






Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
SCM 186 New Final Exam With Questions And Answers 100% Correct
Typology: Exams
1 / 12
This page cannot be seen from the preview
Don't miss anything!
What is the training and empowering frontline employees to solve a problemimmediately? - ANSWER Service recovery
Which of the following is the Japanese term used to describe continuous improvementefforts? - ANSWER Kaizen
Inspections should NOT take place - ANSWER After costly or irreversible processes Managing Quality helps build successful strategies of - ANSWER differentiation, lowcost, and response
Which of the following costs is NOT a cost of quality? - ANSWER research anddevelopment
Which of the following is NOT a common TQM tool? - ANSWER Queuing models One use of inventory is - ANSWER to provide a hedge against inflation Which of the following does NOT belong to holding costs? - ANSWER order processing ABC analysis divides an organization's on-hand inventory into three classes based upon- ANSWER annual dollar volume
Which of the following is NOT a type of inventory? - ANSWER MRP
Inventory control models assume that demand for an item is - ANSWER eitherindependent of or dependent on demand for other items
Inventory record accuracy would be decreased by - ANSWER increasing stockroomaccessibility
Which of the following about DRP is NOT true? - ANSWER DRP pushes inventory throughthe system
Which of the following statements is NOT true? - ANSWER for any product, somecomponents of that product are independent items
A phantom bill of materials is a bill of materials developed for - ANSWER a subassemblythat exists only temporarily
which of the following tools means tracing upward in the BOM from the component tothe parent item? - ANSWER pegging
The difference between a gross material requirement plan and a net requirement plan isthat - ANSWER the net requirement plan includes consideration of the inventory on hand, whereas the gross plan does not inventory reduction via JIT is an effective tool for identifying - ANSWER causes ofvariability
which of the following is NOT a feature of Toyota's new Japanese plant? - ANSWERinstead of perching char chassis on raised platforms, they dangle from overhead conveyors What is the formula for determining the number of kanban cards or containers? -ANSWER (Demand during lead time + Safety stock) / size of container
Most queuing models assume what type of discipline? - ANSWER FIFO When the assumptions of the M/M/1, M/M/S, M/D/1, and limited-population queuingmodels do not hold true, there are no other approaches available to us. - ANSWER false
Customers who _____ refuse to join the waiting line because it is too long to suit theirneeds or interests - ANSWER balk
As the service level increases, the cost of waiting time - ANSWER decreases Which type of queuing model would be best for analyzing an automated car wash? -ANSWER constant service (M/D/1)
Which of the following is NOT a type of "waiting cost?" - ANSWER adding an additionalserver
Which distribution most frequently describes the service time? - ANSWER Negativeexponential
A device or technique that ensures production of a good unit every time is a - ANSWERpoka-yoke
Which of the following statements is NOT true regarding the importance of the role thatan operations manager plays in addressing service quality? - ANSWER The manager may be able to influence the quality of the service but has little control over thecustomers expectation
Cause and effect diagrams are also known as - ANSWER fish-bone charts Which of the following DOES NOT increase profit by improving quality? - ANSWER
higher warranty costs Which of the following determinants of service quality means the firm performs theservice right the first time and the firm honors its promises? - ANSWER reliability
Which of the following is NOT one of the techniques for building employeeempowerment? - ANSWER eliminate formal organization structures such as teams and quality circles The American Society for Quality defines quality as - ANSWER the totality of featuresand characteristics of a product or service that bears on its ability to satisfy stated or implied needs Which of the following is NOT an external failure cost? - ANSWER scrap Which of the following TQM tools would be best suited for displaying the number ofstudents majoring in each business discipline? - ANSWER histogram
Which of the following determinants of service quality means approachability and easeof contact? - ANSWER access
Which of the following could reduce costs and increase profit? - ANSWER increasedproductivity
A successful quality strategy begins with - ANSWER an organizational culture thatfosters quality
For seasonal products, the service level should be set to equal: - ANSWER shortagecost / (overage cost + shortage cost)
A statistical model applicable when product demand or any other variable is not known
A single-period inventory model is NOT applicable for - ANSWER furniture A system that keeps track of each withdrawal or addition to inventory continuously is -ANSWER perpetual inventory system
Which of the following statements is NOT true about a fixed-period system? - ANSWER Afixed-period system is also called "continuous review."
