



Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A comprehensive set of questions and verified answers for the xactimate level 2 certification exam. it covers various aspects of the software, including project defaults, contact management, sketch tools, estimate items, and report generation. Ideal for those preparing for the xactimate level 2 exam, this resource offers a valuable opportunity to test knowledge and identify areas needing further study. The questions are designed to assess understanding of key features and functionalities within the xactimate software.
Typology: Exams
1 / 5
This page cannot be seen from the preview
Don't miss anything!
When you are working in several estimates that are in the same city/state/zip, you are able to set your Project Loss Defaults to that city/state/zip to save time. - ANSWER True In Xactimate, where would you go to change the default wall thickness for all future estimates? - ANSWER Control Center/Preferences This is a Model Statement shortcut used to pre-fill data that has already been recorded in an estimate. - ANSWER Token Which of the following is NOT an option through the Contact Manager? - ANSWER Users You can data transfer an estimate via XactAnalysis to another Xactimate user without knowing their XactNet address. - ANSWER False The only way to update your Xactimate version is through a disc. - ANSWER False The ability to merge data already saved from your contact manager directly into an estimate does not exist. - ANSWER False Xactimate can be viewed in English and then printed in a different language - ANSWER True Which of the following is not an option from the Project tab? - ANSWER Complete a sketch within the project
Which of the following is not a wall type option for stairs? - ANSWER Missing below stairs The loss recap automatically updates from an estimate. - ANSWER true When using the Custom staircase tool after one click the RED measurement shows what? ANSWER The total rise of the staircase This tool allows you to change the direction that the sloped or peaked ceiling is running? ANSWER Orientation When creating a new level how many feet will sketch add or subtract from the previous level? ANSWER 9 In Sketch the keyboard shortcut to reset your visible windows is CTRL + SHIFT + R. - ANSWER True It is not possible to re-organize the members of the Grouping pane in Estimate Items - ANSWER False Which of the following are Roof Variables - ANSWER SF, SQ, HIP, VAL, R, P An alternate method of estimating for a loss can be done from the Sketch Tab. - ANSWER True Draw lines to connect the following Staircase Variable to its definition - ANSWER a. Tread Count TCAS b. Wall and Ceiling Area Above Staircase WCAS c. Wall Area Below Staircase WBS d. Floor Area Above Staircase FAS
If more than images per page are selected to print in the Estimate Reports window, the image detail defaults to print on a separate page? - ANSWER 2 Once you creat a Model Statement (opening or closing), it is only available for that estimate you created it in. - ANSWER False Fille in the correct token name for the following token descriptions - ANSWER Claim Number--Claim Num Date Recieved--DATE RECIEVED Estimator Name--ESTIMATOR NAME Insured's Name--INSURED NAME Summary ACV Loss--SUM ACV iNFORMATION SUCH AS DATES AND PERSONNEL CAN BE FOUND IN WHAT WINDOW OF AN ESTIMATE? - ANSWER Claim Info > Inusred Info Under claim Info > Parameters where would you use tokens? - ANSWER Opening statements, closing statements. Under the claim info tab, where can you set depreciation defaults? - ANSWER Parameters Name the four options available for staircase wall types. - ANSWER Full Missing (end to end) Missing above stairs Partially missing above stairs After using square break tool, why should you click on the wall and check the measurement? - ANSWER After you place a break, you can see how the measurements change based on wall thinkness
How would you alter the default orientation when dealing with a sloped or peaked ceiling? - ANSWER Clic the orientation button and move cursor to a wall. then click when you see a red arrow. When using the staircase tool, after clicking to place the first step, what does the red measurement show? - ANSWER The total rise of the staircase. A related-item search method could be used exactly the same as a similar-item search method- ANSWER False This cat code would most likely be used when adding a miscellaneous item for a custom vanity - ANSWER CAB What 3 types of items does waste not automatically get included in the cost of the item? - ANSWER Carpet, Ninyl Sheet Goods, Shingles Once and item is on the cusror which mouse button (right or left click) will allow you to select additional items relating to the original item? - ANSWER Right click Where can you look to see what is or is not included in the cost of an item? - ANSWER Item information window.