Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

XACTIMATE LEVEL 2 CERTIFICATION EXAM WITH ALL ANSWERS LATELY UPDATED., Exams of Advanced Education

XACTIMATE LEVEL 2 CERTIFICATION EXAM WITH ALL ANSWERS LATELY UPDATED.

Typology: Exams

2024/2025

Available from 07/03/2025

davian-mwangi
davian-mwangi 🇺🇸

1.3K documents

1 / 5

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
XACTIMATE LEVEL 2 CERTIFICATION
EXAM WITH ALL ANSWERS LATELY
UPDATED
Claim Info - correct answer-contact information and location of the loss or repair -
can also enter information regarding the customer's policy
Creating a new estimate steps - correct answer-Click new project, make sure
Estimate is selected in the top field, highlight the project name and type the name of
the project or keep "date based" project name, choose correct profile and select,
click create. Select a price list and click next. Select tax jurisdiction for estimate and
click Done.
How do you add a new project? - correct answer-1 Add a new project from local
page, click New Project button. New project window appears.
2 Change default name to (example) XW-Lopez- followed by your initials
3 Click "create" to add the new project - the project will appear on your dashboard
Changing Project Profiles from Carrier vs Contractor - correct answer-1 Save and
Exit the project
2 From the local page, click on the estimate
3 From the pull-out menu, click duplicate
4 Verify the project has a unique name
5 Select the correct Profile from the menu
6 Click OK, the duplicated project is now available
Creating a New Estimate: - correct answer-1. From Xactimate Dashboard Local
Page, click NEW PROJECT
2. Make sure Estimate is selected in the top field
3. Highlight the project name (based on today's date) and type the name of the
project or you can change to name specific
4. Make sure the correct profile is selected in the profile field
5. Click create
6 Select a price list you want to use
Where do you click to create a new project? - correct answer-New Project
You can open a project directly from the Cloud > My Projects page.
True or False - correct answer-False
Where would you mark your project completed? - correct answer-Click Complete
Where would you add line items to your estimate? - correct answer-click Estimate
Items
pf3
pf4
pf5

Partial preview of the text

Download XACTIMATE LEVEL 2 CERTIFICATION EXAM WITH ALL ANSWERS LATELY UPDATED. and more Exams Advanced Education in PDF only on Docsity!

XACTIMATE LEVEL 2 CERTIFICATION

EXAM WITH ALL ANSWERS LATELY

UPDATED

Claim Info - correct answer-contact information and location of the loss or repair - can also enter information regarding the customer's policy Creating a new estimate steps - correct answer-Click new project, make sure Estimate is selected in the top field, highlight the project name and type the name of the project or keep "date based" project name, choose correct profile and select, click create. Select a price list and click next. Select tax jurisdiction for estimate and click Done. How do you add a new project? - correct answer-1 Add a new project from local page, click New Project button. New project window appears. 2 Change default name to (example) XW-Lopez- followed by your initials 3 Click "create" to add the new project - the project will appear on your dashboard Changing Project Profiles from Carrier vs Contractor - correct answer-1 Save and Exit the project 2 From the local page, click on the estimate 3 From the pull-out menu, click duplicate 4 Verify the project has a unique name 5 Select the correct Profile from the menu 6 Click OK, the duplicated project is now available Creating a New Estimate: - correct answer-1. From Xactimate Dashboard Local Page, click NEW PROJECT

  1. Make sure Estimate is selected in the top field
  2. Highlight the project name (based on today's date) and type the name of the project or you can change to name specific
  3. Make sure the correct profile is selected in the profile field
  4. Click create 6 Select a price list you want to use Where do you click to create a new project? - correct answer-New Project You can open a project directly from the Cloud > My Projects page. True or False - correct answer-False Where would you mark your project completed? - correct answer-Click Complete Where would you add line items to your estimate? - correct answer-click Estimate Items

