Docsity
Docsity

Prepara tus exámenes
Prepara tus exámenes

Prepara tus exámenes y mejora tus resultados gracias a la gran cantidad de recursos disponibles en Docsity


Consigue puntos base para descargar
Consigue puntos base para descargar

Gana puntos ayudando a otros estudiantes o consíguelos activando un Plan Premium


Orientación Universidad
Orientación Universidad

ACOPLAMIENTO DE SISTEMAS MOTOR BOMBA, Guías, Proyectos, Investigaciones de Ingenieria de Mantenimiento

MANUAL DE ACOPLES Y LAS ESPECIFICACIONES DE COMO SE INSTALA Y CONSIDERACIONES

Tipo: Guías, Proyectos, Investigaciones

2022/2023

Subido el 16/09/2023

1 / 14

Toggle sidebar

Esta página no es visible en la vista previa

¡No te pierdas las partes importantes!

bg1
POLY-NORM®-M
Operating/Assembly instructions
KTR-N
Sheet:
Edition:
49810 EN
1 of 14
1
Please observe protection
note ISO 16016.
Drawn:
2018-01-18 Pz/Kr
Replacing:
KTR-N 49514
Verified:
2018-02-15 Pz
Replaced by:
POLY-NORM®-M
Flexible jaw coupling type AFN
for finish bored, pilot bored and unbored couplings
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe

Vista previa parcial del texto

¡Descarga ACOPLAMIENTO DE SISTEMAS MOTOR BOMBA y más Guías, Proyectos, Investigaciones en PDF de Ingenieria de Mantenimiento solo en Docsity!

POLY-NORM

®

- M

Operating/Assembly instructions

Sheet:

Edition:

1 of 14

Please observe protection note ISO 16016. Drawn: 2018 - 01 - 18 Pz/Kr Replacing: KTR-N 49514 POLY-NORM ® -M

Flexible jaw coupling type AFN

for finish bored, pilot bored and unbored couplings

Type AFN

POLY-NORM

®

- M

Operating/Assembly instructions

Sheet:

Edition:

2 of 14

Please observe protection note ISO 16016. Drawn: 2018 - 01 - 18 Pz/Kr Replacing: KTR-N 49514

POLY-NORM®-M is a torsionally flexible jaw coupling. It is able to compensate for shaft misalignment, for

example caused by manufacturing inaccuracies, thermal expansion, etc.

1 Technical data 3

2 Advice 3

2.1 General advice 3

2.2 Safety and advice symbols 4

2.3 General hazard warnings 4

2.4 Intended use 4

2.5 Coupling selection 5

2.6 Reference to EC Machinery Directive 2006/42/EC 5

3 Storage, transport and packaging 5

3.1 Storage 5

3.2 Transport and packaging 5

4 Assembly 6

4.1 Components of the couplings 6

4.2 Advice on remachining 6

4.3 Assembly of the coupling (general) 7

4.4 Assembly of type AFN 7

4.5 Displacements - alignment of the coupling 9

5 Start-up 10

6 Breakdowns, causes and elimination 11

7 Disposal 12

8 Maintenance and service 13

9 Spares inventory, customer service addresses 14

Table of contents

POLY-NORM

®

- M

Operating/Assembly instructions

Sheet:

Edition:

4 of 14

Please observe protection note ISO 16016. Drawn: 2018 - 01 - 18 Pz/Kr Replacing: KTR-N 49514

STOP Warning of personal injury

This symbol indicates notes which may contribute to

preventing bodily injuries or serious bodily injuries that

may result in death.

!^ Warning of product damages^

This symbol indicates notes which may contribute to

preventing material or machine damage.

General advice

This symbol indicates notes which may contribute to

preventing adverse results or conditions.

Warning of hot surfaces

This symbol indicates notes which may contribute to

preventing burns with hot surfaces resulting in light to

serious bodily injuries.

STOP

With assembly, operation and maintenance of the coupling it has to be made sure that the

entire drive train is secured against accidental switch-on. You may be seriously hurt by

rotating parts. Please make absolutely sure to read through and observe the following

safety indications.

 All operations on and with the coupling have to be performed taking into account "safety first".

 Please make sure to switch off the power pack before you perform your work on the coupling.

 Secure the power pack against accidental switch-on, e. g. by providing warning signs at the place of switch-on

or removing the fuse for current supply.

 Do not reach into the operating area of the coupling as long as it is in operation.

 Please secure the coupling against accidental contact. Please provide for the necessary protection devices

and covers.

