Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

septic Exam Mastery Toolkit: Practice Questions & Proven Expert Solutions, Exams of Water and Wastewater Engineering

septic Exam Mastery Toolkit: Practice Questions & Proven Expert Solutions

Typology: Exams

2024/2025

Available from 04/13/2025

Shantelle
Shantelle 🇺🇸

5

(2)

3K documents

1 / 6

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
septic Final exam Questions
4 - Bedrock or groundwater must be at least ______ feet below the
bottom of the drain field trench
1000 - For 1-3 bedrooms, the minimum size of septic tank is _______
gallons.
Depth of the backfill material shall be a minimum of 12 inches and a maximum
of 24 inches - True
Failure to obtain a sewer permit can result in the revocation or denial of a
certified installers license - True
Changes in drain field design, after issuing a permit, must be approved by the
county environmental health department - True
Grey water( laundry water) need not to be connected to the septic tank -
False
Holding tanks are an acceptable alternative to an on-site wastewater treatment
system - False
pf3
pf4
pf5

Partial preview of the text

Download septic Exam Mastery Toolkit: Practice Questions & Proven Expert Solutions and more Exams Water and Wastewater Engineering in PDF only on Docsity!

septic Final exam Questions

4 - ✔ ✔ Bedrock or groundwater must be at least ______ feet below the bottom of the drain field trench 1000 - ✔ ✔ For 1-3 bedrooms, the minimum size of septic tank is _______ gallons. Depth of the backfill material shall be a minimum of 12 inches and a maximum of 24 inches - ✔ ✔ True Failure to obtain a sewer permit can result in the revocation or denial of a certified installers license - ✔ ✔ True Changes in drain field design, after issuing a permit, must be approved by the county environmental health department - ✔ ✔ True Grey water( laundry water) need not to be connected to the septic tank - ✔ ✔ False Holding tanks are an acceptable alternative to an on-site wastewater treatment system - ✔ ✔ False

24 - ✔ ✔ certified installers shall notify the county environmental health department ______ hoirs prior to completion of any installation 10 - ✔ ✔ Septic tanks shall have a minimum of _____ feet of schedule 40 PVC pipe entering and exiting the tank 10 - ✔ ✔ A drain field must be laid at least ____ feet horizontally from any existing or proposed water line 1/4 - ✔ ✔ The sewer line between the dwelling and septic tank shall be placed at a minimum downward slope of ______ in/ft 5 - ✔ ✔ Absorption trenches shall be separated by a minimum of _______ ft as measured from distribution pipe to distribution pipe. Distribution Box - ✔ ✔ ___________ may be used in gravity systems of lieu of manifolds Backfilling - ✔ ✔ The property owner and/or person installing a sewage system must notify the county environmental health department for a final inspection prior to ________

First step for proper procedure for approval of septic system - ✔ ✔ Submittal of permit application and perc. test results Second step for proper procedure for approval of septic system - ✔ ✔ Permit issued by the Environmental Health Department Third step for proper procedure for approval of septic system - ✔ ✔ Septic system installation Fourth step for proper procedure for approval of septic system - ✔ ✔ Call for inspection 24 hours in advance Fifth step for proper procedure for approval of septic system - ✔ ✔ Inspection of system by Environmental Health Department Sixth step for proper procedure for approval of septic system - ✔ ✔ Submittal of installer report form within 10 working day to the department Permit - ✔ ✔ No person shall commence construction of any building which requires connection to a sewage system unless a valid _______ has been issued 50 - ✔ ✔ a septic tank must be at least _____ feet from any well, lake, stream, swampy area, active irrigation ditch or 100 year floodplain

5 - ✔ ✔ when using a distribution box, a minimum of ________ feet of solid PVC pipe shall be used to connect to the distribution box 100 - ✔ ✔ The absorption trenches must be at least ______ feet from any well, lake, stream, swampy area, active irrigation ditch, or 100 year floodplain 100 - ✔ ✔ The maximum length of a drain field trench is ________ feet 15 - ✔ ✔ Slopes in excess of _____% are not suitable for a conventional on- site waste water system 36 - ✔ ✔ The bottom of the absorption trenches must not be more than ________ inches below the natural ground surface 500 - ✔ ✔ If more than ______ lineal feet of drainage is needed, then pressure distribution must be provided Replacement - ✔ ✔ Any on-site wastewater system must have necessary area for the primary system as well as the necessary area for a __________. 10 - ✔ ✔ A septic tank must be at least ______ feet from any foundation wall