Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A comprehensive set of questions and answers related to the qualified swppp practitioner (qsp) exam, covering key aspects of stormwater management. It delves into topics such as the clean water act (cwa), erosion control, sediment control, and the revised universal soil loss equation (rusle). Designed to help students and professionals prepare for the qsp exam and gain a deeper understanding of stormwater management principles and practices.
Typology: Exams
1 / 14
This page cannot be seen from the preview
Don't miss anything!
When does the CGP apply? Any construction or demolition of one acre or more Activities under the CGP include: a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. b. Disturbances to land surfaces solely related to agricultural operations. c. Clearing and grading 2 acres of land d. Discharges of storm water from areas on tribal lands. C TRUE OR FALSE: if construction of an LUP will occur across several properties, the utility company, municipality, or other public/private company/agency that owns or operates the LUP project is responsible for obtaining coverage True Risk Level 2 monitoring requirements include: a. Effluent sampling where applicable b. Sampling for pH and turbidity c. Sampling for pH, turbidity, and suspended sediments B
All NAL data must be uploaded within ___ after NAL exceedance has been identified a. 24 hours b. 1 week c. 10 days d. 2 weeks C Who must file Permit Registration Documents (PRDs) prior to the commencement of construction activity? a. Qualified SWPPP Developer (QSD) b. Legally Responsible Person (LRP) or the LRP's Approved Signatory c. Qualified SWPPP Practitioner (QSP) d. The CEO B Which regulation establishes a framework for regulating municipal and industrial storm water discharges to waters of the United States: Clean Water Act (CWA) b. Porter-Cologne Water Quality Control Act c. Endangered Species Act d. U.S. Environmental Protection Agency (USEPA) e. California Environmental Quality Act (CEQA) A
d. Sediment Yield D What is turbidity? The degree to which the water loses its transparency due to the presence of suspended particulates b. the acidity or alkalinity of a solution c. the degree to which a chemical substance or a particular mixture of substances can damage an organism A The removal of a uniform thin layer of soil by raindrop splash or water run-off is... a. Splash Erosion b. Rill Erosion c. Sheet Erosion d. Wind Erosion C What elements of RUSLE are independent of location? a. K b. R c. LS d. C & P D
What does the "P" stand for in the Revised Universal Soil Loss Equation (RUSLE)? a. Soil erodibility factor b. Management operations and support practices (sediment controls) c. Rainfall-runoff erosivity factor d. Length-slope factor e. Cover factor (erosion controls) B What is the difference of an LUP project in comparison to traditional projects? a. Erosion control is not needed. b. "Run-On/Run-Off" is not an objective. c. Sampling is not required. B TRUE OR FALSE: The SWPPP is a "living document" that is amended/updated to reflect conditions & reduce pollutants True Stockpiles require a linear sediment barrier at all times, and must be covered prior to a rain event or when inactive. A stockpile is inactive after __days of inactivity. a. 3 b. 7 c. 10 d. 14 D
False (Risk level 3 only) Visual monitoring is required for non-storm water, pre-rain and post-rain at what Risk Levels? a. Risk Level 1 b. Risk Level 2 c. Risk Level 3 d. All of the above e. Risk Level 1 & 2 D A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period between rain events is a/an... a. Qualifying rain event b. Extended storm event c. Inactive storm event d. Unsafe monitoring event A Upload photos to SMARTS that are taken during daily inspections of the LUP site before, during, and after every ___ storm event a. First b. Second c. Third d. Fourth C
Which statement is false? Monitoring is not required when: a. the site/sampling locations are unsafe to access due to the storm event b. it is outside of scheduled site operation hours c. the contractor elects not to work and the site is "shut down" for a rainy day C What is the Numeric Action Level (NAL) for pH? a. 3.5-5. b. 6.0-9. c. 6.5-8. d. 9.0-12. C What is the exceedance trigger for Receiving Water Monitoring? a. 100 NTU b. 250 NTU c. 500 NTU d. 1,000 NTU C What system that uses chemical coagulation, chemical flocculation, or electro-coagulation to reduce turbidity? a. ATS b. CGP c. CWA
Which statement is true? Risk Level 2 sites: a. Are subject to all Risk Level 3 requirements b. Must electronically submit all NAL exceedance storm event sampling results to State Water Board no later than 10 days after the storm event c. Have 10 categories of year-round minimum BMP's d. Do not need to manage run-on or run-off controls B The REAP must be onsite during construction and available a. for a minimum of 1 Year b. for a minimum of 3 Years c. 72 hours prior to any likely precipitation event d. Until the end of the construction project B NEL Violation Reports must be submitted to State Board within 24 hours after exceedance has been identified. NEL's are only subject to: a. Risk Level b. Risk Level 2 c. Risk Level 3 d. ATS Sites only D TRUE OR FALSE: All Annual Reports, or other information required by the General Permit (other than PRDs and NOTs) or requested by the Regional Water Board, State Water Board, U.S. EPA, or local stormwater management agency shall be certified and submitted by the QSD False (LRP or LRP's Approved Signatory)
TRUE OR FALSE:LID's goal is to mimic a site's pre-development hydrology by using design and techniques that infiltrate, store, evaporate, and detain runoff close to its source. True Hydrologic source controls are a design technique that minimize and/or slow the rate of stormwater runoff from the site. Examples include: a. Reduction of pervious surfaces b. Use of landscaping as a storm drain treatment feature c. Drain rooftop downspouts to impervious areas d. Stormwater treatment facility B TRUE OF FALSE:LUP projects are subject to post-construction requirements due to the nature of their construction to return project sites to preconstruction conditions. False Which statement is false? Bioassessment monitoring is required for projects that meet all of the following, EXCEPT: a. Rated Risk Level 3/ LUP Type 3 b. Directly discharges runoff to a freshwater wadeable stream that is sediment impaired and has beneficial uses for cold, migratory, and spawn c. Requires post-construction stormwater treatment d. Total project-related ground disturbance exceeds 30 acres C
Permit Registration Documents (PRDs) shall consist of all of the following except: a. Site Map b. Signed Certification Statement c. Risk Assessment d. Notice of Termination (NOT) e. Notice of Intent (NOI) D The FOUR phases of construction include, all of the following EXCEPT: a. Streets and Utility Phase b. Vertical Construction Phase c. Stormwater Sampling d. Grading and Land Development Phase e. Final landscaping and Site Stabilization Phase C What is an example of Housekeeping BMPs? a. Silt fence installation around the perimeter b. Waste management c. Covering inactive areas with hydroseed d. Installing fiber rolls along a slope B TRUE OR FALSE: A project may be terminated if construction activities have been suspended. True
Within ____ of when construction is complete or ownership has been transferred, the discharger shall electronically file a Notice of Termination (NOT), a final site map, and photos through the State Water Boards SMARTS system. a. 24 hours b. 3 days c. 60 days d. 90 days D TRUE OR FALSE: A project may not be terminated if the permitted construction property is sold(property ownership has been transferred) prior to project completion False Acceptable methods to demonstrate final stabilization include: a. 50%vegetative coverage b. 100% vegetative coverage c. RUSLE 2 method C TRUE OR FALSE: For purposes of "Final Stabilization", the site will not pose any additional sediment discharge risk than it did prior to the commencement of construction activity. True