relacion de insumos escalinatas, Exercises of Journalism

relacion de insumos escalinatas

Typology: Exercises

2022/2023

Uploaded on 08/12/2024

cristian-huaman-laurente-1
cristian-huaman-laurente-1 🇺🇸

8 documents

1 / 1

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
1
Página :
S10
Precios y cantidades de recursos requeridos
Obra CONSTRUCCION, TRATAMIENTO PAISAJISTICO DEL PARQUE PRINCIPAL Y ESCALINATAS DEL
C.P. PISCURRURAY
1203001
01/04/2014
Fecha
JUNIN - JUNIN - ULCUMAYO
Lugar
120504
Cantidad
Unidad
Recurso
Código
Precio S/.
Parcial S/.
MANO DE OBRA
1,815.15
10.20
OPERARIO
0101010003
hh
105.56
9.00
OFICIAL
0101010004
hh
3,002.87
7.00
PEON
0101010005
hh
42.88
6.50
OPERARIO TOPOGRAFO
01010300000005
hh
4,966.46
MATERIALES
89.16
14.00
PETROLEO D-2
0201040001
gal
485.34
5.00
ALAMBRE NEGRO RECOCIDO N° 8
02040100010001
kg
2.11
4.20
ALAMBRE NEGRO RECOCIDO N° 16
02040100010002
kg
74.23
4.30
ACERO CORRUGADO fy = 4200 kg/cm2
GRADO 60
0204030001
kg
64.89
5.00
CLAVOS PARA MADERA CON CABEZA
DE 3"
02041200010005
kg
857.61
65.00
PIEDRA CHANCADA 1/2"
02070100010002
m3
111.08
60.50
PIEDRA DE CANTO RODADO
0207010007
m3
442.89
63.00
ARENA GRUESA
02070200010002
m3
0.22
4.50
AGUA PUESTA EN OBRA
0207070001
m3
2,148.95
16.50
CEMENTO PORTLAND TIPO I (42.5 kg)
0213010001
bol
13.19
8.00
TIZA BOLSA DE 40 kg
02130400010001
und
4.95
6.00
OCRE ROJO
02130600010001
kg
114.70
2.90
TUBERIA CPVC DE 1/2"
02150100010002
m
217.12
6.20
TUBERIA CPVC DE 2"
02150100010011
m
20.40
5.00
CODO CPVC DE 2" x 90°
02150200020005
und
78.20
10.00
REDUCCION CPVC DE 2" A 1/2"
02150600010004
und
1,246.31
4.00
MADERA TORNILLO
0231010001
p2
11.54
28.00
PINTURA ESMALTE
0240020001
gal
48.00
3.00
UNION UNIVERSAL DE FIERRO
GALVANIZADO DE 1/2"
02490600010001
und
24.00
3.00
VALVULA COMPUERTA DE 1/2"
0253180001
und
6,054.89
EQUIPOS
16.49
20.00
NIVEL TOPOGRAFICO
0301000002
día
41.23
50.00
TEODOLITO
03010000110001
día
48.43
HERRAMIENTAS MANUALES
0301010006
%mo
58.64
40.00
VIBRADOR A GASOLINA
03012900010004
día
92.18
7.86
MEZCLADORA DE CONCRETO
0301290003
hm
0.99
8.00
CORDEL
03014900010001
rll
257.96
TOTAL
S/.
11,279.31
28/04/2014 09:30:06p.m.
Fecha :

Partial preview of the text

Download relacion de insumos escalinatas and more Exercises Journalism in PDF only on Docsity!

S10 Página : 1

Precios y cantidades de recursos requeridos

Obra CONSTRUCCION, TRATAMIENTO PAISAJISTICO DEL PARQUE PRINCIPAL Y ESCALINATAS DEL C.P. PISCURRURAY

Fecha 01/04/ Lugar 120504 JUNIN - JUNIN - ULCUMAYO

Código Recurso Unidad Cantidad Precio S/. Parcial S/.

MANO DE OBRA

0101010003 OPERARIO hh 177.9600 10.20 1,815. 0101010004 OFICIAL hh 11.7300 9.00 105. 0101010005 PEON hh 428.9800 7.00 3,002. 01010300000005 OPERARIO TOPOGRAFO hh 6.6000 6.50 42.

4,966. MATERIALES

0201040001 PETROLEO D-2 gal 6.3700 14.00 89. 02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 97.0700 5.00 485. 02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 0.5000 4.20 2. ACERO CORRUGADO fy = 4200 kg/cm2 17.2600 4.30 74. GRADO 60

0204030001 kg

CLAVOS PARA MADERA CON CABEZA 12.9800 5.00 64.

DE 3"

02041200010005 kg

02070100010002 PIEDRA CHANCADA 1/2" m3 13.1900 65.00 857. 0207010007 PIEDRA DE CANTO RODADO m3 1.8400 60.50 111. 02070200010002 ARENA GRUESA m3 7.0300 63.00 442. 0207070001 AGUA PUESTA EN OBRA m3 0.0500 4.50 0. 0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 130.2400 16.50 2,148. 02130400010001 TIZA BOLSA DE 40 kg und 1.6500 8.00 13. 02130600010001 OCRE ROJO kg 0.8200 6.00 4. 02150100010002 TUBERIA CPVC DE 1/2" m 39.5500 2.90 114. 02150100010011 TUBERIA CPVC DE 2" m 35.0200 6.20 217. 02150200020005 CODO CPVC DE 2" x 90° und 4.0800 5.00 20. 02150600010004 REDUCCION CPVC DE 2" A 1/2" und 7.8200 10.00 78. 0231010001 MADERA TORNILLO p2 311.5800 4.00 1,246. 0240020001 PINTURA ESMALTE gal 0.4100 28.00 11. UNION UNIVERSAL DE FIERRO 16.0000 3.00 48. GALVANIZADO DE 1/2"

02490600010001 und

0253180001 VALVULA COMPUERTA DE 1/2" und 8.0000 3.00 24.

6,054. EQUIPOS

0301000002 NIVEL TOPOGRAFICO día 0.8200 20.00 16. 03010000110001 TEODOLITO día 0.8200 50.00 41. 0301010006 HERRAMIENTAS MANUALES %mo 48. 03012900010004 VIBRADOR A GASOLINA día 1.4700 40.00 58. 0301290003 MEZCLADORA DE CONCRETO hm 11.7300 7.86 92. 03014900010001 CORDEL rll 0.1200 8.00 0.

257.

TOTAL S/.^ 11,279.

Fecha : 28/04/2014 09:30:06p.m.