XACTIMATE LEVEL 2 CERTIFICATE TEST WITH ALL ANSWERS UPDATED LATELY, Exams of Advanced Education

XACTIMATE LEVEL 2 CERTIFICATE TEST WITH ALL ANSWERS UPDATED LATELY.

Typology: Exams

2024/2025

Available from 07/03/2025

davian-mwangi
davian-mwangi 🇺🇸

1.3K documents

1 / 4

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
XACTIMATE LEVEL 2 CERTIFICATE
TEST WITH ALL ANSWERS UPDATED
LATELY
When working on multiple estimates in the same city/state/zip, you can set up
Project Loss Defaults for that city/state/zip to save time. - correct answer-True
Where in Xactimate can you go to change the default wall thickness for all future
estimates? - correct answer-Control Center/Preferences
This is a shortcut used in Model Statements to pre-fill data that has already been
recorded in an estimate. - correct answer-Token
Which of the following is not an option through the Contact Manager? - correct
answer-Users
You can data transfer an estimate via XactAnalysis to another Xactimate user
without knowing their XactNet address. - correct answer-False
The only way to update your Xactimate version is through a disc. - correct answer-
False
The ability to merge data already saved from your contact manager directly into an
estimate does not
exist. - correct answer-False
Xactimate can be viewed in English and printed in a different language - correct
answer-True
Which of the following is not an option from the Project tab? - correct answer-
Complete a sketch within the project
Which of the following is not a wall type option for stairs? - correct answer-Missing
below stairs
The loss recap automatically updates from an estimate. - correct answer-true
When using the Custom staircase tool, after clicking once, the RED measurement
indicates what? - correct answer-The total rise of the staircase
pf3
pf4

Partial preview of the text

Download XACTIMATE LEVEL 2 CERTIFICATE TEST WITH ALL ANSWERS UPDATED LATELY and more Exams Advanced Education in PDF only on Docsity!

XACTIMATE LEVEL 2 CERTIFICATE

TEST WITH ALL ANSWERS UPDATED

LATELY

When working on multiple estimates in the same city/state/zip, you can set up Project Loss Defaults for that city/state/zip to save time. - correct answer-True Where in Xactimate can you go to change the default wall thickness for all future estimates? - correct answer-Control Center/Preferences This is a shortcut used in Model Statements to pre-fill data that has already been recorded in an estimate. - correct answer-Token Which of the following is not an option through the Contact Manager? - correct answer-Users You can data transfer an estimate via XactAnalysis to another Xactimate user without knowing their XactNet address. - correct answer-False The only way to update your Xactimate version is through a disc. - correct answer- False The ability to merge data already saved from your contact manager directly into an estimate does not exist. - correct answer-False Xactimate can be viewed in English and printed in a different language - correct answer-True Which of the following is not an option from the Project tab? - correct answer- Complete a sketch within the project Which of the following is not a wall type option for stairs? - correct answer-Missing below stairs The loss recap automatically updates from an estimate. - correct answer-true When using the Custom staircase tool, after clicking once, the RED measurement indicates what? - correct answer-The total rise of the staircase

This tool allows you to change the direction that the sloped or peaked ceiling is running? - correct answer-Orientation When adding a new level, how many feet will sketch add or subtract from the previous level? - correct answer- In Sketch, the keyboard shortcut for resetting your visible windows is CTRL + SHIFT

  • R. - correct answer-True There is no way to re-organize the members of the Grouping pane in Estimate Items
  • correct answer-False Which of the following are Roof Variables - correct answer-SF, SQ, HIP, VAL, R, P An alternate method of estimating for a loss can be done from the Sketch Tab. - correct answer-True Draw lines to match the following Staircase Variable to its correct definition - correct answer-a. Tread Count TCAS b. Wall and Ceiling Area Above Staircase WCAS c. Wall Area Below Staircase WBS d. Floor Area Above Staircase FAS e. Perimeter of Ceiling Below Staircase PCBS You can add line items while viewing your sketch in 3D mode - correct answer-True When using subvariables, what room number does Xactimate assign to the main area of the room? - correct answer- It is possible to add a line item for tile floor covering at the same time as adding a reference area. - correct answer-True Which of the following columns in the Estimate Items/Quick Entry window allow you to track who entered the line item? - correct answer-User Column If the activity of an item is changed, the unit price for the item does not change. - correct answer-False __________ are those additional activities, such as labor or material assumption, which may be required to complete a task. - correct answer-Supporting Events To keep the ridge from shifting when modifying a single rafter length on a gable roof, use the following tool: - correct answer-Roof Locks This view tool allows you to view the overlay of carpet and vinyl once those items are graphically placed in the room. - correct answer-Flooring Overlay Which of the following are options for adding new grouping members in the grouping window? - correct answer-Append, Insert, Attach

Once and item is on the cusror which mouse button (right or left click) will allow you to select additional items relating to the original item? - correct answer-Right click Where can you look to see what is or is not included in the cost of an item? - correct answer-Item information window.