Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

2016 JCOS Use & Finance Reports: MI University & College Renovations, Lecture notes of Finance

An overview of capital projects and renovations funded by the state of Michigan in universities and community colleges in 2016. Includes details on projects, costs, and institutions. Covers various universities and community colleges in Michigan.

What you will learn

  • How did these projects impact the respective universities and community colleges?
  • What were the specific projects and their costs at each institution?

Typology: Lecture notes

2021/2022

Uploaded on 09/12/2022

jamal33
jamal33 🇺🇸

4.3

(50)

341 documents

1 / 9

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Senate Fiscal Agency
01/06/2017
UNIVERSITY
2016 JCOS USE AND FINANCE REPORTS
January 1, 2016 through December 31, 2016
Calendar Year
University 2016 Total
Central Michigan University
Direct Digital Controls Conversion $2,875,000
SAC Pool Renovation (cost increase from $2,248,200 to $2,713,200) 465,000
Theunissen Stadium Baseball Performance Development Center 2,139,000
Central Subtotal: $5,479,000
Eastern Michigan University
Wise Hall (Housing) Renovation, Phase II and III 6,100,000
Energy Conservation Project - various buildings 6,300,000
Green Lot 2 Parking Lot 1,200,000
Wise Hall Renovation (Housing) Phase IV 2,800,000
Energy Conservation Project, Phase III 8,686,290
Loop 1 Replacement (Electrical Distribution System) 7,500,000
CHP Co-Generation 19,600,000
Swing Space (modifications to existing classrooms, offices, and other space) 3,000,000
Eastern Subtotal: $55,186,290
Ferris State University
Sanitary Sewer Replacement East and South Campus Apartment building demolition. New Intramural
fields. New Intercollegiate soccer field and artificial turf field construction 4,983,283
New West Campus Apartments (2 buildings, 15 apartment units) 3,600,000
Student Recreation Center mechanical system renovation 2,096,600
West Campus Apartments - renovations including new HVAC, painting, floor coverings & appliances. 1,000,000
North Residence Hall New building, 4 story, 400 bed suite style, 200 parking spaces. 28,150,000
Ferris Subtotal: $39,829,883
Grand Valley State University
Arena Roof Replacement - Allendale Campus (cost increase from $1.1 million to $1,460,000) 360,000
Performing Arts Center Addition and Renovation - Allendale Campus 20,000,000
Expand and Repave Parking Lots B1 & B2 - Allendale Campus 1,092,000
Lab Renovations - Padnos Hall of Science - Allendale Campus 2,960,800
Lubbers Stadium Video Scoreboard Installation - Allendale Campus 2,307,317
Service Building Addition - Allendale Campus 2,995,192
500 Lafayette Building (new construction) - Pew Campus 46,500,000
Grand Valley Subtotal: $76,215,309
Lake Superior State University
None 0
Lake Superior Subtotal: $0
pf3
pf4
pf5
pf8
pf9

Partial preview of the text

Download 2016 JCOS Use & Finance Reports: MI University & College Renovations and more Lecture notes Finance in PDF only on Docsity!

Senate Fiscal Agency

UNIVERSITY

2016 JCOS USE AND FINANCE REPORTS

January 1, 2016 through December 31, 2016

Calendar Year University 2016 Total Central Michigan University Direct Digital Controls Conversion (^) $2,875, SAC Pool Renovation (cost increase from $2,248,200 to $2,713,200) 465, Theunissen Stadium Baseball Performance Development Center 2,139,

Central Subtotal: $5,479,

Eastern Michigan University Wise Hall (Housing) Renovation, Phase II and III 6,100, Energy Conservation Project - various buildings 6,300, Green Lot 2 Parking Lot 1,200, Wise Hall Renovation (Housing) Phase IV 2,800, Energy Conservation Project, Phase III (^) 8,686, Loop 1 Replacement (Electrical Distribution System) 7,500, CHP Co-Generation 19,600, Swing Space (modifications to existing classrooms, offices, and other space) 3,000,

Eastern Subtotal: (^) $55,186,

Ferris State University Sanitary Sewer Replacement East and South Campus Apartment building demolition. New Intramural fields. New Intercollegiate soccer field and artificial turf field construction 4,983, New West Campus Apartments (2 buildings, 15 apartment units) 3,600, Student Recreation Center mechanical system renovation 2,096, West Campus Apartments - renovations including new HVAC, painting, floor coverings & appliances. 1,000, North Residence Hall New building, 4 story, 400 bed suite style, 200 parking spaces. 28,150,