You may only assemble, operate and maintain the coupling if you

 have carefully read through the operating/assembly instructions and understood them

 had technical training

 are authorized by your company

The coupling may only be used in accordance with the technical data (see chapter 1). Unauthorized modifications

on the coupling design are not admissible. We will not assume liability for any damage that may arise. In the

interest of further development we reserve the right for technical modifications.

The POLY-NORM®-M described in here corresponds to the technical status at the time of printing of these

operating/assembly instructions.

2 Advice

2.2 Safety and advice symbols

2.3 General hazard warnings

2.4 Intended use

POLY-NORM

®

- M

Operating/Assembly instructions

Sheet:

Edition:

5 of 14

Please observe protection note ISO 16016. Drawn: 2018 - 01 - 18 Pz/Kr Replacing: KTR-N 49514 !

For a permanent and failure-free operation of the coupling it must be selected according to

the selection instructions (according to DIN 740 part 2) for the particular application (see

catalogue drive technology).

If the operating conditions (performance, speed, modifications on engine and machine)

change, the coupling selection must be reviewed.

Please make sure that the technical data regarding torque refer to the elastomers only. The

transmittable torque of the shaft-hub-connection must be reviewed by the customer and is

subject to his responsibility.

For drives subject to torsional vibrations (drives with cyclic stress due to torsional vibrations) it is necessary to

perform a torsional vibration calculation to ensure a reliable selection. Typical drives subject to torsional vibrations

are e. g. drives with diesel engines, piston pumps, piston compressors etc. If requested, KTR will perform the

coupling selection and the torsional vibration calculation.

The couplings supplied by KTR should be considered as components, not machines or partly completed

machines according to EC Machinery Directive 2006/42/EC. Consequently KTR does not have to issue a

declaration of incorporation. For details about safe assembly, start-up and safe operation please refer to the

present operating/assembly instructions considering the warnings.

The coupling hubs are supplied in preserved condition and can be stored at a dry and roofed place for 6 - 9

months. The features of the individual elastomers remain unchanged for up to 5 years with favourable stock

conditions.

!

The storage rooms must not include any ozone-generating devices like e. g. fluorescent

light sources, mercury-vapour lamps or electrical high-voltage appliances.

Humid storage rooms are not suitable.

Please make sure that condensation is not generated. The best relative air humidity is less

than 65 %.

!

In order to avoid any injuries and any kind of damage please always make use of proper

transport and lifting equipment.

The couplings are packed differently each depending on size, number and kind of transport. Unless otherwise

contractually agreed, packaging will follow the in-house packaging specifications of KTR.

2 Advice

2.5 Coupling selection

2.6 Reference to EC Machinery Directive 2006/42/EC

3 Storage, transport and packaging

3.1 Storage

3.2 Transport and packaging

POLY-NORM

®

- M

Operating/Assembly instructions

Sheet:

Edition:

7 of 14

Please observe protection note ISO 16016. Drawn: 2018 - 01 - 18 Pz/Kr Replacing: KTR-N 49514

We recommend to inspect bores, shaft, keyway and feather key for dimensional accuracy

before assembly.

Heating the hubs lightly (approx. 80 °C) allows for an easier mounting on the shaft.

STOP

Touching the heated hubs causes burns.

Please wear safety gloves.

With the assembly make sure that the distance dimension E (see table 1) is observed so that

the coupling components are not in contact with each other during the operation.

Disregarding this advice may cause damage to the coupling.

In order to avoid any injuries please always make use of proper lifting equipment.

Tapped holes exist on the face and outside diameter of the coupling serving for using proper sling gears or lifting

equipment, respectively. If proper sling gears are used they should be dismounted after assembly of the coupling.

 Mount the flange hub (component 1) and hub (component 2) on the shafts of driving and driven side

(see illustration 3).

With assembly of the hub (component 2) it has to be made sure that the hub side with a

recess (dimension d 3 ) is shifted on first (see illustration 5).

 The internal sides of the hubs (component 1 and 2) must be flush with the front sides of the shafts.

 Shift the cam ring (component 4) over the hub and take it off carefully or keep the cam ring via a proper lifting

device (see illustration 4).

 Shift the power pack with the flange hub in axial direction until the distance dimension E is achieved

(see illustration 5, table 1).

 If the power packs are already firmly assembled, shifting the coupling hubs axially on the shafts allows for

adjusting the distance dimension E (see illustration 5, table 1).

The transmittable torque of the shaft-hub-connection must be reviewed by the customer and

is subject to his responsibility.

