

Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
are tracks with track centers spaced less than 25 feet apart. - qUIZLET Adjacent tracks "Fouling" the track means being within __ feet of the field side of the nearest rail. - qUIZLET 4 A roadway worker has a "Right to Challenge". When concerned about compliance with on-track safety rules he/she must report his/her concerns to: -qUIZLET The EIC. A roadway worker shall not foul a track except : -qUIZLET When necessary for the performance of duty. A Watchman/Lookout is required for this type of on-track safety. -qUIZLET Train approach warning According to the FRA, when working in the foul: -qUIZLET A person or equipment could be struck by a train or on-track equipment.
Typology: Exams
1 / 3
This page cannot be seen from the preview
Don't miss anything!
___________________ are tracks with track centers spaced less than 25 feet apart. - qUIZLET Adjacent tracks "Fouling" the track means being within __ feet of the field side of the nearest rail. - qUIZLET 4 A roadway worker has a "Right to Challenge". When concerned about compliance with on-track safety rules he/she must report his/her concerns to: - qUIZLET The EIC. A roadway worker shall not foul a track except : - qUIZLET When necessary for the performance of duty. A Watchman/Lookout is required for this type of on-track safety. - qUIZLET Train approach warning According to the FRA, when working in the foul: - qUIZLET A person or equipment could be struck by a train or on-track equipment. At a minimum, contractor employees are required to wear the following PPE when they are on railroad property. - qUIZLET Hard hat, safety boots, safety glasses, safety vest If contractor employees are working without personal fall arrest gear over or adjacent to water that is deeper than 4 feet or where the danger of drowning exists, they must be equipped with the following: - qUIZLET Coast Guard approved life vest. Lifesaving skiff. Coast Guard approved life ring. ALL OF THE ABOVE. Roadway Worker Protection training - qUIZLET Must be renewed annually. Roadway workers are responsible to ascertain on track safety is provided: - qUIZLET Prior to fouling the track. Roadway workers who perform work in the fouling space must do all of the following except: - qUIZLET Must be trained in the General Code of Operating Rules
Slips, trips, and falls are common causes of injury while fouling track. Which of the following is NOT a recommended safe behavior to prevent slipping, tripping or falling? - qUIZLET Walk on ties between the rails when you have safe sight distance. The cardinal rule of railroading is: - qUIZLET Always expect a train or equipment to move on any track in either direction at any time. The following are roadway workers. - qUIZLET Contractor employees whose duties for a railroad client may require fouling a track. The following statement concerning working limits is NOT true. - qUIZLET On controlled track, working limits require physically preventing trains or equipment from entering a work site (for example: installing a derail, a discontinuity in the rail, or throwing a switch to isolate disturbed track). The FRA requires a personal fall arrest system be used by employees (working outside the rails and without handrails and walkways) on railroad bridges where the fall hazard is ___ feet or greater above the ground or water surface. - qUIZLET 12 The method of on-track safety used depends on what factors? - qUIZLET The work to be performed The type of track on which the work will be performed The weather and physical characteristics of the track ALL OF THE ABVOVE The person ultimately responsible for adhering to client-specific safety requirements is: - qUIZLET The employee To initially report severe hazards, begin a radio call with: - qUIZLET Emergency, emergency, emergency What must an EIC do before any roadway worker fouls a track? - qUIZLET Conduct an on-track safety job briefing. When a contractor is working for a railroad client, requirements from which agencies must be met? - qUIZLET FRA, Railroad Client, OSHA When are working limits required? - qUIZLET Any time work may delay or stop rail movements. Any time workers or equipment can not immediately get clear. Any time physical conditions compromise sightlines or the ability to get clear.