Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

SDEP Stormwater Exam 2025 With 100% Accurate Answers, Exams of Nursing

SDEP Stormwater Erosion is - correct answers ✔✔The process by which the land surface is worn away by the action of wind, water, and gravity. Which of the following describes sedimentation? - correct answers ✔✔The settling out of soil particles transported by water and wind. The main two types of soil erosion discussed in this training are: - correct answers ✔✔Wind and water An exa

Typology: Exams

2024/2025

Available from 07/02/2025

wGUEXAMCOLLECTIVE
wGUEXAMCOLLECTIVE 🇺🇸

3.6

(11)

3.7K documents

1 / 11

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
SDEP Stormwater
Erosion is - correct answers ✔✔The process by which the land surface is worn away by the
action of wind, water, and gravity.
Which of the following describes sedimentation? - correct answers ✔✔The settling out of soil
particles transported by water and wind.
The main two types of soil erosion discussed in this training are: - correct answers ✔✔Wind and
water
An example of a physical effect of erosion and sedimentation is: - correct answers ✔✔Increased
flooding.
What are the four factors that influence the erosion potential of an area? - correct answers
✔✔Soil characteristics, vegetative cover, topography, and climate.
Best Management Practices (BMPs) for erosion and sedimentation control include which of the
following? - correct answers ✔✔Silt fence and soil stabilization.
Projects with which of the following issues could experience an enforcement action and
possibly monetary penalties from regulatory agencies: - correct answers ✔✔Any of the above
When is Construction Generic Permit (CGP) coverage required? - correct answers ✔✔When
your site disturbs over 1 acre or is less than 1 acre and part of a larger project
pf3
pf4
pf5
pf8
pf9
pfa

Partial preview of the text

Download SDEP Stormwater Exam 2025 With 100% Accurate Answers and more Exams Nursing in PDF only on Docsity!

SDEP Stormwater

Erosion is - correct answers ✔✔The process by which the land surface is worn away by the action of wind, water, and gravity. Which of the following describes sedimentation? - correct answers ✔✔The settling out of soil particles transported by water and wind. The main two types of soil erosion discussed in this training are: - correct answers ✔✔Wind and water An example of a physical effect of erosion and sedimentation is: - correct answers ✔✔Increased flooding. What are the four factors that influence the erosion potential of an area? - correct answers ✔✔Soil characteristics, vegetative cover, topography, and climate. Best Management Practices (BMPs) for erosion and sedimentation control include which of the following? - correct answers ✔✔Silt fence and soil stabilization. Projects with which of the following issues could experience an enforcement action and possibly monetary penalties from regulatory agencies: - correct answers ✔✔Any of the above When is Construction Generic Permit (CGP) coverage required? - correct answers ✔✔When your site disturbs over 1 acre or is less than 1 acre and part of a larger project

What are the concerns when dewatering discharges go offsite? - correct answers ✔✔Turbidity, erosion, flooding, release of contaminated groundwater and other surface water quality violations. What areas should be evaluated during your weekly/rain event inspections? - correct answers ✔✔All of the above Which of the following is considered a surface water quality violation? - correct answers ✔✔Turbidity level is greater than 29 NTU above natural background conditions. Within ____ calendar days after your site has achieved final stabilization and all discharges are eliminated, you must submit your NOT form according to the Construction Generic Permit (CGP)

  • correct answers ✔✔14 days BMP maintenance activities can be classified into categories including __________. - correct answers ✔✔All of the above How long does the operator have to update or revise the stormwater pollution prevention plan (SWPPP) when site conditions have changed? - correct answers ✔✔7 Days Along with clearing, grading and excavating, the FDEP has determined that _____ also meet the definition of construction activity. - correct answers ✔✔demolition activities What is a major impact of sedimentation? - correct answers ✔✔All of the above A temporary sediment trap must have an initial storage volume of _____ cubic yards or _____ cubic feet per acre of drainage area, measured from the low point of the ground to the crest of the gravel outlet? - correct answers ✔✔134/3,

A detention basin is designed to store stormwater on site and then _________. - correct answers ✔✔Release at a controlled rate The four principle factors influencing soil erosion are: - correct answers ✔✔Vegetation, Soils, Topography, & Climate Keep runoff velocities _______and________runoff on the site. - correct answers ✔✔Low/Retain An important principle of erosion and sediment control is to implement a thorough ______ and _________program. - correct answers ✔✔Maintenance & Follow-Up Apply _______practices to prevent excessive on-site damage. - correct answers ✔✔Erosion Control During Phase I of site development even the smallest sites will require the installation of practices prior to site clearing and grading. - correct answers ✔✔Perimeter Control Proper fertilizer and pesticide application control under the GI-BMP Program is what kind of BMP? - correct answers ✔✔Perimeter Control In flowing water, turbidity curtains should be placed ______to the direction of flow in the receiving water body. - correct answers ✔✔Parallel (along) For a type III turbidity barrier installation, where are the anchor lines attached? - correct answers ✔✔Buoy

