliers travel to the United States, Canada, the United Kingdom, South Africa, Latin America, Asia, and other parts of the world. - ANSWER: QMT Responsible Supplier development for first-tier suppliers in the USA, Canada, UK, South Africa, Latin America, Asia, and the rest of the world, including compliance with requirements to be satisfied by tools, facilities, and manufacturing processes throughout the build-phase - ANSWER QMT Responsible.
Typology: Exams
1 / 7
This page cannot be seen from the preview
Don't miss anything!
Evaluate change requirements from a QMT perspective (assessment of risk caused by change) and ensure M-gAMS relevance; evaluate technical cost reduction (PKR) from a QMT perspective - ANSWER QMT Responsible
gAMS evaluation process: QMT budget, industrializability, timeframe -> assessment of change-related risk - ANSWER QMT Responsible
Assess the first risk for components/contents and commence a review, including TOP themes. ANSWER: QMT Responsible
Suppliers travel to the United States, Canada, the United Kingdom, South Africa, Latin America, Asia, and other parts of the world. - ANSWER: QMT Responsible
Supplier development for first-tier suppliers in the USA, Canada, UK, South Africa, Latin America, Asia, and the rest of the world, including compliance with requirements to be satisfied by tools, facilities, and manufacturing processes throughout the build-phase - ANSWER QMT Responsible.
Maintain project deadlines and information in the system (ANSWER QMT Responsible)
Prepare a maturity level schedule, and perform and document maturity level management in iPQ (or RGA in RMT). ANSWER QMT Responsible.
Monitoring the supplier's tool status and approval, including grain finish - ANSWER QMT Responsible
Request for tool management assistance (filed by committee (IK), rather than by an individual group). - ANSWER: QMT Responsible
ANSWER QMT Responsible for selecting appropriate measurement equipment and ensuring timely availability at vendors.
Define and coordinate measures from the measuring plan in the SE team with scheduling (ANSWER QMT Responsible)
Ensure the availability of the measurement plan by the deadline. - ANSWER: QMT Responsible
Verification of part availability from series tooling for the scheduled test cubing deadline from the PC daily schedule- ANSWER QMT Responsible
Verification of the completion of the prerequisites for cubing - ANSWER QMT Responsible
Safeguard and analyze outcomes in connection to the build process (derive actions as needed). - ANSWER: QMT Responsible
Ensure part provision for the BMW grain process (Grain and Color Day) - ANSWER QMT Responsible
Incoming goods inspection planning/testing schedule--ANSWER QMT Responsible
Check the supplier's premises for crucial / JIT/ JIS items prior to the build phases - ANSWER QMT Responsible
Participation in Grain and Color Day: ANSWER QMT Responsible
Define and monitor measures, ANSWER QMT Responsible / QSP Support.
Checking the packaging concept and reconciling with LeLe and PQM - ANSWER QMT Responsible / QSP Support.
Evaluate conventional packing. (approval is the responsibility of the logistical department). - ANSWER: QMT Responsible/QSP Support
Build-phases research and development center - Asia supplier: Participation in the build process (exceptions are stated in the commodity), communication of conclusions, definition and execution of actions - ANSWER QMT Responsible / QSP Support.
International plant build stages (PVL, VS, AP, SVL, etc.): involvement in the build phase, define and follow up on QMT actions (test report processing by the QMT plant frontdesk staff). - ANSWER: QMT Responsible/QSP Support
Sampling planning and implementation, such as part appraisal, installation testing, and logistical data verification. - ANSWER: QMT Responsible/QSP Support
Supplier Performance Reviews (SPR): ANSWER QMT Responsible / QSP Support
Actions for Validating Phase-Out Planning for Production Parts with Suppliers - ANSWER QMT Responsible/QSP Support
Validation of Spare Part Demand - ANSWER QMT Responsible/QSP Support
Problem-solving and prevention teams (early phases) - ANSWER: QMT Responsible/QSP Support
ANSWER QSP Responsible for inspecting incoming goods with AI and drawing index at the facility (quarantine storage, test zone).
Planning and budgeting (included in project evaluation). - ANSWER QSP Responsible
Purchase order: ANSWER QSP Responsible
ANSWER QSP is responsible for installing and maintaining internal test equipment.
ANSWER QSP Responsible for defective part procedure, test reports, and the necessity for 8 D/ 4D reports.
Coordination and accountability for meeting internal quality objectives (e.g., QZS, QZF, DLQ, NA) - ANSWER QSP Responsible
Control the phase-out planning for production parts. - ANSWER QSP Responsible