Illustration 3 Illustration 4 Illustration 5 STOP

4 Assembly

4.3 Assembly of the coupling (general)

4.4 Assembly of type AFN

POLY-NORM

®

- M

Operating/Assembly instructions

Sheet:

Edition:

8 of 14

Please observe protection note ISO 16016. Drawn: 2018 - 01 - 18 Pz/Kr Replacing: KTR-N 49514

 Push the cam ring onto the hub and align the bore of the flange hub and the cam ring flush.

 Screw up the flange hub and cam ring via hexagon fit bolts (component 7) and hexagon nuts (component 8)

and tighten them evenly to the tightening torques TA1 specified in table 2 by means of a torque key

(see illustration 6).

 Align the unit screwed up versus the hub such that the cavities between hub and cam ring are evenly

arranged.

 Insert the individual elastomers (component 5) in the cavities between hub and cam ring as per the order

specified in illustration 7 and 8. Please make sure that the arrow on the individual elastomers points towards

the direction of the shaft.

With the assembly make sure that the individual elastomers on the cam ring do not protude

since otherwise it is not possible to mount the cover segments (component 3).

For an easier assembly of the individual elastomers we recommend to use a fitting

lubricant, e. g. REMA TIP TOP Universal mounting paste or a silicone oil having a viscosity

of 1000 cSt.

The respective number of individual elastomers must be used in every cavity (see table 3).

Illustration 6 Illustration 7 Illustration 8: Example of size 700

 Hand-tighten the cover segments (component 3) with the cap screws DIN EN ISO 4762 (component 6) for the

time being (see illustration 9 and 10).

With the assembly make sure that a gap of at least 5 mm between hub and cover segments

is observed (see illustration 10).

 Tighten the cap screws evenly to the tightening torques TA2 specified in table 2 by means of a suitable torque

key.

Having started up the coupling, the tightening torque of the screws and the wear of the

individual elastomers have to be inspected at regular maintenance intervals.

4 Assembly

4.4 Assembly of type AFN

POLY-NORM

®

- M

Operating/Assembly instructions

Sheet:

Edition:

10 of 14

Please observe protection note ISO 16016. Drawn: 2018 - 01 - 18 Pz/Kr Replacing: KTR-N 49514

Examples of the displacement

combinations specified in illustration 12:

Example 1:

Kr = 30 %

Kw = 70 %

Example 2:

Kr = 60 %

Kw = 40 %

Illustration 12: Combinations of displacement

Ktotal = Kr + Kw  100 %

Table 4: Displacement figures

Size 302 502 703 Max. axial displacement Ka [mm] 3.0 3.0 5. Max. radial displacement Kr [mm] with 2.5^ 3.0^ 3. Max. angular displacement Kw [degree] with 0.5 0.5 0.

Before start-up of the coupling, please inspect the alignment and adjust, if necessary, and also inspect all screw

connections for the tightening torques specified.

Finally the coupling protection against accidental contact must be fitted. It is required in accordance with

DIN EN ISO 12100 (Safety of Machinery) and directive 2014/14/EU and must protect against

 access with the little finger

 falling down of solid foreign objects.

The cover may provide for openings intended for necessary heat dissipation. These openings have to comply with

DIN EN ISO 13857.

The cover must be electrically conductive and included in the equipotential bonding. Bellhousings (magnesium

share below 7.5 %) made of aluminium and damping rings (NBR) can be used as connecting element between

pump and electric motor. The cover may only be taken off with standstill of the unit.

During operation of the coupling, please pay attention to

 different operating noise

 vibrations occurring.

!

If you note any irregularities with the coupling during operation, the drive unit must be

switched off immediately. The cause of the breakdown must be specified by means of the

table „Breakdowns“ and, if possible, be eliminated according to the proposals. The potential

breakdowns mentioned can be hints only. To find out the cause all operating factors and

machine components must be considered.

4 Assembly

4.5 Displacements - alignment of the coupling

5 Start-up

POLY-NORM

®

- M

Operating/Assembly instructions

Sheet:

Edition:

11 of 14

Please observe protection note ISO 16016. Drawn: 2018 - 01 - 18 Pz/Kr Replacing: KTR-N 49514

The below-mentioned failures can lead to a use of the POLY-NORM®-M coupling other than intended. In addition

to the specifications given in these operating and assembly instructions please make sure to avoid such failures.

The errors listed can only be clues to search for the failures. When searching for the failure the adjacent

components must generally be considered.

General failures with use other than intended:

 Important data for the coupling selection were not forwarded.

 The calculation of the shaft-hub-connection was not considered.

 Coupling components with damage occurred during transport are assembled.

 If the heated hubs are assembled, the permissible temperature is exceeded.

 The clearance of the components to be assembled is not coordinated with one another.

 Tightening torques have been fallen below/exceeded.

 Components are mixed up by mistake/assembled incorrectly.