Which of the following is NOT one of the assumptions of fixed-period systems? -ANSWER lead times are variable
Which of the following allows a segment of the master schedule to be designated as "notto be rescheduled"? - ANSWER time fence
What is a lot-sizing technique that orders the quantity needed during a predeterminedtime between orders? - ANSWER POQ
What is the lot-sizing technique that generates exactly what was required to meet theplan? - ANSWER lot-for-lot
What is a report showing the resource requirements in a work center for all workcurrently assigned there as well as all planned expected orders? - ANSWER load report
Which of the following statements is NOT true regarding ERP? - ANSWER ERP promisesslow, but accurate, information
What is an information system for identifying and planning the enterprise-wideresources needed to take, make, ship and account for customer orders? - ANSWER ERP
What is a list of quantities of components, ingredients and materials required to make aproduct? - ANSWER bill of material
What is a schedule that shows when an item must be ordered from suppliers or whenthe product of an item must be started to satisfy demand for the finished product by a particular date? - ANSWER gross material requirements plan Which of the following is NOT one of the benefits in MRP? - ANSWER increased inventorylevels
What is a time-phased stock-replenishment plan for all levels of the supply chain? -ANSWER DRP
A bill of materials for a menu item in a restaurant is also called a - ANSWER productspecification
What provides feedback to the capacity plan, master production schedule, andproduction plan so planning can be kept valid at all times? - ANSWER closed-loop MRP system Which of the following statements is NOT true about MRP? - ANSWER MRP is anindependent demand technique used in a production environment.
Which of the following pieces of information is NOT contained in a bill of material? -ANSWER lead times
Which of the following is NOT true about MRP limitations? - ANSWER MRP does not tellyou that a job needs to be completed on a certain week or day.
Which of the following statements is NOT true about the EOQ? - ANSWER The EOQ ispreferable when dependent demand exists
What is the act of breaking up an order and running part of it ahead of schedule? -ANSWER lot splitting
Which of the following is NOT a feature of Toyota's new Japanese plant? - ANSWERInstead of perching car chassis on raised platforms, they dangle from overhead conveyors JIT has an internal focus while lean production begins with an external focus on -ANSWER customers
Which of the following statements is true regarding lean sustainability? - ANSWER Leanand sustainability both seek to maximize resource and economic efficiency.
Which of the following attributes is NOT for lean operations? - ANSWER Build processesthat increase variability
Which of the following activities does NOT need to be virtually eliminated for a leanorganization? - ANSWER cross-training
What is the primary method in which airlines adjust to short-term fluctuations incustomer demand? - ANSWER personnel availability
Virtually every restaurant deals with its suppliers on - ANSWER a JIT basis How has McDonald's driven seconds out of the production process to be able toproduce made-to-order hamburgers in 45 seconds? - ANSWER It reconfigured its kitchen layout How do pharmacies implement lean operations to ensure that customers will alwaysreceive their medications upon demand? - ANSWER They develop community networks as backup systems What is the ability to respond with little penalty in time, cost, or customer value? -ANSWER flexibility
Which of the following statements is NOT true? - ANSWER Adding flexibility to theproduction process can be a major competitive advantage. Building flexibility into a production process is usually inexpensive, but difficult. What is a drawing of the movement of material, product or people? - ANSWER flowchart What is a flowchart with time added on the horizontal axis? - ANSWER process mapping Which of the following is NOT a tool for process analysis and design? - ANSWER Paretochart
Which of the quadrants in the service process matrix has high labor intensity and highcustomization? - ANSWER professional service
Which of the quadrants in the service process matrix has low labor intensity and lowcustomization? - ANSWER service factory
A fast food restaurant is an example of - ANSWER low customization and low degree oflabor
What is an electronically guided and controlled cart used to move materials? - ANSWERAGV
Which of the following is NOT a production technology that enhances production andproductivity? - ANSWER service blueprinting
Which of the following statements is NOT true regarding production technologies? -ANSWER Flexible manufacturing systems and computer-integrated manufacturing are increasing the distinction between low-volume/high-variety and high-volume/low-varietyproduction.