Ferris Subtotal: $39,829,

Grand Valley State University Arena Roof Replacement - Allendale Campus (cost increase from $1.1 million to $1,460,000) 360, Performing Arts Center Addition and Renovation - Allendale Campus 20,000, Expand and Repave Parking Lots B1 & B2 - Allendale Campus 1,092, Lab Renovations - Padnos Hall of Science - Allendale Campus 2,960, Lubbers Stadium Video Scoreboard Installation - Allendale Campus 2,307, Service Building Addition - Allendale Campus 2,995, 500 Lafayette Building (new construction) - Pew Campus 46,500,

Grand Valley Subtotal: $76,215,

Lake Superior State University None 0

Lake Superior Subtotal: $

Senate Fiscal Agency

UNIVERSITY

Calendar Year University 2016 Total

Senate Fiscal Agency

UNIVERSITY

2016 JCOS USE AND FINANCE REPORTS

January 1, 2016 through December 31, 2016

Calendar Year University 2016 Total Wayne State University Harwell Field Baseball Building. (^) 1,660, Parking Structure #1 - 2016 Renovations 1,575, The Michael and Marian Ilitch School of Business (Cost increase from $50.0 million to $59.0 million) 9,000, Thompson Home Conversion to Student Housing 5,900, Phase I of the Campus Housing Facilities' Master Plan, Including Construction of Two New Apartment Buildings and Demolition of DeRoy Apartments (^) 113,930, Wayne State University Art Gallery Construction 2,400,

Wayne State Subtotal: $134,465,

Western Michigan University Lawson Ice Arena - Renovation (^) 7,571, Goldsworth Valley Enhancements 2,668, Stadium Drive Apartments Demolition & Remodeling 2,202, Land Purchase (Mel Trotter Property in Grand Rapids) 1,293,

Western Michigan Subtotal: (^) $13,736,

University Total: $758,129,

Senate Fiscal Agency

COMMUNITY COLLEGE

2016 JCOS USE AND FINANCE REPORTS

January 1, 2016 through December 31, 2016

Calendar Year

College 2016 Total

Alpena Community College None $

Alpena Subtotal: $

Bay de Noc Community College

Academic Success Center and Math/Science Building Renovations and Expansion 4,700,

Bay de Noc Subtotal: $4,700,

Delta College

C-Wing Solarium, Handrail, Founders Hall, Commons and Meeting Rooms Upgrades 1,275,

Delta Subtotal: $1,275,

Glen Oaks Community College

Student Housing 6,500,

Glen Oaks Subtotal: $6,500,

Gogebic Community College

None 0

Gogebic Subtotal: $

Grand Rapids Community College

Phyllis Fratzke Early Childhood Learning Laboratory (cost increase from $8.4 million to $8.7 million) 300,

Grand Rapids Subtotal: $300,

Henry Ford College

None 0

Henry Ford Subtotal: $

Senate Fiscal Agency

COMMUNITY COLLEGE

2016 JCOS USE AND FINANCE REPORTS

January 1, 2016 through December 31, 2016

Calendar Year

College 2016 Total

None 0

Mid Michigan Subtotal: $

Monroe County Community College

HVAC Project - Main Campus 16,151,

Monroe Subtotal: $16,151,

Montcalm Community College

None 0

Montcalm Subtotal: $

Mott Community College

Structural Repairs to Parking Decks 3,000,

Mott Subtotal: $3,000,

Muskegon Community College

None 0

Muskegon Subtotal: $

North Central Michigan College

None 0

North Central Subtotal: $

Northwestern Michigan College

Student Housing 8,268,

Dennos Museum Expansion 4,787,

Northwestern Subtotal: $13,056,

Senate Fiscal Agency

COMMUNITY COLLEGE

2016 JCOS USE AND FINANCE REPORTS

January 1, 2016 through December 31, 2016

Calendar Year

College 2016 Total

Oakland Community College RO1415-001, HVAC Replacement - Bldg. D (cost increase from $2,480,000 to $2,530,000) 50,

OR1415-003, Electrical Switchgear / Transformer Replacement - Bldg. E 1,500,

RO1415-001 HVAC Replacement Bldg. D

Oakland Subtotal: $1,550,

Schoolcraft College

North and South Ring Road Completion 3,334,

South Parking Lot Extension and Detention 1,536,

Site work and Infrastructure - South Campus 1,056,

Fiber Loop, Electrical, and Generators 2,336,

Schoolcraft Subtotal: $8,262,

Southwestern Michigan College

None 0

Southwestern Subtotal: $

St. Clair County Community College

SC4 Fieldhouse Renovation 3,000,

St. Clair Subtotal: $3,000,

Washtenaw Community College

None 0

Washtenaw Subtotal: $