Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
VA DEQ ESC Inspector Exam with verified solutions
Typology: Exams
1 / 38
This page cannot be seen from the preview
Don't miss anything!
VESCP - correct answer ✔ Virginia Erosion and Sediment Control Program
Minimum Standard 6 - correct answer ✔ Traps and Basins sediment traps and basins shall be designed and constructed based upon the total drainage area (not just disturbed area) to be served by the trap or basin Sediment Traps - correct answer ✔ minimum storage capacity shall be 134 cubic yards per acre of drainage area and shall only control drainage areas less than 3 acres stone outlet = trap Sediment Basins - correct answer ✔ surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to 3 acres shall be controlled by a basin; minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area; the outfall system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour duration; runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. Sediment Trapping Devises - correct answer ✔ 1. place near the lowest drainage points of a project
Minimum Standard 11 - correct answer ✔ Outlet Protection before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel prevent scour at stormwater outlets, protect outlet structure, and minimize potential for downstream erosion by reducing the velocity and energy of concentrated stormwater flows provides energy dissipation from the concentrated discharge from a pipe or channel in order to prevent erosion and provide a stable transition must construct at zero grade (so it slows down water to slow/prevent erosion) Minimum Standard 12 - correct answer ✔ Watercourse Construction when work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport, and stabilize the work area to the greatest extent possible during construction non-erodible material shall be used from the construction of causeways and cofferdams earthen fill may be used for these structures if armored by non-erodible cover materials
use of non-erodible materials prevents damage to the stream bed and sedimentation Minimum Standard 13 - correct answer ✔ when a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of non-erodible material shall be provided Utility Stream Crossing - correct answer ✔ help protect sediment from entering the stream from construction within approach areas and minimize amount of disturbance within the stream itself Temporary Stream Crossing - correct answer ✔ provide a means for construction traffic to cross flowing streams without damaging the channel or banks and keep sediment generated by construction traffic out of the stream Minimum Standard 14 - correct answer ✔ all applicable federal, state, and local requirements pertaining to working in or crossing love watercourses shall be met all applicable permits need to be obtained and need to be available on site before construction in live water courses may start water bodies may be identified through wetlands delineation, followed by a jurisdictional determination by the U.S. Army Corps of Engineers
underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria:
where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area street washing shall be allowed only after sediment is removed in this manner (this provision shall apply to individual development lots as well as to larger land-disturbing activities:
the criterion of the ESC regulations requires the designer verify the adequacy of all channels and pipes in the following manner:
Preservation Area Designation and Management Regulations (9VAC25-830); as soon as nonexempt status is determined, the requirements of the Act shall be immediately enforced. B. should a land-disturbing activity not begin during the 180-day period following plan approval or cease for more than 180 days, the VESCP authority may evaluate the existing approved erosion and sediment control plan to determine whether the plan still satisfies local and state erosion and sediment control criteria and to verify that all design factors are still valid; if VESCP authority find the previously filed plan to be inadequate, a modified plan shall be submitted and approved prior to the resumption of land-disturbing activity (no grand-fathering in erosion) Virginia Erosion and Sediment Control Program - correct answer ✔ put in by the General Assembly to operate at the local level; for programs to prevent the unreasonable degradation of properties, stream channels, waters, and other natural resources ESC Program Goal - correct answer ✔ "effective control of soil erosion, sediment deposition, and nonagricultural runoff...to prevent the unreasonable degradation of property, stream channels, waters, and other natural resources." (due to non-agricultural activities) protect downstream properties from
regulations for the effective control of soil erosion, sediment deposition, and non agricultural runoff that must be met in any control program to prevent the unreasonable degradation of properties, stream channels, waters, and other natural resources When compared to other land disturbing activities, why does construction produce so much more sediment volume? - correct answer ✔ replanting isn't done until the end of construction Federal Water Pollution Control Act - correct answer ✔ 1948 first major US law to address water pollution Congress passed major amendments in 1972 - Clean Water Act (consolidated control of water pollution policy under the administrator of the newly created US EPA; established National Pollutant Discharge Elimination System [NPDES] Permit Program, which in VA is administered by the VA Pollutant Discharge Elimination system [VPDES], to control water pollution by regulating point sources that discharge pollutants) Stormwater Discharges from Land Disturbing Activities - correct answer ✔ permitted under Construction General Permit (GP) through NPDES Statewide Regulatory Erosion and Sediment Control Program - correct answer ✔ began in 1960s (sedimentation problems were becoming increasingly evident in areas undergoing fast-paced urban development - Northern VA and Tidewater region)
Who has to be certified under the Local Erosion and Sediment Control Programs? - correct answer ✔ 1. program administrators
Combined Administrator - correct answer ✔ anyone who is responsible for performing the combined duties of program adminstrator, plan reviewer and project inspector of a VESCP authority 800 Hour Work Experience Form - correct answer ✔ individuals with at least 800 hours of on-the-job work experience as a stormwater management program administrator, inspector, plan reviewer, or combined administrator may complete the form on the DEQ website instead of completing the DEQ training courses *still must pass the exam Provisional Certification - correct answer ✔ from the day you complete your first required training courses and obtain a passing score on certification exam allows individuals to continue working for an authority while they seek full certification
*individuals can only be provisionally certified ONCE per classification (this is a difference between erosion and sediment control vs stormwater management) Your certificate is good for how long? - correct answer ✔ 3 years Can you re-certify in the last 12 months without losing the time of your certification? - correct answer ✔ Yes, time will be added to your certification you need 18 contact hours in 3 years Re-certification Options - correct answer ✔ 1. retake certification exam with PearsonVue before certificate expires