Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
QSP/QSD EXAM 2025 WITH 100% ACCURATE SOLUTIONS
Typology: Exams
1 / 15
This page cannot be seen from the preview
Don't miss anything!
What 4 distinct phases of construction activities does the General Permit Recognize - correct answers ✔✔Grading and Land Development Streets and Utilities Vertical Construction Final Landscaping and site Stabilization Any construction or demolition activity, including, but not limited to, clearing, grading, grubbing, or excavation, or any other activity that results in a land DISTURBANCE of equal to or greater than ___ acre - correct answers ✔✔ 1 LUPs - correct answers ✔✔Linear Underground/Overhead Utility Projects What is the primary federal law governing storm water pollution and regulation - correct answers ✔✔Clean Water Act The person in charge of the utility company, municipality, or other public or private company or agency that owns or operates the ____ may also serve as the LRP - correct answers ✔✔LUP Visual Monitoring is required for... - correct answers ✔✔All sites subject to this General Permit Records are required to remain onsite during the construction period for a minimum of ___ - correct answers ✔✔3 Years
When does Risk Level 1 site have to sample? - correct answers ✔✔When required for non- visible pollutants When would receiving water monitoring occur? - correct answers ✔✔Effluent that exceeds the receiving water monitoring triggers contained in the GP and with direct discharges to receiving water When would bioassessment sampling take place? - correct answers ✔✔RISK level 3 and LUP Type 3 Sites larger than 30 acres and with direct discharges to receiving waters. (before and after sire completion) Where do records need to be available? - correct answers ✔✔At the construction site until construction is complete. LUPs may be retained in a crew members vehicle and made available upon request ATS - correct answers ✔✔Active Treatment Systems What do ATS do? - correct answers ✔✔Add chemicals to facilitate flocculation, coagulation and filtration of suspended sediment particles. Measured by NELs When does risk level 1 site have to sample - correct answers ✔✔When required for non-visible pollutants Which construction activity is not covered under the CGP - correct answers ✔✔Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility
Annual Fee Signed Certification Statement Small Construction Rainfall Erosivity Waiver - correct answers ✔✔Applies to sites between 1 - 5 acres demonstrating that thee are not adverse water quality impacts Discharges eligible for Rainfall Erosivity Waiver must take place during a period when the value is the rainfall erosivity factor is less than___ - correct answers ✔✔ 5 If the new R factor is 5 or above - correct answers ✔✔The LRP shall be required to apply for coverage under this order. The discharger may reduce or increase the total acreage covered under the GP when... - correct answers ✔✔A portion of the site is complete and/or conditions for termination have been met (when ownership of a portion of the site is sold to different entity or when new acreage is added to the site) Revisions to add/reduce disturbed acreage must be filed electronically within ____ - correct answers ✔✔30 Days Which of the following construction activities is not covered under the CGP: - correct answers ✔✔Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility Conditions for Termination of Coverage - correct answers ✔✔Within 90 Days when construction is complete or ownership transferred File through SMARTS
The NOT must demonstrate through... - correct answers ✔✔A. 70% final cover method B. RUSLE or RUSLE2 method - computational proof required C. Custom Method - Demonstrate in some other manner than A or B that the site complies with final stabilization Authorized non-storm water discharges may include those from____ - correct answers ✔✔Dechlorinated potable water sources such as: Fire Hydrant Flushing, Irrigation of Veg Erosion Control Measures, Pipe Flushing/Testing, Dust Control, Uncontaminated ground water from dewatering What is the CGP-approved method for pH analysis? - correct answers ✔✔Calibrated field meter Any person who violates any permit condition of the GP is subject to a civil penalty not to exceed $____ - correct answers ✔✔$37,500 per calendar year of such violation pH and Turbidity parameter for Risk Level 2 & 3 - correct answers ✔✔pH - 6.5-8. Turbidity - 250 NTU When outside the pH and Turbidity parameters the discharger shall.... - correct answers ✔✔Conduct a construction sure and run-on evaluation to determine whether pollutant source(s) associated with the site's construction activity may have caused or contributed to the NAL exceedance and implement corrective actions CASQA Stands for - correct answers ✔✔California Stormwater Quality Association
REAPS apply to - correct answers ✔✔Level 2 and 3 projects Which is not called out as a phase of development in the General Permit? - correct answers ✔✔Site Planning and Surveying Filed personal in charge of ATA operations must complete how many hours of related training? - correct answers ✔✔ 40 Which is most true about ATS - correct answers ✔✔Typically utilize sediment basins Two terms that best describe the difference between Traditional and LUP projects are - correct answers ✔✔Linear and Vertical All projects are subject to which type of monitoring - correct answers ✔✔Visual monitoring All projects are subject to monitoring for which parameters - correct answers ✔✔Non-visible pollutants CSMP and M&RP relate respectively to - correct answers ✔✔Traditional and LUP projects ATS monitoring always included all of the following except - correct answers ✔✔SSC Cable installation projects of more than 30 acres disturbed in project area or section designated as type 3 and directly discharging into receiving waters are subject to which following form of stormwater monitoring? - correct answers ✔✔Bioassessment
