XACTIMATE CERTIFICATION TEST WITH ALL ANSWERS, Exams of Advanced Education

XACTIMATE CERTIFICATION TEST WITH ALL ANSWERS

Typology: Exams

2024/2025

Available from 07/03/2025

davian-mwangi
davian-mwangi 🇺🇸

1.3K documents

1 / 5

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
XACTIMATE CERTIFICATION TEST
WITH ALL ANSWERS CORRECT
DRY 1/2 - correct answer-"1/2'' drywall hung, taped floated, ready for paint, light
texture"
DRY PATCH - correct answer-Drywall patcy
DRY 1/2 +++ - correct answer-smooth wall
PLA G2 - correct answer-Plaster 2 coats
PNT SP - correct answer-Seal & paint - one coat each
PNT P - correct answer-paint one coat
PNT S - correct answer-seal - one coat
PNT SP2 - correct answer-seal 1, paint 2
PNT S2 - correct answer-Seal two coats
PLA WLATH - correct answer-Includes labor to remove plaster and wood lath, to
prepare framing surfaces for installation of new lining and discard all debris into a job
site waste receptacle. Remove wood lath not included in demo formula
DRY LF - correct answer-Drywall replacement per LF - up to 2" tall used for water
claims
DRY ARCADD - correct answer-Additional charge for hanging and finishing drywall
in an arched wall opening or arched window
DRY RND - correct answer-Vinyl or metal corner bead and installation labor. This
item is the difference in cost between regular corner bead and are bullnose corner
bead. Add labor is also added because bullnose corners are more labor intensive
DRY ADD - correct answer-Additional labor for installing drywall on ceilings or walls
that are 11' to 14' high. Add for the square footage that is 11-14' high, not the total
SF of the room.
PNT UL - correct answer-Sealer and labor
pf3
pf4
pf5

Partial preview of the text

Download XACTIMATE CERTIFICATION TEST WITH ALL ANSWERS and more Exams Advanced Education in PDF only on Docsity!

XACTIMATE CERTIFICATION TEST

WITH ALL ANSWERS CORRECT

DRY 1/2 - correct answer-"1/2'' drywall hung, taped floated, ready for paint, light texture" DRY PATCH - correct answer-Drywall patcy DRY 1/2 +++ - correct answer-smooth wall PLA G2 - correct answer-Plaster 2 coats PNT SP - correct answer-Seal & paint - one coat each PNT P - correct answer-paint one coat PNT S - correct answer-seal - one coat PNT SP2 - correct answer-seal 1, paint 2 PNT S2 - correct answer-Seal two coats PLA WLATH - correct answer-Includes labor to remove plaster and wood lath, to prepare framing surfaces for installation of new lining and discard all debris into a job site waste receptacle. Remove wood lath not included in demo formula DRY LF - correct answer-Drywall replacement per LF - up to 2" tall used for water claims DRY ARCADD - correct answer-Additional charge for hanging and finishing drywall in an arched wall opening or arched window DRY RND - correct answer-Vinyl or metal corner bead and installation labor. This item is the difference in cost between regular corner bead and are bullnose corner bead. Add labor is also added because bullnose corners are more labor intensive DRY ADD - correct answer-Additional labor for installing drywall on ceilings or walls that are 11' to 14' high. Add for the square footage that is 11-14' high, not the total SF of the room. PNT UL - correct answer-Sealer and labor

PNT WGRID - correct answer-Latex paint, sandpaper and labor. LF of wood window grid. ACT AV - correct answer-Acoustic ceiling tile PNT ACT - correct answer-Paint acoustic ceiling tile WPR AV - correct answer-Average wallpaper WPR GRASS - correct answer-Grasscloth wallpaper PNT WPR - correct answer-Paint wallpaper LIT AV - correct answer-Average quality lighting fixture LIT RS - correct answer-Detach & reset lighting fixture LIT RC - correct answer-Recessed lighting fixture LIT FNL - correct answer-Ceiling fan & light LIT FN - correct answer-ceiling fan no light CLN FN - correct answer-clean ceiling fan & light ELE OS - correct answer-outlet ELE OSS - correct answer-switch ELE TS - correct answer-Thermostat ELE OSRS - correct answer-detach and reset outlet/switch ELE SMOKE - correct answer-smoke detector ELE SMOKERS - correct answer-detach and reset smoke detector ELE CHIME - correct answer-door chime with wiring 1-5 door chime buttons. Labor cost to remove door chime and to discard in a job site waste receptacle. Door chime buttons see ELE CBUTTON ELE CHIMERS - correct answer-detach and reset chime ELE OLR - correct answer-Low voltage wiring, outlet box and labor. Quality CATV or equal, up to 40 ft of wire, non-metallic box. ELE OL - correct answer-Includes telephone or speaker outlet, cover and installation.

FNC BH - correct answer-2 1/4" hardwood baseboard FNC BH+ - correct answer-2 1/4hardwood baseboard with molded detail FNC BLP - correct answer-Plastic baseboard FNC BR - correct answer-reset FNC BRS - correct answer-detach and reset FNC BTILE - correct answer-add on for tearing out from/base from tile/grout FNC QRBSRS - correct answer-base cap or shoe / quarter round detach and reset FNC SHOE - correct answer-base FNC BAL - correct answer-balustrade FNC CWN - correct answer-3 1/4" crown molding paint grade FNC CHR - correct answer-2 1/4 chair rails paint grade FNC HRRS - correct answer-detach and reset handrail FNC HR - correct answer-handrail FNC C - correct answer-2 1/4 casing FNC SKRT - correct answer-1" x 12" trim board, finish nails, labor to shape the top edge of the skirting with a router, and labor to install. Excludes painting. Quality MDF or paint grade finger-joint board FNC BLKR - correct answer-plinth blocks and rosettes. includes plinth block, finish nails, and installation. 3/4 x 3 1/2 x 6 1/2 MDF FNC ATTIC - correct answer-1/2 drywall, casing, finish nails, and installation labor FNC CBL - correct answer-wood corbel, finish nails, construction adhesive and installation labor. 2" to 4" wide hardwood MSD AVB1 - correct answer-Additional cost for a beveled edge mirror. MSD AVJ - correct answer-add metal J channel to a mirror MSD AV - correct answer-1/4" plate glass FNH DSTP - correct answer-wall or floor mounted door stop and installation labor. FNH ROBE - correct answer-Robe hook and installation labor.

FNH DC - correct answer-door closer and installation labor FNH PEEP - correct answer-peep hole and installation plastic or brass TBA GBAR - correct answer-stainless steel grab bar and installation labor FNC SILL/STOL - correct answer-window sill, stool & apron. Includes sill, finish nails and installation labor. 1x3 paint