Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Residential Contractor Practice Exam: Questions and Answers, Exams of Building Materials and Systems

A valuable resource for students and professionals in the construction field. it presents a series of questions and answers covering various aspects of residential construction, including building materials, techniques, safety regulations, and project management. The questions test knowledge of minimum requirements, construction methods, and problem-solving skills relevant to practical applications. This resource is ideal for exam preparation or self-assessment.

Typology: Exams

2024/2025

Available from 05/06/2025

drillmaster
drillmaster 🇺🇸

5

(5)

839 documents

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Residential Contractor Practice Exam
With Correct Solutions Upgraded A+
What is the MINIMUM overlap for joints in polyethylene film moisture barrier applied over the exterior
of a below grade foundation wall?
6 inches
What is the MINIMUM height required for a nonabsorbent wall surface above a bathtub?
6 feet
Nails used to fasten concrete roofing tiles must penetrate the deck a MINIMUM of how many inches or
through the thickness of the deck, Whichever is less?
3/4 inch
How must rafters be framed to each other?
with a gusset plate
All of the following are benefits of platform construction as compared to balloon construction EXCEPT.
easier installation of plumbing and wiring
pf3
pf4

Partial preview of the text

Download Residential Contractor Practice Exam: Questions and Answers and more Exams Building Materials and Systems in PDF only on Docsity!

Residential Contractor Practice Exam

With Correct Solutions Upgraded A+

What is the MINIMUM overlap for joints in polyethylene film moisture barrier applied over the exterior of a below grade foundation wall?

6 inches

What is the MINIMUM height required for a nonabsorbent wall surface above a bathtub?

6 feet

Nails used to fasten concrete roofing tiles must penetrate the deck a MINIMUM of how many inches or through the thickness of the deck, Whichever is less?

3/4 inch

How must rafters be framed to each other?

with a gusset plate

All of the following are benefits of platform construction as compared to balloon construction EXCEPT.

easier installation of plumbing and wiring

750 feet of pipe is being laid at 0.5% slope. On a topographic map that has 6 inch contour intervals approximately how many intervals will be depicted on the map from one end of the pipe to the other?

8 contour intervals

Where would the most specific information about the size and location of windows be found in a set of construction drawings?

In the window schedule

A contractor should do all of the following when estimating a project EXCEPT.

assume ideal conditions

How many sheets of 4' X 8' X 1/2" drywall are needed for a room

10' X 15' with an 8' ceiling?

18 sheets

Which of the following would typically be covered by a contractor by a contractor's comprehensive general liability insurance policy?

damage to adjoining property from a crane accident.

Wall framing is being constructed one floor at a time. What type of wood framing method is being used?

platforming

Increasing the slump of concrete does which of the following?

increases its wetness

What is the MAXIMUM allowable size of each mesh opening in a safety net?

36 square inches

In drywall, what is J-trim used for?

to provide a finish edge