Dry weight of a solid material pertains to which of the following analytical parameters? - correct answers ✔✔SSC (Suspended Solids Concentration) SMARTS refers to - correct answers ✔✔A tracking system Which of the following is true? - correct answers ✔✔An LRP can submit PRDs via SMARTS A Compliance Strom Exemption may be available for what would otherwise be a - correct answers ✔✔NEL violation or RWMT Non-Stormwater reports are to be documented - correct answers ✔✔Quarterly Annual reports are due each year by - correct answers ✔✔September 1st Unless otherwise noted, SWPPP documents are to be retained for - correct answers ✔✔3 years Annual reports must contain all except - correct answers ✔✔Inspection photographs from LUP projects Which entity is tasked to obtain and retain a printed copy of forecast information from the National Weather Service? - correct answers ✔✔QSP Which of the following two factors are primary for making a risk determination - correct answers ✔✔Receiving Waters and Sediment Risk Under the CGP, a project's hydromodification requirements are superseded by - correct answers ✔✔A local SWMP
Which of the following is not a basis to demonstrate final stabilization - correct answers ✔✔% impermeability RUSLE 2 computer modeling to demonstrate final stabilization will provide estimated of soil loss in - correct answers ✔✔Tons per acre per year Historical data that can be used to demonstrate final stabilization includes - correct answers ✔✔NTU levels When must pre-rain event inspections occur? - correct answers ✔✔Within 48 hours in advance of predicted event Turbidity is measured in - correct answers ✔✔Nephelometric Units The SWPPP shall be available? - correct answers ✔✔At the project site Which two best represent an ATS "mode of operation"? - correct answers ✔✔Flow-through and Batch Treatment Do type 1 LUPs typically have a high potential to impact storm water quality? - correct answers ✔✔No The CGP follows a risk-based permitting approach. The project risk level is calculated using: - correct answers ✔✔Sediment risk and receiving water risk
For traditional construction projects the LRP may be: - correct answers ✔✔The person who possesses real property interest in the land upon which the construction activities will occur fr the regulated site. What does RUSLE stand for? - correct answers ✔✔Revised Universal Soil Loss Equation The BMP requirements for Type 2 LUPs are found in - correct answers ✔✔Attachment A You only have to cover waste containers prior and during a rain event T/F - correct answers ✔✔False (at the end of each day and during rain event) Natural products such as mulch as seed do not need to be contained on site since they are biodegradable T/F - correct answers ✔✔False The "R" factor in risk assessment will vary based on - correct answers ✔✔Project location and Project duration Which BMP category should be used as the primary line of defense for erosion preventing? - correct answers ✔✔Soil stabilization Each project utilizing ATS shall have a site-specific operation and maintenance manual (T/F) - correct answers ✔✔True Monitoring requirements for LUP and Traditional Projects are the same (T/F) - correct answers ✔✔False
Mon-visible pollutant monitoring is - correct answers ✔✔Triggered by the potential for non- visible pollutants to be discharged from any project site What is the primary storm water pollutant at a construction site? - correct answers ✔✔Sediment What is the most common pollutant in runoff from construction sites? - correct answers ✔✔Sediment What is the difference between erosion and sedimentation? - correct answers ✔✔Erosion is the dislodging and transport of soil and sedimentation is the deposition of material The CGP required the following monitoring elements for all risk levels - correct answers ✔✔Visual monitoring and monitoring of non-visible pollutants, as needed Bioassessment monitoring is an assessment of - correct answers ✔✔Measure of the number and diversity of benthic macroinvertebrates in a water body Continuous monitoring (no less than 15-minute intervals) of ATS is required for - correct answers ✔✔Flow and Turbidity Examples of erosion control - correct answers ✔✔Protective blankets, wildflowers, and straw In the RUSLE equation, "P" stands for - correct answers ✔✔Management operations and support practices Quarterly non-storm water discharge monitoring inspections are not required for - correct answers ✔✔Linear Underground/Overhead Projects (LUP) sites
Are sediment control BMPs a primary or secondary means of preventing storm water contamination? - correct answers ✔✔Secondary When are erosion and sediment controls required? - correct answers ✔✔When rain is forecasted at 50% or greater During the wet/dry season SWAMP stands for - correct answers ✔✔Surface Water Ambient Monitoring Program What factors are used for RUSLE - correct answers ✔✔R,K, LS, C, P For each day of discharge from a qualifying event, the absolute minimum number of pH or turbidity effluent samples is - correct answers ✔✔Three RUSLE is an estimation of - correct answers ✔✔Soil loss All PDRs must be certified by _____ - correct answers ✔✔The LRP or legally authorized approved signatory What does NPDES stand for? - correct answers ✔✔National Pollutant Discharge Elimination System Which factor(s) of RUSLE must be changed to recalculate risk when the construction duration has changed? - correct answers ✔✔R