Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Walmart / Sam's Safety, Employment, Waste, Stormwater Compliance Certification Exam Questions And Answers Latest Update
Typology: Exams
1 / 15
This page cannot be seen from the preview
Don't miss anything!
The 1970's law that set into place the regulation of stormwater is: -the federal pollution discharge elimination rule -the stormwater pollution control act -the national water control act -the clean water act - correct answer ✅the clean water act Requirements for managing stormwater activity on a construction site are outlined in the following regulation -NOI -NPDES -NOT -DOT - correct answer ✅NPDES Which of the following is never an allowable stormwater discharge from a construction site? -discharge from burrow areas -discharge from contaminated groundwater
-discharge from dewatering activities -discharge from staging areas - correct answer ✅discharge from contaminated groundwater The notice of termination can be filed when -general contractor applies seed and mulch near the end of the project -at the end of rainy season -all construction activity, inside and outside the building, is complete and permanent stabilization has been verified as adequate to meet permit requirements -only offsite street work is left - correct answer ✅all construction activity, inside and outside the building, is complete and permanent stabilization has been verified as adequate to meet permit requirements Relative to stormwater permitting, all of the following must occur before construction starts except -prepare the SWPPP -determine the operator(s)
The SWPPP implementation sequence may be modified -as the qualified inspector deems necessary -after consulting with the project SWPPP designer (CEC) and, if required, the project owner and receiving written approval -it you experience a rain event on your project site -after discussing runoff problems with your BMP installer - correct answer ✅after consulting with the project SWPPP designer (CEC) and, if required, the project owner and receiving written approval A SWPPP site map will show all of the following except -locations of BMPs -Notices of Violation -phasing and sequences -limits of disturbance - correct answer ✅Notices of Violation Which of the following information is to be posted at the entrance to the site? -construction site notice
-permit authorization -location of the SWPPP -all of the above - correct answer ✅all of the above Which of the following is not a beneficial use of water -swimming -drinking -flushing a spill down a storm drain -industrial and agricultural water supply - correct answer ✅flushing a spill down a storm drain When installing and maintaining a check dam make sure -stormwater is directed around the check dam -void spaces are filled with sediment -the low point (overflow) of the check dam is in the middle of the channel -the highpoint of the check dam is in the middle of the channel - correct answer ✅the low point (overflow) of the check dam is in the middle of the channel
-rolled erosion control products -diversions -check dams -slope drains - correct answer ✅rolled erosion control products Which erosion control best management practice increases water infiltration, dissipates rainfall energy and slows overland flow of stormwater -asphalt pavement -vegetation -silt fence -sedimentation - correct answer ✅vegetation Of the following factors that influence erosion rates, the one a contractor has the most control over is -soil permeability -precipitation -topography
-groundcover - correct answer ✅groundcover Temporary stabilization should be implemented -immediately on all disturbed areas that are likely to or will remain inactive for 14-days or more -only when erosion is occurring -pior to a regulatory inspection -before construction activities begin - correct answer ✅immediately on all disturbed areas that are likely to or will remain inactive for 14-days or more The primary purpose of a construction exit is -to remove sediment from construction site vehicles and minimize trackouts -to control stormwater discharge from the site -to have a place to post your SWPPP notice -to minimize the need for temporary stabilization - correct answer ✅to remove sediment from construction site vehicles and minimize trackouts
-near the edge of the property - correct answer ✅on level ground, in low construction traffic areas the following must be marked on Site Maps in the job site trailer as works progessess -all superintendents and compliance officer names -the name of the agency issuing the applicable general permits -the dates when BMP changes or additions take place -the dates of all SWPPP designers and agency inspections - correct answer ✅the dates when BMP changes or additions take place While inspecting field BMPs, the SWPPP inspector should perform all of the following except -note BMPs in need of repair or maintenance -verify BMPs and installed per plans and specifications -assume BMPs are in good condition from a distance -observe effectiveness of BMPs - correct answer ✅assume BMPs are in good condition from a distance
If your site is inspected by US EPA, or another regulatory agency, you should -be courteous -attend their inspection -allow access to site documentation -all of the above - correct answer ✅all of the above What must be done before I can give a worker a badge and access to the site -look at the worker's I-9, drivers license, and social security card -look at the WV form and attached list, verify the worker's name is on the list and look at the worker's current I.D. -nothing, everyone is welcomed -complete a form I-9 - correct answer ✅look at the WV form and attached list, verify the worker's name is on the list and look at the worker's current I.D.
-everyone - correct answer ✅everyone If a worker is removed during an audit, are they allowed back on site? -yes, if they are work authorized -no, the auditor removed them for a reason -yes, they need to work -workers removed during an audit are not allowed back, or onto another site unless the auditor verifies the worker is work authorized - correct answer ✅workers removed during an audit are not allowed back, or onto another site unless the auditor verifies the worker is work authorized In addition to worker verification and badging, what other employment incidents and/or regulatory contacts may happen -immigration, e-verify, wages, and joint employment -immigration, harassment, discrimination, and joint employment
-immigration, e-verify, wages, harassment, discrimination, and joint employment (be aware of not only federal laws but also the state and local municipalities you work in) -immigration, e-verify, harassment, and joint employment - correct answer ✅immigration, e-verify, wages, harassment, discrimination, and joint employment (be aware of not only federal laws but also the state and local municipalities you work in) If a direct Walmart contractor comes on site, do they need to produce a WV form for their workers -Yes -No - correct answer ✅No Who is allowed on a construction site -Walmart associates -GC/subcontractor workers -regulators -all of the above - correct answer ✅all of the above