What do we want to avoid when constructing a retention basin with heavy equipment, especially on the basin floor? - correct answers ✔✔Excessive Compaction During construction, how often should inlets, outlets, and other control structures be inspected? - correct answers ✔✔Weekly (every 7 days) and After every 1/2" or greater rain storm What should you look for when inspecting storm drain inlets after major storms? - correct answers ✔✔Clogging, bypassing & piping What should you look for when inspecting outlets (i.e., mitered end) after major storms? - correct answers ✔✔Erosion and/or sediment The maximum spacing between check dams should be such that the _____of the upstream dam is at the same elevation as the _________of the downstream dam. - correct answers ✔✔Bottom/Top A stand of vegetation is considered fully established after how long? - correct answers ✔✔ 1 year An outlet protection device is designed to prevent scour at outlets and minimize erosion downstream by reducing the _____of concentrated stormwater flows. - correct answers ✔✔Velocity When placing riprap, great care must be taken to avoid damaging the _______while placing the stone. - correct answers ✔✔Geotextile What could happen to blown straw mulch which is not anchored, crimped, or tacked? - correct answers ✔✔It could be blown or washed away

During the building construction stage, two concerns for the inspector are: - correct answers ✔✔Increased Traffic and Excavation When should sediment control BMPs be removed? - correct answers ✔✔When the inspector & superintendent agree that the area is stabilized Unless otherwise specified, when should accumulated sediments be removed from a sediment control BMP? - correct answers ✔✔At 50% capacity In dealing with the public it is most important to follow proper legal procedures of your company and to always be _______ and ________. - correct answers ✔✔Courteous and Fair Where and how often should the inspector write a report? - correct answers ✔✔At the construction site, and every 7 calendar days or after a 1/2" rain event. When you arrive at the construction site, you should start your inspection by? - correct answers ✔✔Start at the lowest discharge point sampling with your turbidity meter and work your way back to the highest point on the job site What does undercutting of a silt fence indicate? - correct answers ✔✔Improper installation What do gullies in a channel bottom indicate? - correct answers ✔✔Too much velocity for the selected channel lining What parts of a stormwater pond are most likely to fail due to improper compaction? - correct answers ✔✔Structural elements (i.e. pipes)

What is the purpose of an exfiltration trench? - correct answers ✔✔Provide below ground retention The key to efficient and cost-effective erosion control is to plan construction activities in _______to reduce the erosion potential of the site. - correct answers ✔✔Phases Pollution source control planning on an active construction site should cover the following elements: - correct answers ✔✔All of the above. _____are the last line of defense and one of the most visible and maintenance-intensive BMPs on an active construction site. - correct answers ✔✔Perimeter controls A silt fence should only be installed for sediment capture under ______conditions. - correct answers ✔✔Sheet Flow When properly installing a silt fence, a trench shall be excavated approximately ______, backfilled and compacted. - correct answers ✔✔4" deep and 4" wide A _______is intended to divert overland sheet flow to a stabilized outlet or a sediment-trapping facility during the establishment of permanent stabilization on sloping, disturbed areas. - correct answers ✔✔temporary diversion berm Various storm drain inlet protection devices are available for different applications depending on the site conditions and type of inlet; however, all are for drainage areas no greater than ___________acre(s). - correct answers ✔✔ 1 If a sediment basin is designed as a permanent structure, the bottom of the basin should be excavated to 6-12 inces higher than the eventual bottom of the retention to ensure

Sediments should be removed before they reach _______ of the original height of any BMP. - correct answers ✔✔50% Your erosion control plan is the same as your SWPPP. - correct answers ✔✔False Best Management Practices (BMPs) are not necessary for a site smaller than one acre. - correct answers ✔✔False Mulching, seeding, and sodding are examples of soil stabilization methods. - correct answers ✔✔True Maximizing the amount of soil that is exposed on a construction site is an effective way to prevent and control erosion. - correct answers ✔✔False Clogged fish gills and reduced light for aquatic plants are examples of biological effects of erosion and sedimentation. - correct answers ✔✔True Vegetative cover plays an extremely important role in controlling erosion. - correct answers ✔✔True Sediment control practices require less maintenance than erosion control practices. - correct answers ✔✔False Curb inlet protection devices should have an overflow space so as to prevent flooding. - correct answers ✔✔True Physical impacts of erosion are inexpensive and easily managed. - correct answers ✔✔Falso

You don't have to control erosion on projects smaller than one acre. - correct answers ✔✔False Inspectors should let contractors know immediately if there is a problem with their site's erosion and sediment control measures. - correct answers ✔✔True Under the NPDES program you have 30 days to repair a damaged silt fence. - correct answers ✔✔False Silt and sand are the two soils that cause turbidity issues in Florida. - correct answers ✔✔False Rain events less than 0.50 inches do not require a NPDES inspection. - correct answers ✔✔True Temporary construction entrances need at least 6" of stone thickness to properly support vehicle weight. - correct answers ✔✔True A stand of permanent grass vegetation is considered established after two mowing events. - correct answers ✔✔False A paved flume should have hydrostatic relief holes when seasonal high water table or seepage from slopes is a concern. - correct answers ✔✔True Three examples of non-structural stormwater BMPs are: - correct answers ✔✔education, street sweeping & concrete wash-outs