











Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
RHODE ISLAND Journeyman/Master Plumber Exam| Questions With 100% Correct & Verified Answers 2025/2026 Plumbing Code Regulation SBC-3 - Correct Answer State of Rhode Island Plumbing Code is known as: 4' 6" Below Grade - Correct Answer Water Services Shall Be Installed Not Less Than: Insulated/Heated or Both - Correct Answer Piping installed in exterior walls or areas subject to freezing must: 36" Below Grade - Correct Answer Building Sewers connected to a public sewer shall have a minimum coverage of: Under a water heater 6 gallons or greater that is elevated - Correct Answer A safe waste pan shall be installed 2" deep with 2" clearance around heater - Correct Answer A safe waste pan shall be at least 10' undisturbed compacted earth - Correct Answer Water service piping and building drain/sewer shall be separated by: Water line is installed minimum 12" above sewer line at highest point - Correct Answer Water service separation distance is not required if:
Typology: Exams
1 / 19
This page cannot be seen from the preview
Don't miss anything!