 Wrong or no individual elastomers are inserted in the coupling.

 No original KTR components (purchased parts) are used.

 Old/already worn off individual elastomers or those which are stored for too long are used.

 Maintenance intervals are not observed.

Breakdowns Causes Elimination Different operating noise and/or vibrations occuring Misalignment

  1. Set the unit out of operation
  2. Eliminate the reason for misalignment (e. g. loose foundation bolts, breaking of the engine mount, heat expansion of unit components, modification of the installation dimension E of the coupling)
  3. For inspection of wear see chapter 8 Wear of elastomers, short- term torque transmission due to metal contact
  4. Set the unit out of operation
  5. Disassemble the coupling, remove remainders of the elastomers
  6. Inspect coupling components and replace coupling components that have been damaged
  7. Insert elastomers, assemble coupling components
  8. Inspect alignment, adjust if necessary Axial fastening of hub working loose
  9. Set the unit out of operation
  10. Inspect alignment of coupling
  11. Inspect axial fastening of hubs and correct, if necessary
  12. For inspection of wear see chapter 8 Breaking of cams Wear of elastomers, torque transmission by metal contact
  13. Set the unit out of operation
  14. Replace complete coupling
  15. Inspect alignment Breaking of the cams due to high impact energy/overload
  16. Set the unit out of operation
  17. Replace complete coupling
  18. Inspect alignment
  19. Find out the reason for overload Operating parameters do not meet with the performance of the coupling
  20. Set the unit out of operation
  21. Review the operating parameters and select a bigger coupling (consider mounting space)
  22. Assemble new coupling size
  23. Inspect alignment Operating error of the unit
  24. Set the unit out of operation
  25. Replace complete coupling
  26. Inspect alignment
  27. Instruct and train the service staff

6 Breakdowns, causes and elimination

POLY-NORM

®

- M

Operating/Assembly instructions

Sheet:

Edition:

13 of 14

Please observe protection note ISO 16016. Drawn: 2018 - 01 - 18 Pz/Kr Replacing: KTR-N 49514

POLY-NORM®-M is a low-maintenance coupling. We recommend to perform a visual inspection on the coupling

at least once a year. Please pay special attention to the condition of the individual elastomer of the coupling.

 Since the flexible machine bearings of the driving and driven side settle during the course of load, inspect the

alignment of the coupling and re-align the coupling, if necessary.

 The coupling components have to be inspected for damages.

 Small volumes of rubber dust are normal, with bigger volumes lubrication of the individual elastomers is

necessary.

 The screw connections have to be inspected visually.

!

Having started up the coupling the tightening torques of the screws have to be inspected

during the usual inspection intervals.

In order to perform a visual inspection of the

individual components, remove the cover

segments from the coupling so that the front sides

of the individual elastomers can be seen. For that

purpose you do not need to take the individual

elastomers out of the coupling. Anyway, the

individual elastomers should be replaced if one of

the following items applies:

 Having reached the limits of wear

 Material deterioration of individual elastomers

 Individual elastomers damaged or torn

Illustration 13

8 Maintenance and service

POLY-NORM

®

- M

Operating/Assembly instructions

Sheet:

Edition:

14 of 14

Please observe protection note ISO 16016. Drawn: 2018 - 01 - 18 Pz/Kr Replacing: KTR-N 49514

When reaching the limit of wear and tear Xmax., the individual elastomers must be replaced. Here the backlash

between the cams of the coupling and the individual elastomers must be inspected by means of a feeler gauge

(see illustration 14). Several individual elastomers should be inspected.

Reaching the limits for replacing depends on the operating conditions and the existing operating parameters. With

wear  20 % of the original elastomer thickness it is necessary to replace the individual elements.

In order to ensure a long service life of the coupling, the shaft ends have to be accurately

aligned. Please absolutely observe the displacement figures specified (see table 4). If the

figures are exceeded, the coupling will be damaged.

The more accurate the alignment of the coupling, the longer is its service life.

Illustration 14: Inspection of the limit of wear Illustration 15: Wear of elastomers

Table 5: Limits of wear

Size (^) Thickness of elastomer Limits of wear [mm] Wear Xmax. 302 38.0 7. 502 67.0 13. 703 82.5 16.

A basic requirement to ensure the readiness for use of the coupling is a stock of the most important spare parts

on site.

Contact addresses of the KTR partners for spare parts and orders can be obtained from the KTR homepage at

www.ktr.com.

KTR does not assume any liability or warranty for the use of spare parts and accessories

which are not provided by KTR and for the damages which may incur as a result.

8 Maintenance and service

9 Spares inventory, customer service addresses