Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
VA DEQ SWM INSPECTOR EXAM 2025 WITH 100% ACCURATE SOLUTIONS
Typology: Exams
1 / 8
This page cannot be seen from the preview
Don't miss anything!
What element is targeted by water quality criteria? - correct answers ✔✔Phosphorous, it indicates pollution by bonding with other pollutants. At what % impervious cover are streams substantially affected? - correct answers ✔✔25% what is the site-based load limit for water quality? - correct answers ✔✔0.41 lbs/acre/yr total phosphorous Virginia Runoff Reduction Method- method of load calculations - correct answers ✔✔load calculations based on land cover type and soil type. what must happen to potentially harmful sheet flow runoff? - correct answers ✔✔Must be diverted to stormwater conveyance system. SWM ponds must be able to convey water safely up to what level storm event? - correct answers ✔✔must be able to safely convey up to a 100 yr storm. Define LDA - correct answers ✔✔Land disturbing activity; any man-made change to the land surface that potentially changes its runoff characteristics; includes clearing, grading, and excavation. What size LDA must comply with stormwater management regulation? in CPBA areas? - correct answers ✔✔anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more stringent locally.
what are some activities exempt from SWM regulations? - correct answers ✔✔mining, agriculture, sewer discharges, local reclamation programs, routine maintenance of preexisting operations, public emergency activity what term basically means a plea deal for stormwater offenders? - correct answers ✔✔consent order, which replaces penalties with fines. how long does VSMP authority have to review SWM plan? - correct answers ✔✔15 days to review and determine approval, and notify applicant. How often must a VSMP authority inspect an LDA? - correct answers ✔✔Periodically. all SWPPP requirements may be met by - correct answers ✔✔incorporating other plans into reference, or by developing missing elements. What must the DEQ issue to an operator before an LDA? - correct answers ✔✔a construction GP How soon after final grade of a site must vegetation be put in place? - correct answers ✔✔within 7 days. How long must operator keep routine inspection reports? - correct answers ✔✔At least 3 years after the GP expires/terminates. How long does operator have to revise SWPPP if authority deems it necessary? How long does local authority have to review any modifications to SWPPP? - correct answers ✔✔7 days for operator to make changes, 60 days for authority to review changes.
What legislation authorizes the VA SWM Program? - correct answers ✔✔The Virginia Stormwater Management Act What regulation administers the VA SWM Program? - correct answers ✔✔The Virginia Stormwater Management Program Regulation The Stormwater Management act requires the State Water Control Board to do what? - correct answers ✔✔permit, regulate, and control stormwater runoff How many days does DEQ have to complete review of real or potential inter-jurisdicitonal impacts upon request? - correct answers ✔✔90 days Who is required to maintain a certificate of competency by the Stormwater Management Act? - correct answers ✔✔staff of a stormwater program, anyone contracted by a VSMP authority, and all standard and specification holders A SWM Plan must be approved by who prior to land disturbance? - correct answers ✔✔the VSMP Program Authority What is the TP limit for a site? - correct answers ✔✔0.41 lbs/ac/yr The phosphorus load limit uses what % impervious cover? - correct answers ✔✔10% Part II B and II C water quantity criteria addresses: - correct answers ✔✔channel protection and flood protection Of all the plans included in the SWPPP, which two must be approved? - correct answers ✔✔the SWM and ESC Plans
Does a SWM plan address runoff during or after construction? - correct answers ✔✔post- construction What is the lower limit of imperviousness which could result in stream degradation? - correct answers ✔✔10% If land disturbance occurs as a result of emergency work, what is the timeline for advising the VSMP authority of the disturbance? - correct answers ✔✔within 7 days of commencing the LDA and a permit application must be submitted within 30 days DEQ is responsible for enforcing the ______ while locality _______ are responsible for enforcing local ordinances. - correct answers ✔✔Construction GP, VSMP BMPs use these three mechanisms to control pollution: - correct answers ✔✔Infiltration, settling, and vegetative uptake How long does a locality VSMP authority have to determine the completeness of a SWM plan? - correct answers ✔✔15 days Every year, the locality VSMP must submit information to DEQ. When is this due, and what info must be provided? - correct answers ✔✔Due by Oct. 1, and must include: new types of SWM facilities, geographic coordinates of them, acres treated, and surface waters/karst features into which they discharge. A locality VSMP must be at least as stringent as what state permit? - correct answers ✔✔The construction GP
How quickly must an unauthorized discharge to surface water be reported to the DEQ? - correct answers ✔✔Verbal notification within 24 hours, written notification within 5 days If an area is not at final grade, but may remain dormant for more than 14 days, how quickly must temporary stabilization be applied? - correct answers ✔✔Within 7 days If a bare area is at final grade, when must permanent or temporary soil stabilization be applied?
What legal agreement allows VSMP inspectors to access property for conducting post- construction BMP inspections? - correct answers ✔✔A long-term maintenance agreement Who must sign and seal a construction record drawing, and when must it be submitted to the VSMP authority? - correct answers ✔✔must be signed by a professional registered in VA. Must be submitted before permit termination. How much time does the VSMP authority have to terminate any bonds or securities provided by the operator? - correct answers ✔✔Within 60 days of completing the requirements of the permit conditions How often must a VSMP authority inspect a SWM facility post-construction? - correct answers ✔✔Every 5 years, OR the owner may submit reports completed be a qualified person on an annual basis