Where would you record important dates relating to the loss? - correct answer-Under Claim Info When entering information in the Insured Info tab, you can only enter one address per estimate? True or False - correct answer-False The coverage/loss tab is not available in which profile? - correct answer-Contractor How often are Xactimate price lists typically updated? - correct answer-Monthly Name the four sections that comprise the Sketch window... - correct answer-Tools Search Sketch workspace Items Zoom to extend - correct answer-I need my entire Sketch diagram displayed quickly Plan View - correct answer-This is the default view I see when clicking on the Sketch tab Zoom to Selection - correct answer-I need to zoom in closer to see my door measurements Plan Tool - correct answer-I need to move my drawing to the top of the Sketch Workspace Zoom In - correct answer-My diagram is too small. I need to zoom in to make it larger You can use the Missing Wall tool to delete an entire wall? True or False - correct answer-True Using the click and drag method of adding an object like a Doorway to sketch changes the default size of the door? True or False - correct answer-True What color must the measurement be before you can click on it and type in the new measurement? - correct answer-Blue When typing in a foot and inch measurement, a comma can be used to separate the two numbers, i.e. 5,6? True or False - correct answer-True Where can you deduct for a wall opening (door, window, missing wall)? - correct answer-Properties window Before dragging a wall handle, holding down the which key on your keyboard will create a new room? - correct answer-CNTRL - control What does a number in parentheses represent when it follows a room name? e.g., closet (1) - correct answer-The room is a Sub-group What is the keyboard shortcut for the Undo function? - correct answer-Ctrl+Z The variable PF stands for floor perimeter. True or False - correct answer-True Replace - correct answer-+ Plus sign Remove - correct answer-- Minus sign Remove & Replace - correct answer-& Install Only - correct answer-I Detach & Reset - correct answer-R Material Only - correct answer-M This quick entry field represents a two-letter code for each item quantity. Example, SF (square feet), EA (each) UN (unit), etc - correct answer-Unit of measurement Which quick entry field determines the item's unit price by describing exactly what is to happen to that specified item? - correct answer-Item Activity (Act) field Refined Topics and Search Results - correct answer-Two feature options appear once you click on an item in Reference Search image. Once a roof has been placed, the roof type can be changed where? - correct answer-Properties window

Three types of items do not have waste automatically included in cost of the item are? - correct answer-Carpet Vinyl Sheet Goods Shingles What is the calculation to add 15% waste manually to a line item? - correct answer- (Variable)1.15 (e.g. SQ1.15) To move your cursor from one field to another in quick entry, tap the Tab key successively on your keyboard. True or False - correct answer-True When your cursor is in a field that has a drop-down arrow, press the Spacebar on your keyboard to view an expanded list of options. True or False - correct answer- True From any Quick Entry field, press ____on your keyboard to move your cursor to the next line to begin adding new line items. - correct answer-Enter Making an estimate Completed is necessary to upload it back to XactAnalysis. True or False - correct answer-False When you change the status of an estimate to Completed, the Inspection will check for common estimating mistakes. True or False - correct answer-True If you want to make the changes to an estimate that has a status of Completed, you must do what?? - correct answer-Change the estimate status to In Progress In some cases, you may leave inspection result items if they are correct for the scope of the estimate. True or False - correct answer-True You will not be able to close the Required Information window until you have documented an explanation and checked the Indicate why the result is to be ignored check box. True or False - correct answer-False Once an item is on the cursor, which click allow you to select additional items relating to the original item? - correct answer-Right Click You can use the default calculation or type in your own equation when adding items. True or False - correct answer-True What key can be used to remove an item from your cursor? - correct answer-Esc What tool can be used to change the direction of the floor coverings for carpet and vinyl? - correct answer-Floor Orientation If the activity of an Item is changed, the unit price for the item does not change. True or False - correct answer-False Where can you look to see what is or is not included in the cost of an item? - correct answer-Item Information window Items with default calculations should never be changed. True or False - correct answer-False It is often a good idea to click the ____ button to make sure the rendering of the roof resembles the actual roof. - correct answer-3D Roof Locks - correct answer-Keep the ridge from shifting when modifying a single rafter length on a gable roof Ridge - correct answer-A horizontal line at the junction of the top edges of two sloping roof surfaces Roof Span - correct answer-The clear distance that a framing member carries a load without support between structural supports, it is the horizontal distance from eave to eave Rafter - correct answer-Lumber used to support the roof sheeting and roof loads. Generally, 2x10s and 2x12s are used. On a flat roof these are sometimes called roof joists

Slope - correct answer-The incline angle of a roof surface, given as a ration of the rise (in inches) to the run (in feet). How do you create an overbuild? - correct answer-First use the SQUARE BREAK TOOL and then hold down the CTRL key prior to clicking and dragging the roof handle out.